Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC NAVALBARI DIST DARJEELING WEST BENGAL | DARJEELING | WEST BENGAL | ₹5.2 L | L1 | Accepted-AOC lowest |
| 2 | L2₹5.6 LRejected-Finance COLLAGE PARA BURIBALASON BAGDOGRA BAGDOGRA DARJEELING WEST BENGAL 734014 | BAGDOGRA | DARJEELING | WEST BENGAL | 734014 | ₹5.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹5.6 LRejected-Finance | ₹5.6 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 174 BAKSARA L M C SARANI JAMRULTALA HOWRAH WEST BENGAL 711110 UDYAM WB 08 0014261 | HOWRAH | WEST BENGAL | 711110 | - | - | Rejected-Technical Technically not qualified |
| 5 | Rejected-Technical 40 RAI CHARAN GHOSH LANE TILJALA KOLKATA 700039 | KOLKATA | KOLKATA | WEST BENGAL | 700039 | - | - | Rejected-Technical Technically not qualified |
Tender Value
₹5.6 L
EMD Value
₹11,162
Closing Date
12 Dec 2025, 3:00 pmClosed
BDO NAXALBARI DEVELOPMENT OFFICE
NAXALBARI BLOCK
Solar drinking water unit at Bdhubhusan Pry, School at Babupara PS - 79 at Naxalbari GP under Naxalbari Development Block Fund - APAS
2025_DMD_948098_1
NIeT NO- 48/APAS/2025-26 (Ist call)
Open Tender
CIVIL WORKS
60 days
NAXALBARI BLOCK
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,162
18 May 2026
14 Nov 2025
15 Dec 2025
14 Nov 2025
12 Dec 2025
14 Nov 2025
PWD Schedule of rates Page No - lItem No - 2 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding lateriatc or sandstone) including removing. spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1.50 m
PWD Schedule of rates Page No - lItem No - 3 Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150mm including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) a) With earth obtained from excavation of foundation
Supplying and laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small piece in the interestic including rolling and prepairing the bed to proper level and filling up all joints with sandy clay or earth. (Rate analysis enclosed)
PWD Schedule of rates Page No - 24 Item No - 10 Cement concrete with 30 mm down graded shingles excluding shuttering (N.B. Variety). In ground floor a) 6:3: 1 proportion.(Rate analysis enclosed)
PWD Schedule of rates Page No - 26 Item No - 10 Cement concrete with 20 mm down graded shingles excluding shuttering (N.B. Variety). In ground floor a) 1:1.5:3 proportion.(Rate analysis enclosed)
PWD Schedule of rates Page No - 13 Item No - 6 (b) Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to Plinth).a) Steel shuttering or 9 mm to 12 mm thick approved quality ply board shuttering in any concrete work.
PWDSchedule of rates Page No - 26 Item No - 12 Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. a) For works in foundation, basement and upto roof of ground floor / upto 4 m above G.L.(Rate analysis enclosed)
125 mm thick Brick work with first class brick in cement mortar ( 4:1 ) in ground floor(Rate analysis enclosed)
PWD Schedule of rates Page No - 151 Item No - 2 Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface, including throating, nosing and drip course where necessary (ground floor). (A) With 4:1 cement mortar. (a) 15 mm thick plaster.(Rate analysis enclosed)
PWD Schedule of rates Page No - 152 Item No - 8 Neat cement punning about 1.5 mm thick in wall, dado, window sills, floor, drains etc.(Rate analysis enclosed)
Greay artificial stone in floor, skirting dado staircase with stone agreegate (1:2:4) as directed including cost of conc. 25 cm thick
M.S. or W.l. ornamental grill of approved design joints continously welded with M.S. flat and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. Grill weighing up to16 kg / m2 and above
Page-13/ It No-19(11) of (A)-(II) G.I. PIPE WORKS AND FITTINGS Supply of PVC pipes & fittings Schedule 80 (medium duly) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS: 1239 (Part - 1).
Add CGST and SGST 18%
Add Cess 1%
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2258538.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid