| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC | ₹20.4 L Quoted ₹17.2 L | L1 | Accepted-AOC Technically and financially eligible L1 Bidder |
| 2 | L2₹19.0 L+₹1.8 L (10.2%)Rejected-Finance JYOTI NAGAR PALI ROAD DIPKA KORBA PIN CODE 495452 | DIPKA | KORBA | CHHATTISGARH | 495452 | ₹19.0 L+₹1.8 L (10.2%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹20.6 L+₹3.4 L (19.5%)Rejected-Finance B 407 C O MR ASHUTOSH JAISWAL ANANT IMAGINE OLD BUS STAND MAIN ROAD KORBA PIN CODE 495677 | KORBA | CHHATTISGARH | 495677 | ₹20.6 L+₹3.4 L (19.5%) | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹20.8 L+₹3.6 L (20.9%)Rejected-Finance BEHIND OF PAWAN TALKIES ROAD KORBA CG 495678 | 495678 | ₹20.8 L+₹3.6 L (20.9%) | L4 | Rejected-Finance Not L1 Bidder |
| 5 | L5₹20.9 L+₹3.6 L (21.1%)Rejected-Finance KORBA | KORBA | CHHATTISGARH | 495119 | ₹20.9 L+₹3.6 L (21.1%) | L5 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | M/S DEEPAK KUMAR DIXENA L6 | SATPAL SHARMA L4 | Shri hari engineering group L1 | M/s. MAA VAISHNAVI CONSTRUCTIONS L3 | S.B Construction L5 | M/S ALLIED ENGINEERING SERVICES L7 | Mishra Traders L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Civil Works | ||||||||||
| 1.01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. In cement mortar | 0.52 | cum | 2 ₹1.04 Lowest | 821.8 ₹425.28 | 679.84 ₹351.82 | 812.3 ₹420.37 | 1,000 ₹517.5 | 1,000 ₹517.5 | 700 ₹362.25 |
| 1.02 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,767.5 | kg | 75 ₹2,07,562.5 | 67.93 ₹1,87,996.5 | 56.2 ₹1,55,519.66 Lowest | 67.14 ₹1,85,809.95 | 70 ₹1,93,725 | 100 ₹2,76,750 | 70 ₹1,93,725 |
| 1.03 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge : External work 15 mm nominal outer dia. Pipes. | 750 | m | 100 ₹75,000 | 121.1 ₹90,822.78 | 100.18 ₹75,135 | 119.69 ₹89,767.5 | 160 ₹1,20,000 | 100 ₹75,000 | 90 ₹67,500 Lowest |
| 1.04 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge : External work 20 mm nominal outer dia. Pipes. | 500 | m | 110 ₹55,000 | 140.66 ₹70,330.32 | 116.36 ₹58,180 | 139.03 ₹69,515 | 100 ₹50,000 Lowest | 150 ₹75,000 | 110 ₹55,000 |
| 1.05 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge : External work 25 mm nominal outer dia. Pipes. | 250 | m | 150 ₹37,500 | 177.85 ₹44,461.98 | 147.12 ₹36,781 | 175.79 ₹43,947.5 | 100 ₹25,000 Lowest | 200 ₹50,000 | 130 ₹32,500 |
| 1.06 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 101.5 | Cum | 110 ₹11,165 | 123.2 ₹12,504.94 | 101.92 ₹10,344.88 | 121.77 ₹12,359.65 | 100 ₹10,150 | 150 ₹15,225 | 90 ₹9,135 Lowest |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 10.8 | Cum | 2,800 ₹30,254 | 3,100.22 ₹33,497.9 | 2,564.66 ₹27,711.15 Lowest | 3,064.39 ₹33,110.73 | 3,500 ₹37,817.5 | 4,000 ₹43,220 | 3,000 ₹32,415 |
| 1.08 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8 | Cum | 4,000 ₹32,000 | 4,341.61 ₹34,732.85 | 3,591.6 ₹28,732.8 | 4,291.43 ₹34,331.44 | 3,500 ₹28,000 Lowest | 4,500 ₹36,000 | 3,500 ₹28,000 Lowest |
| 1.09 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources) | 20.5 | Cum | 4,100 ₹84,050 | 5,075.19 ₹1,04,041.44 | 4,198.46 ₹86,068.43 | 5,016.53 ₹1,02,838.86 | 3,500 ₹71,750 Lowest | 5,000 ₹1,02,500 | 4,000 ₹82,000 |
Tender Value
₹37.4 L
EMD Value
₹46,800
Closing Date
22 May 2026, 5:00 pmClosed
Staff Officer SECL Korba
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Providing platforms, temporary sheds and pipeline for earth pits at different locations of Saraipali OCM, Korba Area
2026_SECL_359409_1
SECL/GM/KA/C/e-Tender/26-27/17 Dt. 09.05.2026
Open Tender
Civil Works - Others
Item Rate
120 days
Office of General Manager SECL Korba Area 495677
As Per NIT
3 documents required · 3 mandatory
₹46,800
12 Aug 2026
11 May 2026
25 May 2026
12 May 2026
22 May 2026
12 May 2026
12 May 2026 - 15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. In cement mortar | 0.52 | cum | 1,249.7 | ₹646.72 |
| 1.02 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,767.5 | kg | 103.3 | ₹2,85,882.75 |
| 1.03 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge : External work 15 mm nominal outer dia. Pipes. | 750 | m | 184.15 | ₹1,38,112.5 |
| 1.04 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge : External work 20 mm nominal outer dia. Pipes. | 500 | m | 213.9 | ₹1,06,950 |
| 1.05 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge : External work 25 mm nominal outer dia. Pipes. | 250 | m | 270.45 | ₹67,612.5 |
| 1.06 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 101.5 | Cum | 187.35 | ₹19,016.02 |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 10.81 | Cum | 4,714.45 | ₹50,939.63 |
| 1.08 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 8 | Cum | 6,602.2 | ₹52,817.6 |
| 1.09 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources) | 20.5 | Cum | 7,717.75 | ₹1,58,213.88 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_372275.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 1.48 MB
Tendernotice_3.pdf
PDF • 0.07 MB
BOQ_372275.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .