Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.2 LAccepted-Finance | ₹22.2 L | 1 | Accepted-Finance Accepted |
| 2 | 2₹23.5 LAccepted-Finance | ₹23.5 L | 2 | Accepted-Finance Accepted |
| 3 | 3₹25.0 LAccepted-Finance KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | ₹25.0 L | 3 | Accepted-Finance Accepted |
Tender Value
₹26.1 L
EMD Value
₹26,100
Closing Date
28 May 2026, 5:00 pmClosed
BDO DIGAPAHANDI
BDO PANCHAYAT SAMITI DIGAPAHANDI
Construction of Addl. Class room at Ramjee Degree Mohavidyalaya Bhismagiri of Bhismagiri GP
2026_PRBDP_128998_5
DIGPS-01/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
Bhismagiri
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
BLOCK DEVELOPMENT OFFICER DIGAPAHANDI
₹26,100
30 May 2026
12 May 2026
30 May 2026
12 May 2026
28 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laying and Jointing PVC Pipe. Heading | - | - | - | - |
| 2 | Earth work excavation of foundation in hard soil with intial lead of 1.5m and intial lift of 1.5m including rough dressing and leveling the bed etc. | 50.1 | Cum | 276.89 | ₹13,872.19 |
| 3 | Filling in foundation and plinth with sand well watered and rammed with cost conveyence and rayality etc and complete. | 65.5 | Cum | 660.96 | ₹43,292.88 |
| 4 | Cement Concrete ( 1 : 4 : 8 ) with 4 C.M size H.B.G matel including cost conveynce, rayality etc complite. | 52.5 | Cum | 5,972.52 | ₹3,13,557.3 |
| 5 | R.C.C. M-20 using with 20 mm & down grade size CBG chipes for R.C.C work with cost conveyence etc complete. | 51.9 | Cum | 6,687.37 | ₹3,47,074.5 |
| 6 | Cutting bending, binding and tying in proper position of M.S iron rod for R.C.C work including all cost conveyence of M.S rod. | 57.1 | Qtl | 9,965.31 | ₹5,69,019.2 |
| 7 | Rigid for Smooth centering shuttering for R.C.C work with dismantling after casting of R.C.C work etc and complete. | - | - | - | - |
| 8 | R.C.C foundation & Plinth bend, | 110.9 | Sqm | 248.67 | ₹27,577.5 |
| 9 | R.C.C Lintel | 18.2 | Sqm | 574.03 | ₹10,447.35 |
| 10 | Beam and Column. | 132.6 | Sqm | 1,204.49 | ₹1,59,715.37 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.43 MB
BOQ_590280.xls
BOQ • 0.35 MB
DTCN202627.pdf
Tender Documents • 3.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].