Tender Value
₹1.9 L
EMD Value
₹4,000
Closing Date
24 Jun 2026, 2:00 pmClosed
E.E.tubewell
Golf Green water supply office
REPAIRING OF 140 NOS. SMALL DIA TUBEWELL IN DIFFERENT WARDS UNDER BOROUGH-X
2026_KMC_1028103_1
KMC/TW/EE/25-26/RP/X/03/2nd Call.
Open Tender
MECHANICAL
Percentage
140 days
Different location of Br-X
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,000
25 Jul 2026
16 Jun 2026
27 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (C) III: Labour Rate for Sanitary and Plumbing 1.Plumbing Mistry NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates. | - | EA | 326 | - |
| 2 | (C) III: Labour Rate for Sanitary and Plumbing 5.Plumbing Helper NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates. Page 113 of 124 | - | EA | 270 | - |
| 3 | SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (b) Repair workes 2 Repairing chocked up tube well by cleaning and washing with chemical including pumping with powerful pump. (i) 40 mm to 50 mm dia. tube well upto 100 metre deep | - | EST | 2,347 | - |
| 4 | CARRYING ETC. STORE MATERIALS VIZ PIPE, STRAINER, PUMP ETC FORM STORE TO WORK SITE (I) FOR DEPTH UPTO 100 M ( AS PER APPROVAL OF M.I.C ITEM NO. M46.4 DATED 23.06.2017 | - | EA | 1,097.25 | - |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | - | MTR | 17 | - |
| 6 | Estimated amount | - | - | - | - |
| 7 | GST 18% | - | Nos | - | - |
| 8 | CESS 1% | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_2525360.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .