Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-AOC PLOT NO 23 RAKSHA COLONY KATOL ROAD NAGPUR 440013 | NAGPUR | MAHARASHTRA | 440013 | ₹2.4 L | 1 | Accepted-AOC Accepted. |
| 2 | Rejected-Technical | - | - | Rejected-Technical NOT BEING L1 TENDERER |
| 3 | Rejected-Technical BARDE LAYOUT NEAR SAI MANDIR PLOT NO 39 BORGAON GOREWADA ROAD NAGPUR MAHARASHTRA 440001 | NAGPUR | NAGPUR | MAHARASHTRA | 440001 | - | - | Rejected-Technical NOT BEING L1 TENDERER |
| 4 | Rejected-Technical 170 NIT LAYOUT PLOT NO 273 VISHWAS NAGAR NEAR JARIPATKA POLICE STATION NAGPUR 440014 | NAGPUR | NAGPUR | MAHARASHTRA | 440014 | - | - | Rejected-Technical NOT BEING L1 TENDERER |
| 5 | Rejected-Technical PLOT NO 50 SINDHI COLONY KHAMLA NAGPUR 440015 M S | NAGPUR | NAGPUR | MAHARASHTRA | 440015 | - | - | Rejected-Technical NOT BEING L1 TENDERER |
Tender Value
₹4.3 L
EMD Value
₹5,400
Closing Date
4 Nov 2023, 5:00 pmClosed
Manager (Civil)/(Civil-Welfare) Deptt
OFFICE OF THE GM(C)/(Civil-Welfare) Dept. WCL HQ,COAL ESTATE,CIVIL LINES NAGPUR
Repair to the damaged boundary walls and making of RCC drain at Coal Club at KV Colony WCL HQ., Nagpur.
2023_WCL_291941_1
wcl-hq-civ-welfare-e27-2023-24
Open Tender
Civil Works - Others
Item Rate
45 days
WCL HQ NAGPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,400
12 Dec 2023
23 Oct 2023
6 Nov 2023
24 Oct 2023
4 Nov 2023
24 Oct 2023
24 Oct 2023 - 28 Oct 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind of soils.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand).
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Hot rolled deformed bars
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied@ 2.20 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 13.99.1 One or more coats on old work
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-incharge, beyond 50 m initial lead, for all leads including all lifts involved.
Total impact of GST for the purpose of CTC
M. L. BANIK
SANTOSHKUMAR RAI
M/S. SAGAR CONSTRUCTION
S. B. GOSWAMI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_302393.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .