Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-Finance | 1 | Accepted-Finance FOUND ELIGIBLE | |
| 2 | 2₹2.1 L+₹6,000 (2.87%)Accepted-Finance | 2 | Accepted-Finance FOUND ELIGIBLE | |
| 3 | 3₹2.2 L+₹11,595 (5.55%)Accepted-Finance BHAGWATI NAGAR JAMMU | 3 | Accepted-Finance FOUND ELIGIBLE | |
| 4 | 4₹2.2 L+₹15,515 (7.42%)Accepted-Finance | 4 | Accepted-Finance FOUND ELIGIBLE | |
| 5 | 5₹2.4 L+₹26,390 (12.6%)Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 5 | Accepted-Finance FOUND ELIGIBLE |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
20 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/NowshERA
Reconditioning of 300 KVA voltage stabilizer along with other allied works at LIS Nud
2020_IFC_100199_1
20/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
8 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹5,000
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
22 Jul 2020
10 Jul 2020
21 Jul 2020
11 Jul 2020
20 Jul 2020
11 Jul 2020
13 Jul 2020
180 days
Reconditioning 0f 300 Kva voltage stabilizer installed at LIS Nud by means of disconnecting of the Voltage stabilizer from the main power supply (Incoming and Outgoing cables) . Loading into mechanical transport by using mobile crane and skilled labour for shifting the equipment to the workshop. Unloading in the same manner at workshop. Opening and removing of the panel, loosening /dismantling of the top cover, nut and bolts. Lifting of inside transformer assembly with the chain pulley block for extraction of the complete unit. Dismantling/Extraction of the damaged /burnt coils ( 2 nos.) by way of the dismantling of the core assembly and extraction of the burnt copper wire with the help of manual labour and suitable tools/tackles. Rewinding of two coils by using new copper wire of the superior quality. Replacement of the rotor assembly (3 nos.) by way of p/f of new components, replacing all the damaged /burnt components. P/F of new panel accessories to panel of stabilizer by replacing the damaged with the new one. The job involves P/F of 1 No’s volt meter (Output Meter), Meter phase indicator, phase indicator lamps. Boiling of the T.oil in stabilizer by draining it out of the tank. Heating with heater coils to make it completely moisture free, filling it back after complete cleaning and drying of tank. Providing filling of 110 litre t.oil to make up for the deficit. Reinstallation of the stabilizer frame with transformer assembly. Lowering of complete unit in tank after p/f of shock proof gasket and body with nuts/bolts and shifting back the equipment from the workshop to the site of LIS. Unloading at LIS by using mobile crane and skilled labour. Installation inside the LIS by using specified tools and tackles .Connecting power cables by p/f of new thimbles of the requisite capacity and testing on load . Complete job includes the cost of material, labour charges, transportation charges, hiring charges of crane, other tools / tackles required at site. Complete Job
Impregnation of 100 HP Induction Motor, Unit No.2 installed at LIS by way of disconnecting all electrical connection decoupling the motor from the pump, removing from the base plate . Dismantling the motor ,extraction of the rotor and bearing. cleaning of rotor and stator winding with petrol and chemical cleanser. Cleaning of dust/carbon etc from the stator with the help of compressed air/ CCL4/organic solvent . Thereafter applying Dr. Beck. Compound on stator winding by spraying impregnation process and drying the same with hot air circulation process. Checking IR value of the winding with the help of megohmmeter. Repairing of the end covers at the driving end and the non- driving end of the motor. providing and fitting of 02 no. bearing (DE and NDE). Assembling of motor. Carriage / transportation of the motors back from workshop to the site of installation at the LIS. Installation / leveling of the motor over the base frame by providing / fitting nut bolts, washers etc., making of electrical connections, replacing worn out nuts, bolts for the electrical connection. Alignment & coupling with pump. Complete testing & commissioning of the pumping unit. Job includes cost of all material, transportation charges, head load and labour charges for skilled / semi skilled labour, hire charges for tools & tackles at the LIS. Complete Job
Strengthening of 4.5 cusec discharge 36m head horizontal centrifugal pump of pumping Unit No.II, installed at LIS Nud. The job involves de-coupling of pump from the motor and removing top cover of the HC pump, extracting the internal impeller assembly together with bearing brackets and shifting the same to workshop by using mechanical transport. Complete dismantling of the impeller assembly in the workshop. Rebuilding of pump shaft and impeller by using good quality electrodes. Thereafter turning/machining of rebuild pump shaft and impeller on lathe machine for proper size . P/F of 2-No bushes & 1-No bearing as per sample. Re-assembling of impeller shaft assembly & shifting back to L.I.S. Lowering and Fitment of impeller/ shaft assembly in the pump at proper position & closing the top cover by p/f of new nuts, bolts, washers and packing. Setting the foundation by means of replacement of old worn out studs. Job also includes replacement of worn-out nuts, bolts and bushes of the existing coupling pulley along with tyre. Providing / fitting of gland packing. Greasing work etc. Thereafter coupling with motor, alignment setting, testing of pump on load. Complete job includes the cost of material, labour charges, to and fro carriage charges, hire charges of tools and tackles, out station charges etc. Complete Job
Repair /strengthening of 100HP oil immersed star delta starter of pumping Unit No.II, installed at site of LIS Nud by complete replacement of worn out G.M nuts and washers, copper fingers, contacts,(moving and fixed) as per sample. Drainage of T.oil. Proper cleaning of tanks by removing the deposited carbon and other deposited material. Heating of T.oil to make it completely moisture free. Providing/filling of T.oil 10 ltrs. Approx. Replacement of worn out/burnt copper thimbles of cables by p/f of new thimbles duly crimped and taped. Connecting power supply & testing on load. Complete job includes the cost of material, labour charges and other misc. charges at site. Complete Job
Repair/ Strengthening of Reflux valve (200mm dia) of pumping unit no.1 installed at LIS Nud . The job involves dismantling of the reflux valve by way of cutting of the rusted nuts and bolts with the help of gas cutter, removing of flap. Fabrication of new flap and bush 1 No. as per sample . Dismantling of shaft from both sides of flap and fabrication of new shaft as per the actual size . Fitment of reflux valve and fitting of new nuts, bolts and washer in place of worn out nuts and bolts. Complete job includes the cost of material, labour charges, transportation charges etc. Complete Job
Strengthening of Sluice Valve ( 200 mm dia ) of pumping unit III installed at LIS Nud . The job involves dismantling of sluice valve from its installed position by way of unfastening/cutting of all rusted nut & bolts with the help of gas cutter/suitable tools &tackles and shifting to workshop. Complete dismantling of sluice valve into body and bonnet .Extraction of stem rod with nuts and flap. Fabrication of new stem rod nut as per the size of the old stem rod. Fabrication of new glands as per sample .Making of proper seat for resting of flap. Complete assembling of sluice valve and providing of new gland and rubber packing .Shifting of valves to the site of LIS and reinstallation by P/F of new nut, bolt and washer replacing all worn out nuts/ bolts. Testing and commissioning. Complete job includes the cost of material, labour and transportation charges to and from the LIS.
NACHIKETA TECHNOLOGY
BEE AAR ENTERPRISES
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
NATIONAL ELECTRO-MECH COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .