| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Finance | -13.65% | ₹6.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.4 L+₹65,892.23 (9.73%)Admitted-Finance | -5.25% | ₹7.4 L+₹65,892.23 (9.73%) | L2 | Admitted-Finance |
Tender Value
₹7.8 L
EMD Value
₹15,680
Closing Date
14 May 2026, 6:00 pmClosed
ADPC OFFICE SAMAGRA SHIKSHA SRIGANGANAGAR
ADPC OFFICE SAMAGRA SHIKSHA SRIGANGANAGAR
Construction of 1 Class Room with Ver. Under DMFT Scheme in Mahatma Gandhi Government School, Baheti Gajsinghpur Block Padampur
2026_RCSCE_556484_6
NIT 01/2026-27 SRIGANGANAGAR
Open Tender
Civil Works
Percentage
180 days
Mahatma Gandhi Government School, Baheti Padampur
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
ADPC SAMAGRA SHIKSHA/MD RISL
₹15,680
22 May 2026
8 May 2026
15 May 2026
8 May 2026
14 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A CIVIL WORK | |||||
| 1.01 | RB 2A नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना इकाई : घन मीटर साधारण /मुलायम मिट्टी में इकाई : घन मीटर | 32.51 | Cum. | 143.92 | ₹4,678.16 |
| 1.02 | RB 10A सीमेन्ट कांक्रिट नींव या फर्श में 40 मि.मी. नामीय माप की पत्थर गिट्टी(crusher broken)/ईट मिटटी , सीमेन्ट- रेत मसाला में 1 सिमेन्ट : 4 रेत : 8 गिट्टी अनुपात में डालना तथा कुटाई करना , तराई समेत । इकाई : घन मीटर पत्थर की गिट्टी (crusher broken) के साथ इकाई : घन मीटर | 11.72 | Cum. | 3,840.36 | ₹45,025.72 |
| 1.03 | RB 20A नींव तथा कुर्सी प्रथम श्रेणी ईंट की चिनाई सीमेन्ट -बजरी 1:6 या 1:8 मसाले में, मय बगल की झिरी बन्द करने तथा तराई सहित। इकाई : घन मीटर सीमेन्ट मसाला 1:6 इकाई : घन मीटर | 28.56 | Cum. | 3,933.21 | ₹1,12,339.72 |
| 1.04 | B-4/4.1 Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 2 | Cum. | 4,934 | ₹9,887.01 |
| 1.05 | B-1/1.25+H-1/1.3 .1 Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. Supply & Stacking good earth at site complete including loading unloading & transporation etc. Good soil of Earth | 26.44 | Cum. | 304 | ₹8,037.88 |
| 1.06 | RB 20 A + 22 नींव तथा कुर्सी प्रथम श्रेणी ईंट की चिनाई सीमेन्ट -बजरी 1:6 या 1:8 मसाले में, मय बगल की झिरी बन्द करने तथा तराई सहित। इकाई : घन मीटर सीमेन्ट मसाला 1:6 इकाई : घन मीटर अतिरिक्त राशि अधिरचना में चिनाई कार्य में 4.5 मीटर ऊंचाई तक कुर्सी स्तर से। इकाई : घन मीटर | 22.31 | Cum. | 4,147.58 | ₹92,533.96 |
| 1.07 | B-4/4.3 Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.
M20 grade Nominal Mix / Design Mix | 11.58 | cum. | 5,185 | ₹60,026.04 |
| 1.08 | RB 61 आर.सी.सी. काम के लिए लोहे को काटना, मोड़ना तथा स्थान पर लगाना तथा बांधने का कार्य मय आपूर्ति के । इकाई : किलोग्राम | 1,358.07 | Kg. | 85.37 | ₹1,15,938.57 |
| 1.09 | B-61/4.9 Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 17.32 | sqm. | 157 | ₹2,719.08 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
Tendernotice_2.pdf
PDF • 4.88 MB
BOQ_990849.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .