Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.8 L+₹77,145 (7.72%)Rejected-AOC | ₹10.8 L+₹77,145 (7.72%) | L2 | Rejected-AOC L2 |
| 3 | L3₹10.8 L+₹76,069 (7.61%)Rejected-AOC | ₹10.8 L+₹76,069 (7.61%) | L3 | Rejected-AOC L3 |
| 4 | L4₹10.8 L+₹75,961 (7.60%)Rejected-AOC FATEHPUR | ₹10.8 L+₹75,961 (7.60%) | L4 | Rejected-AOC L4 |
Tender Value
₹10.8 L
EMD Value
₹1.1 L
Closing Date
3 Jul 2026, 3:00 pmClosed
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Construction of khadanja from kuda nistaran to health office for gram samalakha
2026_NNSAH_1162907_1
6263 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹1.1 L
25 Jul 2026
22 Jun 2026
4 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and filling of local sand | 533.66 | cum | 380 | ₹2,02,790.8 |
| 2 | Brick soling with straight over burnt brick laid flat and dry wirh brick eding in all complete work | 1,818 | SQM | 390 | ₹7,09,020 |
| 3 | Add 18%GST | 1 | No | 1,64,127.2 | ₹1,64,127.2 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.82 MB
BOQ_2179899.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .