| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | ₹8.5 L | L1 | Accepted-Finance L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | K.RAMESH BABU L3 | E.BHARATHKUMAR L5 | S D CONSTRUCTION L2 | Bharathi Raja L1 | Amma Systems L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavating and deposition on bank with intial lead and lift all clauses of soil such as hard stiff clay soil ,stiff black cotton soil small size boulders and hard gravel soil as per SS 20 B for foundation etc. | 12.39 | Cum | 260 ₹3,221.4 | 251 ₹3,109.89 | 210 ₹2,601.9 Lowest | 240 ₹2,973.6 | 520 ₹6,442.8 |
| 2.00 | Sand filling with M sand including all cost and conveyance of all labour charges etc., Complete. | 4.35 | Cum | 1,600 ₹6,960 | 1,651 ₹7,181.85 | 1,200 ₹5,220 Lowest | 1,500 ₹6,525 | 2,150 ₹9,352.5 |
| 3.00 | Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 14.52 | Cum | 5,200 ₹75,504 | 5,079 ₹73,747.08 | 3,950 ₹57,354 Lowest | 4,500 ₹65,340 | 7,000 ₹1,01,640 |
| 4.00 | Cement concrete in 1:2:4 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 12.17 | Cum | 5,800 ₹70,586 | 6,083 ₹74,030.11 | 4,501 ₹54,777.17 Lowest | 5,800 ₹70,586 | 7,000 ₹85,190 |
| 5.00 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete., | 12.18 | Cum | 8,000 ₹97,403.76 | 8,617 ₹1,04,916.02 | 6,150 ₹74,879.14 Lowest | 8,100 ₹98,621.31 | 6,400 ₹77,923.01 |
| 6.00 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | 22.42 | Sqm | 500 ₹11,210 | 520 ₹11,658.4 | 505 ₹11,322.1 | 450 ₹10,089 Lowest | 740 ₹16,590.8 |
| 7.00 | Above GL | 79.53 | Sqm | 950 ₹75,553.5 | 1,041 ₹82,790.73 | 905 ₹71,974.65 | 850 ₹67,600.5 | 700 ₹55,671 Lowest |
| 8.00 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 1.42 | MT | 78,000 ₹1,10,760 | 87,311 ₹1,23,981.62 | 81,500 ₹1,15,730 | 75,000 ₹1,06,500 Lowest | 82,000 ₹1,16,440 |
| 9.00 | Brick work in CM 1:5 mix using country bricks size of 9'' X 43/8'' x 23/4" including all cost and conveyance of labour charges etc.,Complte. | 3.6 | Cum | 5,800 ₹20,880 | 5,799 ₹20,876.4 | 6,005 ₹21,618 | 5,500 ₹19,800 | 1,350 ₹4,860 Lowest |
| 10.00 | Above Basement | 8.13 | Cum | 5,900 ₹47,967 | 5,798 ₹47,137.74 | 6,255 ₹50,853.15 | 5,600 ₹45,528 | 1,350 ₹10,975.5 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
22 Jul 2026, 3:00 pmClosed
BDO VP
BDO KTR
Construction of Waiting Shed to Mannivakkam KK Thangal at Mannivakkam Panchayat in Kattankolathur Panchayat Union
2026_RDTN_684439_1
3/2026/A5 dt 07.07.2026
Open Tender
Civil Works
Item Rate
90 days
BDO KTR
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹10,000
Yes
19 Aug 2026
8 Jul 2026
22 Jul 2026
8 Jul 2026
22 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavating and deposition on bank with intial lead and lift all clauses of soil such as hard stiff clay soil ,stiff black cotton soil small size boulders and hard gravel soil as per SS 20 B for foundation etc. | 12.39 | Cum | - | - |
| 2 | Sand filling with M sand including all cost and conveyance of all labour charges etc., Complete. | 4.35 | Cum | - | - |
| 3 | Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 14.52 | Cum | - | - |
| 4 | Cement concrete in 1:2:4 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 12.17 | Cum | - | - |
| 5 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete., | 12.18 | Cum | - | - |
| 6 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | 22.42 | Sqm | - | - |
| 7 | Above GL | 79.53 | Sqm | - | - |
| 8 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 1.42 | MT | - | - |
| 9 | Brick work in CM 1:5 mix using country bricks size of 9'' X 43/8'' x 23/4" including all cost and conveyance of labour charges etc.,Complte. | 3.6 | Cum | - | - |
| 10 | Above Basement | 8.13 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_822755.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_822755.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .