Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-AOC Q NO A 29 POWER CITY JAMNIPALI KORBA CG 495450 | JAMNIPALI | KORBA | CHHATTISGARH | 495450 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹23.6 L+₹3.9 L (20.1%)Rejected-Finance BANKI MONGRA KORBA CHHATTISGARH | KORBA | KORBA | CHHATTISGARH | 495677 | L2 | Rejected-Finance Not L1 Bidder | |
| 3 | L3₹25.3 L+₹5.7 L (28.9%)Rejected-Finance HOUSE NO A 31 POWER CITY JAMNIPALI KORBA CHHATTISGARH | JAMNIPALI | KORBA | CHHATTISGARH | 495450 | L3 | Rejected-Finance Not L1 Bidder |
Tender Value
₹39.1 L
EMD Value
₹48,900
Closing Date
19 Mar 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 25 nos. sectionalisation stoppings in 9D panel, S-6, S-8 and S-9 panel in G-II A seam of Bagdewa UG Mine.
2024_SECL_304090_1
SECL/KB/GM/SO(M)/eNIT/23-24/26
Open Tender
Civil Works - Buildings
Item Rate
300 days
Korba
As per NIT
3 documents required · 3 mandatory
₹48,900
15 Apr 2024
7 Mar 2024
20 Mar 2024
7 Mar 2024
19 Mar 2024
9 Mar 2024
7 Mar 2024 - 12 Mar 2024
Amount
Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Loading of material (Cement) into tub on surface within a lead of 50m.
Loading of material (Sand) into tub on surface within a lead of 50m.
Loading of material (stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m.
Loading of material (Steel) into tub on surface within a lead of 50m.
Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Stone aggregate below 40mm nominal size) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Steel) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Manual pushing of Cement tubs in underground for every 30m. or part thereof in excess of first 30m. (900m i.e. 30 lead)
Manual pushing of Sand tubs in underground for every 30m. or part thereof in excess of first 30m. (900m i.e. 30 lead)
Manual pushing of Stone Chips tubs in underground for every 30m. or part thereof in excess of first 30m. (900m i.e. 30 lead)
Manual pushing of Steel tubs in underground for every 30m. or part thereof in excess of first 30m. (900m i.e. 30 lead)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). DSR Item no. 5.2.2
12 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand). DSR Item no. 13.4.2
Neat cement punning
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Satna lime wash on walls with one coat
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level for Cold twisted bars
Total impact of GST for the purpose of CTC
PAWAN KUMAR
Vijay Chandra Jha
techsummary_315019.pdf
PDF • 0.48 MB
finsummary_315019.pdf
PDF • 0.48 MB
LOA.PDF
PDF • 0.84 MB
finance_315019.pdf
PDF • 0.72 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .