| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC GRAM GANDA KUNWAR PO AMODHA CHHAVNI DISTRICT BASTI UTTAR PRADESH | BASTI | BASTI | UTTAR PRADESH | 30300 | ₹10.8 L | L1 | Accepted-AOC Responsive |
| 2 | L2₹10.8 LRejected-Finance | ₹10.8 L | L2 | Rejected-Finance Unresponsive |
| 3 | L3₹11.1 LRejected-Finance | ₹11.1 L | L3 | Rejected-Finance Unresponsive |
| 4 | L4₹11.8 LRejected-Finance | ₹11.8 L | L4 | Rejected-Finance Unresponsive |
| 5 | L5₹13.2 LRejected-Finance 121004 | ₹13.2 L | L5 | Rejected-Finance Unresponsive |
| Sl No | Description | Qty | Unit | SRI RAM PRAKASH SINGH L4 | M/S SINGH CONSTRUCTION COMPANY L5 | M/S OM PRAKASH SINGH CONTRACTOR L3 | M/S GANESH DUTT SINGH CONTRACTOR L1 | M/S SHIV SHAKTI CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and Laying plain Cement Concrete (M15) 1:2:4 with stone grit in foundation including all lead, lift,cost of all materail,labor ,T&p etc. complete. | 29.91 | M3 | 9,500 ₹2,84,126 | 11,500 ₹3,43,942 | 8,000 ₹2,39,264 | 8,845.8 ₹2,64,560.19 | 7,500 ₹2,24,310 Lowest |
| 2.00 | Brick work in 1:4 cement and Coarse sand mortar using class 150 brick including all lead, lift,cost of all materail, labor ,T&p etc. complete. | 49.76 | M3 | 6,600 ₹3,28,416 | 7,200 ₹3,58,272 | 6,500 ₹3,23,440 | 5,250 ₹2,61,240 Lowest | 6,000 ₹2,98,560 |
| 3.00 | Centring and Shuttering for C.C work including all lead, lift,cost of all materail, labor ,T&p etc. complete. | 98 | M2 | 700 ₹68,600 | 600 ₹58,800 | 250 ₹24,500 Lowest | 621.69 ₹60,925.62 | 400 ₹39,200 |
| 4.00 | Struck Deep pointing in1;2 Cement mortar including all lead, lift,cost of all materail, labor ,T&p etc. complete. | 52.7 | M2 | 140 ₹7,377.3 | 120 ₹6,323.4 | 100 ₹5,269.5 Lowest | 122.82 ₹6,472 | 150 ₹7,904.25 |
| 5.00 | Laying cost-in-situ CC Block of size 600x600x300 mm in C.C.1:2:4 with 4.75 mmto 20mm in size stone ballast and coarse sand including all lead, lift,cost of all materail, labor ,T&p etc. complete. | 8.64 | M3 | 10,500 ₹90,720 | 12,000 ₹1,03,680 | 8,500 ₹73,440 Lowest | 9,251.52 ₹79,933.13 | 12,000 ₹1,03,680 |
| 6.00 | Supply & Laying 25.00 mm to 100.00 mm size stone grit in filter including all lead, lift,cost of all materail, labor ,T&p etc. complete. | 5.16 | M3 | 4,500 ₹23,220 | 5,000 ₹25,800 | 3,500 ₹18,060 Lowest | 4,277.06 ₹22,069.63 | 8,000 ₹41,280 |
| 7.00 | Earth work in filling by power transport for lead of up to 1KM including exavation, loding, unloding, stacking, with mechanical compaction and dressing including all lift shall be applicable for lead beyand 630M and up to 1km,excluding rayalty | 1,764 | M3 | 194 ₹3,42,216 | 220 ₹3,88,080 | 225 ₹3,96,900 | 201.48 ₹3,55,410.72 | 160 ₹2,82,240 Lowest |
| 8.00 | Finishing walls with Acrylic Smooth exterior paint of required shade, new work (Two or more coat applied @1.67ltr/10sqm over and including priming coat of exterior primer applied @2.20 kg/10 sqm). Including all materail, labor ,T&p etc. complete. | 119.9 | M2 | 140 ₹16,786 | 150 ₹17,985 | 45 ₹5,395.5 Lowest | 115.23 ₹13,816.08 | 500 ₹59,950 |
| 9.00 | Dewatering with 5KVA gen set during construction including all cost of materaial machinery , labor and T&p etc. complete in all respects for proper completion of work. | 96 | Hr | 155 ₹14,880 | 120 ₹11,520 Lowest | 180 ₹17,280 | 132.48 ₹12,718.08 | 200 ₹19,200 |
| 10.00 | P/F ding board including all lead, lift,cost of all materail, labor ,T&p etc. complete. | 1 | Job | 4,000 ₹4,000 | 600 ₹600 Lowest | 3,000 ₹3,000 | 4,141.31 ₹4,141.31 | 5,000 ₹5,000 |
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
22 Jan 2026, 12:00 pmClosed
O/O Executive Engineer, SNK, Ayodhya
Executive Engineer, SNK, Ayodhya
Construction of Remaining Drainage Syphon of Nagar Dy. System of Kalyanpur Minor at Km. 2.300 in District-Basti.
2026_UPIDC_1105444_1
04/EE/2025-26
Open Tender
Civil Works
Item Rate
60 days
Basti
Please refer tender Document
2 documents required · 2 mandatory
₹944
₹32,000
Yes
7 Mar 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
Providing and Laying plain Cement Concrete (M15) 1:2:4 with stone grit in foundation including all lead, lift,cost of all materail,labor ,T&p etc. complete.
Brick work in 1:4 cement and Coarse sand mortar using class 150 brick including all lead, lift,cost of all materail, labor ,T&p etc. complete.
Centring and Shuttering for C.C work including all lead, lift,cost of all materail, labor ,T&p etc. complete.
Struck Deep pointing in1;2 Cement mortar including all lead, lift,cost of all materail, labor ,T&p etc. complete.
Laying cost-in-situ CC Block of size 600x600x300 mm in C.C.1:2:4 with 4.75 mmto 20mm in size stone ballast and coarse sand including all lead, lift,cost of all materail, labor ,T&p etc. complete.
Supply & Laying 25.00 mm to 100.00 mm size stone grit in filter including all lead, lift,cost of all materail, labor ,T&p etc. complete.
Earth work in filling by power transport for lead of up to 1KM including exavation, loding, unloding, stacking, with mechanical compaction and dressing including all lift shall be applicable for lead beyand 630M and up to 1km,excluding rayalty
Finishing walls with Acrylic Smooth exterior paint of required shade, new work (Two or more coat applied @1.67ltr/10sqm over and including priming coat of exterior primer applied @2.20 kg/10 sqm). Including all materail, labor ,T&p etc. complete.
Dewatering with 5KVA gen set during construction including all cost of materaial machinery , labor and T&p etc. complete in all respects for proper completion of work.
P/F ding board including all lead, lift,cost of all materail, labor ,T&p etc. complete.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.73 MB
BOQ_2039642.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].