| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.1 CrAccepted-AOC | ₹4.1 Cr | L-1 | Accepted-AOC Work awarded to Lowest Contractor |
| 2 | L-2₹4.3 Cr+₹15.2 L (3.70%)Rejected-AOC R O NEAR DEGREE COLLEGE ANU HAMIRPUR TEHSIL DISTRICT HAMIRPUR HP C O LINK ROAD TO SUNGRA KANDA KM 0 0 TO 4 555 SH FORMATION CUTTING 5 7 MTR WIDE ROAD C O R WALL B WALL C O UNLINED DRAIN C O CROSS DRAINAGE WORKS PARAPETS P F ROAD SIDE FURNITURE AND DUMPING SITES ETC KM 0 00 TO 4 555 | ₹4.3 Cr+₹15.2 L (3.70%) | L-2 | Rejected-AOC L-2 |
Tender Value
₹4.6 Cr
EMD Value
₹9.1 L
Closing Date
13 Apr 2022, 5:30 pmClosed
Executive Engineer
Executive Engineer, Kalpa Division, HP.PWD. Kalpa
Balance work for the construction of link road to Ribba Kanda km 0/00 to 11/725. (Sub - Head - Formation Cutting, R/wall ,B/wall,X-Drainage Work with slab Culvert, Papapets, Katcha Drain,Sign board, Kilometer stone and Dumping structure etc. in Km.
2022_PWD_59154_2
PW-KNR-E-Tender-22-12553-62 dated 22-03-2022
Open Tender
Civil Works - Roads
Item Rate
360 days
Ribba, Kinnaur HP
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
EE Kalpa Division
₹9.1 L
17 Jan 2023
5 Apr 2022
16 Apr 2022
5 Apr 2022
13 Apr 2022
5 Apr 2022
Amount
Excavation in earthwork in hilly area all heights and depths, in all kind of soils including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification for Rural Roads Clause- 1603.1 and 1603.2 of General conditions for Contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut materials upto all leads and lifts in specified places. in specified manner including arrangement of dumping site trimming, filling of unevenness, blind age and finishing of the road to specified dimensions to the entire satisfaction as directed by the Engineer-in charge for riding. The recover of stones, whether useful or not, for 2189.61 cum ( Two thousand one hundred eighty nine point six one cubic meter) in all cases @ rupees 170/- only (Rupees one hundred sevety) only) per cubic meter shall be effected on pro-rata basis . Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall compensated by him in all cases.
Earth work in excavation for strucutre in all depths as per drawing and technical specifications for rural roads August 2004 (Two Thousand Four) and clause 305.1(Three zero Five point One) including setting out,construction of shoring and bracing removal of stumps and other deleterious materilas and disposal in all lead and lift dreassing of sides and back filling in treanches with excavted suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosin damage to hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited ) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines graces,side slops width camber super elevation and level as shown on the drawing or as directed by the Engneer-in-Charge hauding and stacking of materails useful for construction at suitable sites and safe disposal of unsuitable cut materails in specified manner trimming filling of unevenness blind age and finishing filling of the road to specified dimension or as direted by the Engneer-in-Charge. If the foundation of the structure is in an area stagnant water or is mat with in the excavation dur to spring seepage rain and other causes it shall be remove diversion bailing out or pumping as directed and the area of foundation or embankment shall be kept dry loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his on cost in all case. including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Providing and laying concrete for plain/reinforced concrete in open foundation complete as per drawing and technical specification clause 802, 803, 1202 & 1203.(Eight zero two ,Eight zero three, One two zero two and One two zero three) P.C.C. M-10 (Ten) grade 1:3:6 (one cement: three sands: six graded crushed stone aggregate 40mm( forty millimetre) nominal size including all leads, lifts and carriage of materials complete as per entire satisfaction of the Engineer in charge.
Providing and laying concrete for plain / reinforced concrete in open foundation complete as per drawings and technical specification Clause 802, 803, 1202 & 1203 (Eight zero two Eight zero three, One two zero two and One two zero three) P.C.C. (i) Nominal mix 1:6:12 (One cement : Six sand : Twelve graded stone aggrigate 40 mm(Forty milimetre) nominal size including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Providing and laying reinforced cement concrete M-25 ( twenty five) 1:1.5:3 (one cement :one point five sand : three graded crushed stone aggregate nominal size) mechanically mixed and vibrated in slab bearing plate and wearing course work complete as per drawing and technical specification clause 800,1205,5 including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Supplying fittiing and placing TMT ( thermo mechanically treated bar) reinforcement including binding wire in super structure complete as per drawing technical specification clause 1002,1010 & 1202 and as per direction of Enginner in charge. including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Providing and laying boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:315.33(Three one five point Three Three) and IS:4826(Four Eight two six) in 100 mm (One hundred milimetre)x 100 mm (One hundred milimetre) mesh (woven diagonally) including 10 (Ten) per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg (Twenty five Kilogramme) each as per drawing and technical specifications Clause 1301 (One Three zero One)including all leads,lifts and carriage of materials complete as per entire satisfaction of the Engineer in charge.
Stone masonry work (2nd sort)in foundation complete with cement mortar 1:6 ( one cement :six sand ) in coarses with hard stone of approved quality as per drawing technical specification clause 702,704,1202 and 1204 (seven zero two, seven zero four, one two zero two and one two zero four) including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Stone masonry work (1st Sort) in foundation complete with cement mortar 1:5 ( one cement :five sand ) in coarses with hard stone of approved quality as per drawing technical specification clase 702,704,1202 and 1203 (seven zero two, seven zero four, one two zero two and one two zero three) including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge
Stone masonry work (1st Sort) in super structure complete with cement mortar 1:5 ( one cement :five sand ) in coarses with hard stone of approved quality as per drawing technical specification clase 702,704,1202 and 1203 (seven zero two, seven zero four, one two zero two and one two zero three) including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge
Stone masonry work (1st sort)in super structure complete with cement mortar 1:6 ( one cement :six sand ) in coarses with hard stone of approved quality as per drawing technical specification clause 702,704,1202 and 1204 (seven zero two, seven zero four, one two zero two and one two zero four) including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Providing and laying filter media with granular material backfilling behind abutment, wingwall and returnwall complete as per drawing & technical specification clause.including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Providing and laying rubble stone flooring laid in cement mortar 1:3(One Cement : three sand)over cement concrete bedding complete as per drawings and technical specification clause 1303(One three zero three) including all leads, lifts and carriage of materials complete as per entire satisfaction of the Engineer in charge.
Flush Pointing with cement mortar 1:3(one cement and three sand ) on Square rubble masonry concrete as per drawings and technical specification clause and 1204 as per direction of Enginner in charge. including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge
Providing and laying reinforced cement concrete pipe NP-2 (two) 900 mm dia (Nine hundred millimetre) for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (one cement : two sand) but excluding excavation protection works backfilling concrete and masonry woks in head walls and parapets as per clause 1108(One One zero eight). Including all leads, lifts and carriage of materials complete as per entire satisfaction of the Engineer in charge.
Construction of unlined surface drains of average cross sectional; area 0.4sqm ( zero point four square meter) in ordinary rock to specified lines,grades, levels and dimension as per approved design and technical specification clause 307 ( three hundred seven ) excavated material s to beused in embankment all site .Including all leads, lifts and carriage of materials complete as per entire satisfaction of the Engineer in charge.
Providing and fixing retro refllectorised cautolary mandatory and infomatory sign as per IRC 67 (Indian Road Congress sixty seven) made of encapsulated lens type reflective sheeting vide clause 1701.2.3 (one thousand seven hundred one point two point three) fixed over aluminium sheeting 1.5mm(one point five millimeter) thick supported on G.I. (galvanised iron) pipe 50mm (fifty millimeter) dia. firmly fixed to the ground by and of properly designed foundation with M-15 grade (M-fifteen) cement concrete 450mmX 450mmX 600mm(four hundred fifty into four hundred fifty into six hundred millimeter) below ground level as per drawings and technical specification clause 1701 (one thousand seven hundred two) 600x450mm (six hundred into four hundred fiffty millimeter) rectangular. including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Providing and fixing retro refllectorised cautolary mandatory and infomatory sign as per IRC 67 (Indian Road Congress sixty seven) made of encapsulated lens type reflective sheeting vide clause 1701.2.3 (one thousand seven hundred one point two point three) fixed over aluminium sheeting 1.5mm(one point five millimeter) thick supported on a mild steel angle iron post 75x 75x 6mm (seventy five inot seventy five into six millimeter) firmly fixed to the ground by and of properly designed foundation with M-15 grade (M-fifteen) cement concrete 450mm X450mm X600 mm (four hundred fifty into four hundred fifty into six hundred millimeter) below ground level as per drawings and technical specification clause 801 (eight hundred one) 600mm (six hundred millimeter) equlatoral triangle. including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
Reinforced cement concrete M-15(mixed-fifteen) grade kilometer stone of standard design as per IRC 8(indian Road Congress eight) fixing in position including in painting and printing etcetra as per drawing and technical specification clause 1703(one thousand seven hundered three) including carriage of materials with in all leads,lifts and other incidentals complete as per entire satisfaction of the Engineer-in-charge.
5 km (five killometer) stone
ordinary killometer stone
200 m(two hundred meter) stone (precast)
ARVIND BUILDERS AND CONTRACTORS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .