Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-Finance | ₹8.9 L | L1 | Accepted-Finance Agreement With L1 |
| 2 | L2₹9.6 LRejected-Finance | ₹9.6 L | L2 | Rejected-Finance Agreement With L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | MUKESH TYAGI L1 | ASKA MARKETING L2 |
|---|---|---|---|---|---|
| 1.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours per CuM. | 22.32 | CUM | 4,500 ₹1.0 L | 4,770 ₹1.1 L |
| 2.00 | Providing Cement pointing (Struck Deep) on brick masonary in 1:3 Cement Mortar including cost of all material, T&P and labour per SqM. | 166.04 | SQM | 135 ₹22,415.40 | 127 ₹21,087.08 |
| 3.00 | Finishing wall with weather coat by premium acrylic exterior paint applied @ 3.28 ltr/10 sqm (Asian or Berger Brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg/10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 557.43 | SQM | 120 ₹66,891.60 | 119 ₹66,334.17 |
| 4.00 | Painting and printing letters upto 30cm hight including supply all material labour T&P etc. required for proper complition of work. | 12 | NO | 200 ₹2,400 | 240 ₹2,880 |
| 5.00 | Providing & laying C.C. 1:1.5:3 with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | 66 | CUM | 5,400 ₹3.6 L | 5,851 ₹3.9 L |
| 6.00 | Supplying & Laying Boulder Stone(40 to 70 kg) in Launching apron per Cum | 2,871.8 | CUM | 72 ₹2.1 L | 90 ₹2.6 L |
| 7.00 | Greasing oiling of component of lifting mechanism of gates (excluding rollers) after proper cleaning with replacing Grease cup/Grease Nipple as required including cost of all material, labour and T&P etc. required proper completion of work. | 15 | NO | 4,800 ₹72,000 | 4,335 ₹65,025 |
| 8.00 | Replacing of bottom rubber seal as per IS code 11855 by removing old damaged side rubber seal from gate, scrapping and cleaning surface, making holes, fixing and clamping the M.S plate by new counters sunk head high tensile bolts , nuts and washer, making adjust ment as per requirement of site including cost of all material, labour and T&P required for proper completion of work. for size 80x20 mm. | 15 | NO | 2,700 ₹40,500 | 2,440 ₹36,600 |
| 9.00 | Painting of gates and appurtenances by applying 1 coat of red oxide zinc chromate primer and 2 coat of high build black bituminous paint of standard make after proper cleaning.scrapping the surface including cost of material, all material, labour T&P and scaffolding bridges with proper safety arrangement as required for proper completion of work. | 90 | SQM | 220 ₹19,800 | 205 ₹18,450 |
Tender Value
₹11.1 L
EMD Value
₹22,280
Closing Date
27 Sept 2025, 5:00 pmClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-02/EE/2025-26 Repair and painting work of VRB located at Km 90.615, 93.060, 94.990, 96.733, 98.180, 99.810 and fall located at Km 90.600, 96.540 of Anupshahar branch. Lot No-04
2025_UPIDC_1075611_4
TN-02/EE/2025-26
Open Tender
Civil Works
30 days
As Per Tender Document
As Per Tender Document
3 documents required · 3 mandatory
₹944
₹22,280
EE ABDGC MEERUT NEAR MAWANA BUS STAND MEERUT
9 Feb 2026
20 Sept 2025
29 Sept 2025
20 Sept 2025
27 Sept 2025
20 Sept 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid