Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹27.3 LAccepted-Finance VILLAGE PUJJE P O NICHAR TEHSIL NICHAR DISTT KINNAUR | NICHAR | KINNAUR | HIMACHAL PRADESH | ₹27.3 L | 1st | Accepted-Finance lowest |
| 2 | 2nd₹28.5 LRejected-Finance VILLAGE P O CHAURA TEHSIL NICHAR DISTRICT KINNAUR H P | ₹28.5 L | 2nd | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | VIMAL GOVT. CONTRACTOR L1 | SURENDER SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth upto a lead of 20 metres:- P/J Work within all leads and lifts. | 6.78 | cum | 400 ₹2,712 | 410 ₹2,779.80 |
| 2.00 | Excavation in foundations,trenches etc. in earth work, lift upto 1.50 mtr stacking the excavated soil not more than 3.00 mtr clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required into plinth sides of foundation consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with a lead of 20 mtrs. (100% Pick Work) | 13.39 | cum | 600 ₹8,034 | 605 ₹8,100.95 |
| 3.00 | Providing and laying cement concrete 1:5:10 (1 cement :5 sand:10graded stone aggregate 40mm nominal size) curing complete excluding cost of form work in retaining walls/Breast walls | 25.92 | um | 9,000 ₹2.3 L | 9,500 ₹2.5 L |
| 4.00Providing and laying cement concrete 1:3:6 (1 cment:3 sand: 6 graded stone agg. 20mm Nominal size) and curring complete excluding the cost of form work in. | |||||
| 4.01 | foundation & plinth | 2.93 | cum | 10,500 ₹30,765 | 11,000 ₹32,230 |
| 5.00Providing and laying cement concrete 1:1.5:3 (1cement :1.5 sand :3 graded stone aggregate 20mm. nominal size) and curing complete excluding cost of form work and reinforcement for feinforced concrete work in: | |||||
| 5.01 | Column, Pillars, Posts and struts upto floor two level. | 9.81 | cum | 16,000 ₹1.6 L | 16,500 ₹1.6 L |
| 5.02 | Foundation footings bases of columns and the like and mass concrete with in all leads and lifts as per direction of Engineer in charge. | 28.8 | cum | 15,000 ₹4.3 L | 15,500 ₹4.5 L |
| 6.00 | Providing tor steel reinforce cement for RCC work including bending binding and placing in position complete upto floor two level. | 686.7 | kg | 115 ₹78,970.50 | 115 ₹78,970.50 |
| 7.00Steel work welded in built up sections,trusses and framed work,including cutting ,hoisting ,fixing in position and applying a priming coat of red lead paint. | |||||
Tender Value
₹22.6 L
EMD Value
₹45,221
Closing Date
2 Dec 2025, 5:00 pmClosed
Executive Engineer
Division reckong peo
CO Truss bridge for crossing 125mm dia GI Pipeline at RD 300 to 318, CO PCC RWall at RD 820 to 825,CO PCC RWall at RD 1068 to 1075,CO PCC Pipe supporting wall at RD 3611 to 3618 near culvert,Installation of 25mm dia Cement grouted anchor bar to
2025_HPIPH_121731_1
KNR-JSD-Peo-EA-I-Tender
Open Tender
Civil Works
180 days
GP Nichar
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹45,221
Yes
5 Jan 2026
25 Nov 2025
3 Dec 2025
26 Nov 2025
2 Dec 2025
26 Nov 2025
Amount
Cutting in earth work and disposal of excavated earth upto a lead of 20 metres:- P/J Work within all leads and lifts.
Excavation in foundations,trenches etc. in earth work, lift upto 1.50 mtr stacking the excavated soil not more than 3.00 mtr clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required into plinth sides of foundation consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with a lead of 20 mtrs. (100% Pick Work)
Providing and laying cement concrete 1:5:10 (1 cement :5 sand:10graded stone aggregate 40mm nominal size) curing complete excluding cost of form work in retaining walls/Breast walls
Providing and laying cement concrete 1:3:6 (1 cment:3 sand: 6 graded stone agg. 20mm Nominal size) and curring complete excluding the cost of form work in.
foundation & plinth
Providing and laying cement concrete 1:1.5:3 (1cement :1.5 sand :3 graded stone aggregate 20mm. nominal size) and curing complete excluding cost of form work and reinforcement for feinforced concrete work in:
Column, Pillars, Posts and struts upto floor two level.
Foundation footings bases of columns and the like and mass concrete with in all leads and lifts as per direction of Engineer in charge.
Providing tor steel reinforce cement for RCC work including bending binding and placing in position complete upto floor two level.
Steel work welded in built up sections,trusses and framed work,including cutting ,hoisting ,fixing in position and applying a priming coat of red lead paint.
In beams joists, channels, angles, tees, flats with connection plates or angle cleats as in main and cross beams hip and jack rafters purlins connected to common rafters and the like.
Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in:
Vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster buttresses, plinth and string courses and the like with in all leads and lifts.
Providing and Fixing of Cement grouted 25mm dia. Anchor bar.1.Om length (0.5m in rock):-
Cutting in earth work and disposal of excavated earth upto a lead of 20 metres:-(Pick Work and Jump work 100% )
Providing mild/tor steel reinforce cement for reinforce concrete work including bending binding and placing in position complete upto floor two level including within all leads and lifts as per direction of Engineer-in-Charge.
In Anchor blocks, Thrust block @ 70Kg/Cum
SURENDER SINGH (BID ID -589625)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.10 MB
Document
0.19 MB
Document
0.56 MB
Document
0.07 MB
BOQ
BOQ • 0.34 MB
Download all tender documents and submit your bid