| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹1.7 L Quoted ₹1.0 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹1.1 L+₹6,767.05 (6.67%)Rejected-AOC H NO FLOOR 0 SECTOR WARD 0 CITY VILLAGE PRATAP NAGAR DISTRICT YAMUNANAGAR LANDMARK VILLAGE BOMBEYPUR STATE HARYANA | YAMUNANAGAR | HARYANA | 133103 | ₹1.1 L+₹6,767.05 (6.67%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹1.6 L+₹57,672.16 (56.8%)Rejected-AOC SHOP NO 4 NIRMAL VIHAR SECTOR 7 KARNAL HARYANA 132001 | KARNAL | KARNAL | HARYANA | 132001 | ₹1.6 L+₹57,672.16 (56.8%) | L3 | Rejected-AOC 3rd Lowest |
| 4 | L4₹1.7 L+₹67,653.56 (66.6%)Rejected-AOC HARYANA HR | KARNAL | HARYANA | 132001 | ₹1.7 L+₹67,653.56 (66.6%) | L4 | Rejected-AOC 4th Lowest |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
17 Aug 2026, 11:00 amClosed
YOGESHWAR
HSVP DIV 1 Sec 8 Panchkula
Providing and Laying of 200mm HDPE Pipe Hiring of JCB etc. complete in all respect and all other works contingent thereto
2026_HBC_539895_1
20264C346F28 5249 4F02 A4B8 49A236F21995269HSV
Open Tender
Civil Works
Works
30 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
₹3,380
Yes
25 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
10 Aug 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 4.12.1:- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in- charge. 1. All kinds of soil [Through Rate] | 32.86 | P. Cum. | 78 | ₹2,563.08 |
| 2 | 5.43.1:- Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. 1. For thickness of tiles 10 mm to 25 mm [Through Rate] | 123 | P. Sqm. | 22 | ₹2,706 |
| 3 | 11.5.3:- 12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 21.78 | P. Sqm. | 113 | ₹2,461.14 |
| 4 | 10.100.2:- Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 2.57 | P. Cum. | 1,863 | ₹4,787.91 |
| 5 | 7.21.2:- Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 4.98 | P. Cum. | 3,968 | ₹19,760.64 |
| 6 | 21.93.1:- Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer- in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | 3 | Each | 1,155 | ₹3,465 |
| 7 | 21.96.1:- Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 1. 200 mm Outside Dia [Through Rate] | 22 | P. Mtr. | 1,513 | ₹33,286 |
| 8 | 6.1.1:- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:11⁄2:3 (1 Cement: 11⁄2 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 9.81 | P. Cum. | 3,975 | ₹38,994.75 |
| 9 | 6.14.2:- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 1.41 | P. Cum. | 3,875 | ₹5,463.75 |
| 10 | 14.51.1:- Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum [Through rate] | 6 | P. Day | 6,493 | ₹38,958 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_619174.xls
BOQ • 0.24 MB
AD0174162.pdf
Additional Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .