Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹12,200
Closing Date
25 Sept 2020, 2:00 pmClosed
EXECUTIVE ENGINEER (SDW) II
S.T.P. OKHLA MATHURA ROAD NEW DELHI-110025
Providing/ fixing of controlling system at aeration unit of 16 MGD STP Okhla.
2020_DJB_194637_8
NIT No-05 EE (SDW) II/ (20-21)
Open Tender
Electrical Works
Works
45 days
S.T.P. OKHLA MATHURA ROAD NEW DELHI-110025
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c 50448339804
₹12,200
30 Sept 2020
17 Sept 2020
25 Sept 2020
17 Sept 2020
25 Sept 2020
17 Sept 2020
Automatically operated star delta panel 415 V, 50 Hz, 3 phase, 50 Hz, 40HP heavy duty double contact with 1 No. U/V release, 3 Nos. Overload coil with single phase preventer, indicating light, metering, MCCB 160 amp TP for incomer with copper extension link for incoming and outgoing cable connection with motor and starter enclosure with canopy made out of 14 SWG CRCA sheet totally enclosed, powder coated free standing, floor mounted type, dust& vermin proof , outward opening, lockable doors having hidden hinges and a bolted back cover both using non-deteriorating neoprene rubber gaskets with IP 54 protection. The bus bar of the panel will be shaped out of high conductivity, electrolytic conductor and shall be liberal sized. The bus-bar support insulator will be made of materials such as SMC/DMC. The bus bar will be covered with heat shrinkable PVC sleeve throughout in red, yellow & blue color to identify three phases & black for neutral. The bus-bar support insulator made of non-deteriorating, vermin proof, non hygroscopic materials such as SMC/DMC. Make of Starter:- L&T, Siemens, Bentex. Make of MCCB:- L&T, Siemens, C&S.
PVC Insulated copper flexible single core cable 25 sq mm. Make:- Havells/Universal/Grandlay/ICC
Dismantling of old damaged structure/enclosure at site by removing cable connection and shifting the same. Fixing/grouting of the MS angle stand and enclosure at site at convenient height to operate suitably by welding or nut bolts as required at site with necessary civil work. Fitting of the starter panel on MS angle stand through welding or nut bolt as per site requirement, making cable connection with thimble, tapping etc re-dressing of cable wherever required.
Testing & Commissioning of the Starter Panel and installed equipments, setting of relay, as per required parameters with relevant IS. Testing of the panel prior to switching on as follows:- i) Continuity and earth testing, ii) Meggering of all equipments for phase to phase, neutral to body, neutral to earth and phase to earth., iii) Checking for all tightness of nut & bolts, iv) alignment of doors etc., v) Interlocking tests, vi) All Function tests
Premier Engineering Company
HYDROCON ENGINEERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .