| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹39.2 L (21.5%)Admitted-Finance | ₹2.2 Cr+₹39.2 L (21.5%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹47.5 L (26.0%)Admitted-Finance | ₹2.3 Cr+₹47.5 L (26.0%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical NA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MOHD AKRAM CONTRACTOR L1 | MANIER HUSSAIN L2 | GHULAM NABI MIR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) over area (Exceeding 30 cm in depth 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 m and lift up to 1.50 m disposed earth to be levelled and neatly dressed.
(Road /X-Drainage Cutting)
A.K.S O.R H.R(Required
Blasting )
50% 30% 20% | 37,600 | Cum | - | - | - |
| 2.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( Not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits and the like not exceeding 10sqm on plan, depth upto1.5 mtr including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in | 754 | Cum | - | - | - |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering.
1:5:10 (1 cement :5 coarse sand :10 graded stone crushed aggregate 40 mm nominal size). including all leads /lifts , carriage , handling and re-handaling ( Complete job) | 70 | Cum | - | - | - |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering
1:3:6 with ( 1 cement :3coarse sand :6 graded crushed stone aggregate 20 mm nominal size) using 20% stones). including all leads /lifts , carriage , handling and re-handaling
( Complete job) | 485 | Cum | - | - | - |
| 5.00 | Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns , piers ,abutments,pillars, posts, struts, butteresses , string or laces , courses , parapets ,coping ,bed blocks, anchor blocks , plain window sills ,sunken,floors , fillets etc. upto floor five level , excluding the cost of centring, shuttering and finishing.1:3:6 ( 1 cement :3 coarse sand :6 graded crushed stone aggregate 20 mm nominal size) using 20% stones. including all leads /lifts , carriage , handling and re-handaling ( Complete job) | 220 | Cum | - | - | - |
| 6.00 | Dry random rubble masonry with hard stone in foundation and plinth. Using nallah stone with bond stone. including all leads /lifts , carriage , handling and re-handaling ( Complete job) | 418 | Cum | - | - | - |
| 7.00 | Stone filling including cost of stones. In horizontal on level .including all leads /lifts , carriage , handling and re-handaling ( Complete job) | 221 | Cum | - | - | - |
| 8.00 | Reinforced cement concrete work in walls (any thickness) including attached pilasters , buttresses , plinth and string courses , fillets , columns , pillars piers , abutments , posts ans struts etc upto floor five level excluding cost of centring , shuttering , finishing and reinforcement
1:2:4 (1 cement :2 coarse sand : 4 graded crushed stone aggregate 20 mm nominal size.including all leads /lifts , carriage , handling and re-handaling ( Complete job) | 3 | Cum | - | - | - |
| 9.00 | Providing and laying Reinforcement cement concrete 1:1:5:3 (1 cement 1:5 coarse sand :3 graded stone aggregate 20 mm nominal size) in suspended floors balconies landings and stair case having up to 15 degree slope excluding cost of centring and shuttering all work up to floor V level..including all leads /lifts , carriage , handling and re-handaling ( Complete job) | 23 | Cum | - | - | - |
| 10.00 | Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all completed thermo treated mechanical bars | 266 | Kg | - | - | - |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
16 Mar 2020, 4:00 pmClosed
Executive Engineer PWD Division Poonch
Executive Engineer PWD Division Poonch
Construction of link road from Munday Bandi Morh to Kirni via centre Qasba ,Mandi Km 1st RD 0 to Km 2nd Rd 1000 Length 2.00 Kms by way of Earth Work in cutting,Walling, X-Drainage, 150mm thick WBM Gr-II,Grade III ,25mm thick OGPC Under NABARD lo
2020_PWDJK_94551_1
NIT No- 55 of 2019-20 Dated- 05-03-2020
Open Tender
Civil Works
Item Rate
540 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Yes
Superintending Engineer PWD Circle Rajouri
₹4.3 L
Yes
18 May 2020
6 Mar 2020
17 Mar 2020
6 Mar 2020
16 Mar 2020
6 Mar 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over area (Exceeding 30 cm in depth 1.5 mtr in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 m and lift up to 1.50 m disposed earth to be levelled and neatly dressed. (Road /X-Drainage Cutting) A.K.S O.R H.R(Required Blasting ) 50% 30% 20%
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( Not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits and the like not exceeding 10sqm on plan, depth upto1.5 mtr including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. 1:5:10 (1 cement :5 coarse sand :10 graded stone crushed aggregate 40 mm nominal size). including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering 1:3:6 with ( 1 cement :3coarse sand :6 graded crushed stone aggregate 20 mm nominal size) using 20% stones). including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns , piers ,abutments,pillars, posts, struts, butteresses , string or laces , courses , parapets ,coping ,bed blocks, anchor blocks , plain window sills ,sunken,floors , fillets etc. upto floor five level , excluding the cost of centring, shuttering and finishing.1:3:6 ( 1 cement :3 coarse sand :6 graded crushed stone aggregate 20 mm nominal size) using 20% stones. including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Dry random rubble masonry with hard stone in foundation and plinth. Using nallah stone with bond stone. including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Stone filling including cost of stones. In horizontal on level .including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Reinforced cement concrete work in walls (any thickness) including attached pilasters , buttresses , plinth and string courses , fillets , columns , pillars piers , abutments , posts ans struts etc upto floor five level excluding cost of centring , shuttering , finishing and reinforcement 1:2:4 (1 cement :2 coarse sand : 4 graded crushed stone aggregate 20 mm nominal size.including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Providing and laying Reinforcement cement concrete 1:1:5:3 (1 cement 1:5 coarse sand :3 graded stone aggregate 20 mm nominal size) in suspended floors balconies landings and stair case having up to 15 degree slope excluding cost of centring and shuttering all work up to floor V level..including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all completed thermo treated mechanical bars
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement: 2coarse sand:4graded stone aggregate 20mm nominal size ).including all leads /lifts , carriage , handling and re-handaling ( Complete job)
Centring and shuttering including strutting propping etc. and removal of form for :-
Foundations, footings, bases of columns etc for mass concrete
Walls ( any thickness ) including attached pilasters , butteresses , plinth and string course
Suspended floors, roofs, landings, balconies and access platforms.
Edges of slabs and breaks in floors and walls under 20cm wide
Filling available excavated earth (excluding rock) in trenches plinth, sides of foundation etc. Layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming and watering lead up to 50 m and lift upto 1.5 M(Behind R-Walls,Culverts,Abutments,Wing Wall,Cushion Over Hume Pipes).
Hand packed stones in zinc coated gabions mechanically woven double twisted hexagonal in shape having wire mesh size of 100x120mm and wire dia 2.70 mm selvedge wire dia 3.4 mm & lacing wire dia 202 mm crates including supply of stones , cost of zinc coated gabions crates and all leads/lifts , carriages , handling and re-handling ( Complete job)
Providing and laying non-pressure NP2 class ( light duty) 900 mm dia R.C.C H.P with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement :2 fine sand ) including testing of joints ,Cost of pipes etc complete ( Recovery rate of 8'-0" length pipe @ Rs.13500+ Taxes ) supplied by the department
Providing and laying WBM-GR- II 150 mm thick with broken Nallah/Crusher stone aggregate of 63 to 45mm size including screening of 13.2 mm size and using good earth as binding material sorting, spreading to template and consolidation with Power Road Roller of 8-10 Tonne capacity including carriages, octroi, sale tax, service tax all lead and lift for complete job.
Providing and laying WBM-GR- III with broken Nallah /Crusher stone aggregate of 53 to 22.4mm size including screening of 11.2 mm size and usingcrusher dust as binding material sorting, spreading to template and consolidation with Power Road Roller of 8-10 Tonne capacity including carriages, octroi, sale tax, service tax all lead and lift for complete job .
Providing, laying and rolling of 25 mm thick OGPC with hot mix plant Composed of 13.2 mm to 5.6 mm aggregates using bitumen of grade VG- 10 to required line, grade and level to serve as wearing course including cleaning the previously prepared base, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat conforming to Technical Specification Clause 508.Complete in all respect including tack coat (Recovery rate of Bitumen @ Rs 45 per KG+ Taxes if supplied by the department .)
MANIER HUSSAIN
GHULAM NABI MIR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_178438.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .