Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹44.8 LAccepted-AOC VILLAGE GUNNIA GURDASPUR DISTRICT PUNJAB | GURDASPUR | PUNJAB | 143505 | ₹44.8 L | 1 | Accepted-AOC Higher Bid |
| 2 | 2₹47.1 L+₹2.3 L (5.16%)Rejected-AOC VILL KHAD BATHLAUR POST OFFICE TIBBA TAPRIAN DISTT RUPNAGAR | RUPNAGAR | PUNJAB | 140001 | ₹47.1 L+₹2.3 L (5.16%) | 2 | Rejected-AOC Lower Bid |
| 3 | 3₹47.7 L+₹3.0 L (6.60%)Rejected-AOC LUDHIANA | LUDHIANA | PUNJAB | 141001 | ₹47.7 L+₹3.0 L (6.60%) | 3 | Rejected-AOC Lower Bid |
Tender Value
₹48.2 L
EMD Value
₹96,414
Closing Date
18 May 2026, 11:00 amClosed
DSCO SBS Nagar
Opposite New Lakkar Mandi Village Garhi Kanhgoo
Construction of Stone Masonry water recharging cum silt detention structure in village Malewal and Crate wire structures in villages Malewal Bhanewal Bagowal and Bhaddi tehsil Balachaur District Shaheed Bhagat Singh Nagar
2026_DOA_167958_1
DSWC/SBS/2026-2027/01
Open Tender
Civil Works
Lump-sum
Balachaur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹96,414
23 Jul 2026
8 May 2026
18 May 2026
8 May 2026
18 May 2026
8 May 2026
FINANCIAL BID NO.: DSWC/SBS/2026-27/01
Construction Stone masonary water recharging cum silt detention structure in village Malewal and crate wire structures in village Malewal, Bhanewal, Bagowal and Bhaddi Tehsil Balachaur , Distt. Shaheed Bhagat Singh Nagar, Punjab
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
WORK – 1(a) Stone Masonry Water Recharging Cum silt detention structure in village Malewal, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 88.83 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise only
2 C:C 1:8:16 in foundation 14.22 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 103.32 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 63.37 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 4.26 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 114.02 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 60.83 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
8 Carriage of bajri 3.83 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
9 Carriage of gatka 14.22 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
10 Carriage of boulder 183.25 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
WORK – 1(b) Stone Masonry Water Recharging Cum silt detention structure in village Malewal, Tehsil Balachaur,Distt SBS Nagar.
S.No. Particulars Qty Unit Rate Amount
1 Earthwork excavation in foundation 93.93 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise only
2 C:C 1:8:16 in foundation 15.06 cum 3433.36 Three Thousand Four Hundred Thirty Three Rupees And Thirty Six Paise only
3 Square rubble masonry 1:5 in foundation 110.12 cum 5602.51 Five Thousand Six Hundred Two Rupees And Fifty One Paise only
4 Square rubble masonry 1:5 APL 66.25 cum 6089.23 Six Thousand Eighty Nine Rupees And Twenty Three Paise
5 C:C 1:2:4 4.45 cum 5058.91 Five Thousand Fifty Eight Rupees And Ninety One Paise
6 12.5 mm thick cement plaster 1:4 119.93 cum 213.54 Two Hundred Thirteen Rupees And Fifty Four Paise
7 Carriage of sand 64.362 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
8 Carriage of bajri 4.01 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
9 Carriage of gatka 15.06 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
10 Carriage of boulder 194.007 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
Work 1(c): Crate wire structures at village Malewal, Tehsil Balachaur, Distt SBS Nagar.( 1 no )
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 24 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 207.2 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 207.2 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 60.4 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 60.4 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
Say Total ( c )
Work 1 (d) : Crate wire structures at village Malewal, Tehsil Balachaur, Distt SBS Nagar.( 2 no )
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 20 cum 38.98 Thirty Eight Rupees And Ninety Seven Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 86 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 86 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 20 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 20 cum 267.65 Two Hundred Sixty Seven Rupees And Sixty Five Paise
Sub-Total( 1 )(a+b+c+d)
Work 2(a) : Crate wire structures no 1 & 2 at village Bhanewal, Tehsil Balachaur, Distt SBS Nagar.( 2 no )
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 26 cum 38.97 Thirty Eight Rupees And Ninety Eight Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 163.5 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 163.5 sqm 73.74 Seventy Three Rupees And Seventy Four Paise
4 Filling of stones into crates and hand packing 46 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 46 cum 272.07 Two Hundred Seventy Two Rupees And Seven Paise
Total Amount Crate wire structure 1 & 2
Work2(b) : Crate wire structures no 3, 4, & 5 at village Bhanewal, Tehsil Balachaur, Distt SBS Nagar.( 3 no )
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 30 cum 38.97 Thirty Eight Rupees And Ninety Seven Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 217.37 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 217.37 sqm 73.74 Seventy Three Rupees And Seventy Four Paise
4 Filling of stones into crates and hand packing 61.5 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 61.5 cum 272.07 Two Hundred Seventy Two Rupees And Seven Paise
Total Amount Crate wire structure 3, 4& 5
Work 3 : Crate wire structures no 1, 2, 3 & 4 at village Bagowal, Tehsil Balachaur, Distt SBS Nagar.( 4 no )
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 151.38 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 1167.52 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 1167.52 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 314.14 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 314.14 cum 289.74 Two Hundred Eighty Nine Rupees And Seventy Four Paise
Work 4 : Crate wire structures no 1, 2 & 3 at village Bhaddi, Tehsil Balachaur, Distt SBS Nagar.( 3 no )
S. No Particulars Qty Unit Rate Amount
1 E/w in Excavation of foundation 37.5 cum 38.98 Thirty Eight Rupees And Ninety Eight Paise
2 Weaving of wire neting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm mesh 276.85 sqm 197 One Hundred Ninety Seven Rupees
3 Spreading of wire crates over pitching connecting with side protective walls inclusive of wire etc. 276.85 sqm 73.75 Seventy Three Rupees And Seventy Five Paise
4 Filling of stones into crates and hand packing 80.63 cum 1458.04 One Thousand Four Hundred Fifty Eight Rupees And Four Paise
5 Carriage of Boulder after first 5 km from quarry to site. 80.63 cum 280.91 Two Hundred Eighty Rupees And Ninety one Paise
Total Amount Crate wire structure 1,2 & 3
Total (1+2+3+4)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DNIT01.pdf
Tender Documents • 0.51 MB
Financial_Bid01.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .