| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-AOC | ₹13.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.0 L+₹697.90 (0.05%)Rejected-Finance | ₹14.0 L+₹697.90 (0.05%) | L2 | Rejected-Finance L2 |
| 3 | L3₹14.0 L+₹963.10 (0.07%)Rejected-Finance | ₹14.0 L+₹963.10 (0.07%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
20 May 2026, 12:00 pmClosed
EE RED
URMORA SONBHADRA
G.P. SALKHAN SHIVALLA TOLA NALE PAR SARVAJANIK GHAT KA NIRMAN
2026_REDUP_1148298_1
46/SE RED/ 2026-27 DATE- 07.04.2026
Open Tender
Civil Works
Percentage
90 days
SALKHAN
AS PER NIT AND T1
2 documents required · 2 mandatory
₹1,104
₹33,000
28 Jul 2026
14 May 2026
20 May 2026
14 May 2026
20 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation ordinary soil for structures as per drawing and techanical specification clause 305 including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 92.45 | Cum | 381.52 | ₹35,271.52 |
| 2 | Filling in Foundation trenches as per drawing and technical specification Clause 305.3.9 | 55.63 | Cum | 2,328.45 | ₹1,29,531.67 |
| 3 | Plain Cement Concrete (PCC) M-10 (1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802 | 55.63 | Cum | 5,239.35 | ₹2,91,465.04 |
| 4 | Stone Masonary work in cement mortor ( 1:4 ) in foundation complete asper drawing and techanical specification clause 702,704,1202 and 1203 (2nd sort) | 135.15 | Cum | 5,272.41 | ₹7,12,566.21 |
| 5 | Construction of Embankment with Material Obtained from Borrow pits with a lift upto 1.50m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Techinacal Specification Clause 301.5 | 538.97 | Cum | 244.82 | ₹1,31,950.64 |
| 6 | Plastering with cement mortar ( 1:4) , 15 mm thick on brick work in superstructure as per techanical specification clauses 613.4,1204 | 79.2 | Sqm | 197.6 | ₹15,649.92 |
| 7 | Providing PCC M-20 (1:2:4) archtectural coping on the top of wing / return wall . Etc. complete asper drawing and techanical spec.clause 615,710 and 1204.3.11 | 11.86 | Cum | 6,211.48 | ₹73,668.15 |
| 8 | Providing and fixing of Sign Board | 1 | Job | 5,700 | ₹5,700 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_2149319.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .