| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | Admitted-Finance |
| 2 | Admitted-Finance RZ 212F D BLOCK RAJ NAGAR PART II PALAM COLONY NEW DELHI 110077 | SOUTH WEST | DELHI | 110077 | Admitted-Finance |
| 3 | Admitted-Finance A 303 VEENA CGHS LTD PLOT NO 5D SECTOR 22 DWARKA NEW DELHI 110077 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110077 | Admitted-Finance |
| 4 | Admitted-Finance NO 9 BYRAVESHWARA INDUSTRIAL ESTATE ANDRAHALLI MAIN ROAD NEAR PEENYA 2ND STAGE BENGALURU 560 091 | BENGALURU URBAN | KARNATAKA | 560091 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
21 Sept 2020, 6:00 pmClosed
MR ARJUN PATRO
GE U ELECTRIC SUPPLY DELHI CANTT-10
Provision of RMU with connected items at NSB II Narayna Bagh provision of high mast light at Palam Bagh Special Repairs of transformer APFC Panel board earthing and connected works in Palam Bagh area of AGE U Elect Supply No I under GE U Elect Suppl
2020_MES_365699_1
GE ELECT/D-73/2020-2021
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE U ELECTRIC SUPPLY DELHI CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE U ELECTRIC SUPPLY
₹74,000
Yes
23 Sept 2020
24 Aug 2020
23 Sept 2020
25 Aug 2020
21 Sept 2020
9 Sept 2020
Amount
Disconnecting electrically and mechanically indoor/outdoor transformer capacity upto 400 KVA from HT/LT terminals and lowering down/getting out from 2/4/6 pole structure/plinth or inside sub station for major repairing/minor repair complete all as specified and directed .
Disconnecting electrically and mechanically indoor/outdoor transformer capacity upto 100 KVA from HT/LT terminals and lowering down/getting out from 2/4/6 pole structure/plinth or inside sub station for major repairing/minor repair complete all as specified and directed .
M&l for draining out complete transformer oil from transformer of upto 1500 KVA capacity at site which found major repair and storing the oil in suitable container (container to be provided by the contractor to keep aside for re-use (after repair) and lifting of core assembly by opening of top cover and other items for inspection/examination of core assembly, after mainor repairs its fixing in original position, or for major repairs transformer to make it ready for transportation to carry out rewinding work in workshop (Transportation charges shall be borne by the contractor against item No 1 & 2 of schedule ‘A’ here in after)
M&L for transportation of unserviceable transformer of capacity upto 400 KVA from site to workshop and return back for installation it on original position/location after repairing from workshop (Rate is deemed to be inclusive of transportation, T&P and man power) complete all as specified and directed .
Shifting of serviceable transformer of capacity upto 400 KVA from MES store Yard/Sub Stn (indoor/outdoor) for installation in place of unserviceable transformer and back after replacing with repaired transformer
M&L labour for alternative arrangement by hiring, transportation of transformer of capacity upto 250 KVA in place of unserviceable transformer on hire basis for 15 days including, installation, connecting and testing of transformer and return back after installation of repaired transformer complete all as specifed and directed. Note : (i) Repairing of transformer have to be completed within 15 days no extra cost will be paid toward hiring charges beyond 15 days . Moreover contractor shall not be allowed to shift the hired transformer until it is replaced by the repaired transformer . In case any fault /burning /peeling of painting and any other defects occured in hired transformer the contractor shall have to made good himself from his own expenses. (ii) Contractor should check the available infrasturcture and to be sure regarding safety of hired transformer before installation . The rete quoted is deemed to be include transportation cost, earthing lead etc. (iii) In case the defective transformer not repaired & installed on its site within the specified period of 15 days from the date of handing over to contractor a panelty recovery @ Rs 1000 /- per day will be charged from his dues. During this period contractor shall not be allowed to shift the hired transformer until it is replaced by the repaired transformer . No extra cost beyond 15 days will be paid to contractor on this account.
Taking down the unserviceable copper wound from transformer of capacity upto 400 KVA, opening top cover, and carrying out the following work complete all as specified and directed :- (a) Dismantling of all attachment viz breather assembly, conservator, oil temperature gauge, HT/LT bushing etc. and keeping aside for reuse. (b) Taking out the core with winding assembly. (c) Removing of complete winding from core and dismantling the core, cleaning of core laminate sheet and keeping aside for reuse (d) Cleaning of complete transformer tank oil fins, removing of sludge, and making the inside surface of tank dry by blowing of hot air as directed and specified. (e) Painting of outside surfaces of transformer complete by means of spray machine as directed.
All as per item No 7 here-in -before but capacity of transformer 100 KVA.
(a) Repairs to the transformer of capacity upto 400 KVA as follows :- (i) Rewinding of HT/LT leg coil complete using copper wire /strip of appropriate gauge, size and turn as per existing with double paper coated insulation including all requisite insulating materials like packing sleeves, separator, tapes etc. heating, varnishing the core and winding assembly after framing up top and bottom steel structure of transformer all as specified and directed. (ii) Replacement of all insulating materials other than incorporated for rewinding of HT/LT coils as per existing. (iii) Fixing only HT procelain bushing with studs, nuts, washers 3 Nos. and LT procelain bushing with studs, nuts, and washers 4 Nos. and connection with primary and secondary windings and reconnecting with the main terminals as required and directed. (iv) Fixing only breather assembly, conservator, oil temperature gauge after proper cleaning, minor repairs etc. as required and directed. (v) Replacement of all unserviceable gasket from top cover, HT/LT bushing with new one by using rubberised gasket sheet 4.0mm/6.0mm thick duly pasted with suitable adhesive . (vi) Replacement of unserviceable bolts with new one and fixing of existing serviceable bolts, nuts, washers of different sizes and tightening properly. (vii) Repositioning of core and winding assembly inside the tank, assembling complete unit and making the transformer ready for filling oil and subsequent testing as directed.
(b) M& L for transportation of repaired transformer to the original position (from where taken-down), disconnecting the alternative transformer, taking down the same, Re-installation of repaired indoor/outdoor transformer on 4/6 pole structure/plinth/inside sub station, connecting electrically and mechanically, testing and commissioning complete all as specified and directed. (c) The contractor shall give written warranty of one year from the certified date of completion for the repaired transformer. Note :- HT/LT leg coils and transformer oil required for top up shall be measured and paid separately under relevant items of this Schedule here-in-after as supply only.
All as per item No 9 here-in -before but capacity of transformer 100 KVA.
Supply only HT/LT coils with super enamelled copper wire /DPC of high quality duly matching with the existing guage and impedance.
M&L for ON load Centrifuging and dehydration including filteration and cleaning of transformer oil by dehydration machine of 33 KV /11KV and 11/0.433 KV transformer at site and topping up deficient transformer oil including testing of samples before and after dehydration and filteration complete all as specified and directed. Note :- Deficient quantity of Transformer oil required for top up shall be measured and paid separately under relevant items of this Schedule here-in-after as supply only.
Supply only transformer oil of approved quality as per IS having dielectric strength of 45-60 KV in 2.5mm gap for filling in transformer or for topping up as required and directed
Supplying and fixing in replacement (at site/workshop), Porcelain Transformer bushing on LT (440 Volt) side, including brass stems conical bush and gasket after disconnecting electrically and mechanically for indoor/outdoor transformer of capacity upto 100 KVA and re-connecting electrically and mechanically, testing complete all as specified and directed. Note.The rates quoted is deemed to be included the cost of necessary labour charges for draining out & re-filling transforer oil, opening of top cover by unscrewing nut, bolts washers and suitable size pad type bus bar almuminium and nut bolt washers etc.
All as per Serial item No 14 here-in-before but capacity 400 KV
Supplying and fixing in replacement (at site/workshop), Porcelain Transformer bushing on HT (11 KV) side, including brass stems conical bush and gasket after disconnecting electrically and mechanically for indoor/outdoor transformer of capacity upto 100 KVA and connecting electrically and mechanically, testing complete all as specified and directed. Note.The rates quoted is deemed to be included the cost of necessary labour charges for draining out & re-filling transforer oil, opening of top cover by unscrewing nut, bolts washers and suitable size pad type bus bar almuminium and nut bolt washers and reconnection
All as per Serial item No 16 here-in-before but 400 KVA
Supplying and fixing in replacement, Silica Gel Breather assembly including vent pipe and Silica Gel for indoor/outdoor transformers, capacity upto 100 to 250 KVA complete all as specified and directed.
All as per Serial item No 18 here-in-before but capacity 400 KVA
Supply and fixing Thermometer of transformer capacity upto 400 KVA complete all as specified and directed.
Material & Labour for painting of transformer of capacity upto 100 to 250 KVA with existing colour, with spraying machine, after cleaning, preparation of outer surface of transformer, including writing of SM No, MES and capacity of transformer complete all as specified and directed.
Material & Labour for painting of transformer of capacity 400 KVA with existing colour, with spraying machine, after cleaning, preparation of outer surface of transformer, including writing of SM No, MES and capacity of transformer complete all as specified and directed.
Earthing complete with galvanized steel earth plate electrode of size 60cmx60cmx6 mm thick, buried directly in ground (earth pit not less than 3.5 m below normal ground level) with top edge of earth plate not less than 2.5m below normal ground level, connected to galvanized iron strip 32X6 mm by means of electric arc welding of galvanised iron or steel as shown in electrical plate No 3 of SSR Part I, connected to earth test point and the equipment on the other side complete all as specified, including testing and commissioning complete all as directed. Note : (a) The unit rates quoted against this item shall be deemed to include the cost of excavation and earth work in any type of soil, common salt & charcoal dust in alternate layers, PCC 1:3:6 as in pit, precast RCC 1:2:4 type B-1 with necessary reinforcement as in cover & frame for pit, funnel, watering pipe 20 mm bore GI pipe light grade, protection pipe 40 mm bore GI pipe light grade etc. (b) The quoted rates shall also deemed to include the cost of earth test point and earth strip/GI earthing and protection pipe upto 7.5 meter beyond the earth plates electrode.
M&L 32x6mm galvanised iron strip for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in pipe or any other indicated situation for loop earthing etc complete all as specified and directed.
Disconnecting electrically & mechanically outdoor transforemrs upto 400 KVA capacity, lowering down/getting out from plinth carefully for repairing /making of plinth of transformer and re- connecting electrically and mechanically after repairing/making of plinth , testing and commissioning complete all as specified and directed. Note:- (a) The rates quoted is deemed to be included for hydra, men power and other items required for temp energization of transformer. (b) Plinth work shall measured and paid separetely under items of sch of work here-in-after.
Supply and fill in replacement silica gel for transformer complete all as directed
M&L Brick work with sub-class 'B' bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:6 complete as specified and directed.
M&L Rendering 15mm thick on fair faces of brick work or concrete surfaces in cement mortar (1:4) finished fair and even without using extra cement complete as specified and directed.
M & L for PCC 1:3:6 type C-2 (using 40 mm gradded aggregate) for foundation, filling and mass concrete etc complete all as specified and directed .
M & L for cement concrete type B-1, 1:2:4, 50 mm thick (using 20 mm gradded aggregate) for floors and paving etc complete all as specified and directed.
Disconnect carefully APFC panel from supply, cleaning, dismantling and replacement of following items.
S&F round cap capacitor of capacity 5 kVAR 440 V 50 Hz.
S&F round cap capacitor of capacity 10 kVAR 440 V 50 Hz.
S&F round cap capacitor of capacity 25 kVAR 440 V 50 Hz.
S&F round cap capacitor of capacity 50 kVAR 440 V 50 Hz.
S&F 8 stage relay
S&F 5 stage relay
S&F contractor mnx 45
S&F contractor mnx 70
S&F LED indicator
S&Fpush button
Replacement of internal wiring of APFC panel board
Cleaning, rubbing rusted part of pannel board free from rust & painting complete panel board
Excavation in trenches not exc. 1.5 m wide and not exc 1.5 mtr deep in soft loose soil for laying / taking up/ taking down of cables and getting out and levelling of bottom suface to required level all as specified and directed by Engineer- in- Charge.
Returning filling in,. Including spreading, levelling,. Watering and well ramming soil in layers not exceeding 25 cm thick all as specified and directed.
Removing excavated material (ie soil) from site to a distance n. exc 50 mtrs away and depositing where directed at a level n. exc. 1.5 mtr above the starting point all as specified and directed by Engineer-in-Charge.
Material and labour for river washed and screened, dry sand for filling in trenches below and around underground cables for cushioning of cables etc, complete all as specified.
S&F sub class B bricks having minimum compressive strength 75 Kg/ Sqcm laid in trenches for cable protection etc complete all as directed by Engineer-in-Charge. Note : Measurement shall be taken after putting down.
Supplying, laying, jointing testing and connecting XLPE insulated, 16 sqmm 4 core screened, PVC bedded, galvanised steel strip or wire armoured, electric power cable (heavy duty) with multistranded aluminum conductors, IS 7098 marked, suitable for HT 1100 V system, laid in trenches fixed to pole, including jointing & testing complete all as specified and directed. Note :- Excavation, earth work ,cable protection , sand fillings , cable joint shall be measured and paid separately under respective items of schedule.
All as per item No 49 above but 35 Sqmm 3.5 core.
All as per item No 49 above but 50 Sqmm 3.5 core.
All as per item No 49 above but 185 Sqmm 3.5 core.
S&F GI Pipe (light grade) with necessary accessories/ fittings for cable protections/pole for crossing of culverts/nallah of 50 mm bore sizes
S&F GI Pipe (light grade) with necessary accessories/ fittings for cable protections/pole for crossing of culverts/nallah of 100 mm bore sizes
M&L for High galvanized mast light 20 Mtr height suitable for 6 to 9 lantern symmetrically fitted along with their control gear and having two points suspension system with stainless steel wire rope of 6 mm dia 97/19 gauge and double drum winch with luminaire mounting arm,pully assembly, aviation obstruction light, lightning arrester spike including RCC foundation as per height.
S&F MCCB 4 pole 63A with breaking capacity 25 KA including fixed on existing LT panel complete.
Supply, installation, commisioning and testing of LT 415 Volts 50 Hz, timer panel out door type made out of CRCA sheet 3.15 mm thick made to shape for fitted with the followiing:- (a) 3 pole power contactor ML-6 - 01 No (b) Intelligent light base outdoor lighting control switch three phase upto 20 amp per phase -01 No (c) Switch fuse disconnector (panel mounting cubical type ) TPN, 415 Volts open execution with 3 No HRC fuses, 15 Amps,-01 No (d) Panel wiring with single core copper flexible cable 1.5 Sqmm PVC insulated, 1100 volts grade from switch connector fuse to ML-6 contactor including copper lugs and timer wiring contactor coil wiring with 1.5 Sqmm copper cable PVC insulated including copper lugs of proper size. (e) Complete cable connections of incoming/outgoing cables and testing on load after completion of work all as specified
Supply and fix in replacement suspension type decorative street light fitting, made of spun aluminium housing, polycarbonate diffuser protector with IP 65 protection for optical compartment with 60 W LED systemas per sample, duly pre wired 230 volts AC , 50 Hz . Make : Philips/Wippro/Havels/Twinkle.
Supply and fix PVC insulated copper cable Three core of size 2.5 sqmm
Supply & Fix fiber/GRP KIOSK box weather proof incluiding made out of one piece mounted SMC base and door pole mounted hinged door size 333x233x120 mm out side and 300x200x105 mm inside dimensions comprising of aluminium bus bar 4 strip for 3 phase and neutral 63 Amps and 02 A SP MCB with base incluiding embossing/ painting of danger notice of size not less than 10cm x 7.5 cm with letters,figures band conventional skull and bones in signal red colour on front face of KIOSK box body complete all as specified and directed.
S&F LED street light fitting 45 watt pressure dia cast aluminum housing, heat resistant toughened class with frame, IP 66 protection and better optics for uniform distribution Cat Ref : Nexus LSTO-45-CDL of Crompton or equivalent.
Supply & installing steel tubular swaged poles type 410 SP-31 (9 mtr long) of approx wt.147 kg conforming to IS 2713 (Part-II) including excavation, earth work, PCC foundation, base plate,PCC coping,GI pipe for cable protection etc. and GI bracket for fitting mounting, complete all as per manufacturer's instructions and as specified and as directed by E-in-charge. NOTE:- The unit rate in this item is deemed to be included the cost of exacavation and earth work in soft/loose soil,PCC foundation 1:4:8 type D-2 (40 mm graded stone aggregate), PCC coping 1:2:4 type B-1 (20 mm graded stone aggregate) as in steel tubular pole and GI bracket made of GI pipe medium grade 40 mm bore, 1.5 mtr long for fixing of street light fitings . The steel pole shall be painted by bituminious paint total length inside and up to planting depth outside and remaining portion of pole painted with two coat of aluminium paint over a coat of red oxide complete all as specified and directed
Boring of holes under road, pavement, hard standing by trenchless technology using ultra sounding technique and necessary machine including HDPE pipe of 150 mm dia suitable for 0.6 mpa working pressure
Boring of hole under road/pavement/hard standing or any other situation by mannual means and suitable for passing of GI pipe 100 to 150 mm bore and making good both ends all specified and directed
M/L for earthing complete with galvanized steel earth plate electrode 60cmx60cmx6 mm buried directly in ground vertically to depth not less than 2.25 mtr below ground level with top edge of earth plate at depth not less than 1.5 Mtr below ground level connected to and including galvanized earth lead wire 4 mm dia by means of bolts, nuts, check nuts and washers etc made of galvanized iron and connected to switch board through test point all as shown in SSR part I 1991 and as specified or indicated and testing on completion including earth work and excavation in any type of soil / rock PCC (1:3:6) in chamber 50 mm thick cement concrete (1:2:4) type reinforced with welded steel wire fabric (XPN) weight not less than 4 Kg/Sqm with frame funnel and GI watering pipe of 20 mm dia medium grade wire mesh 15 mm dia bore light grade protection pipe to test point including testing etc all complete as specified.
Dismantling of HT concrete pole ( Rate is deemed to be inclusive of , T&P and man power ) and depositing in low line area complete all as specified and directed
Dismantling of cross Arms of MS channel or Angle iron or flat iron sections from pole.
Dismantling of insulators of any type and size.
Dismantling crefully Old unserviceble ACSR conductor jumper from 4 pole structhure complete.
Dismantling of air break gang operated switches vertical/horizontal mounted including insulators and operating mechanism including droup out fuse.
Supplying , installation, testing and commissioning of 11 KV, 630 Amps having short circuit capacity 20kA/3-sec, Outdoor (IP54), RMU (Ring main unit) 5-way comprising of 02 Nos motorized operated Load Break Switch and 03 Nos 630 Amp Fixed-Type motorized spring-charging VCB electrolytic grade copper busbars all inside single, gas-filled, robotically welded stainless steel 304 (Non Ferrite Non Megnetic Grade) tank with min. thickness 3+0.5 mm, IP 67 Degree of Protection , internal-arc classified 20kA/1sec, on-site-repairable with site replacable bushing/coupling/mechanism, gas refilling etc. The enclosure shall have padlockable double-door access with anti-theft higes, fully covering the front facia and cable boxes to ensure fail-safe anti-theft protection. The unit alongwith Bus-connected, fixed-type Auxiliary transformer shall include the following along with all necessary accessories and fittings as required at site.
(A) 02 Nos. Incoming Load Break Switch module each consisting of following accessories :- (i) Each switching-unit is designed as a three position switch. This three function switch combines the functions of switch-disconnector and earthing switch. (ii) 11kV, 630A Load Break Switch with interlocked line-earthing scheme both short circuit current - 20kA/3-sec, Making Capacity - 50kAp -01 No (iii) Auxiliary contacts - 1NO + 1NC-01 No (iv) Spring-assisted snap-action motorized mechanism with un-inhibited operating shaft for emergency manual operation with integrated earthing switch -01 No (v) Cable terminals (site replacable Cable bushings situated not beyond 300mm from cable-cover to allow ease of access for installation/testing/replacement purposes) with double-door arrangement for enhanced safety (IP54+IP3X) interlocked to prevent access upto 11 KV , 300 Sqmm , 3 Core , XLPE AL cable termination in live-condition. Each Set of 03
(vi) Right angle boots (push on type)-Each Set of 03 (vii) Arc proof cable covers having cable entry from bottom , front with Interlocking mechanism including earth switch -01 No (viii) Capacitive voltage indication fixed type system as per IEC61243 with LED - 01 Set (ix) Fault Passage Indicator - It is to be provided for each incomer load break unit, FPI with LED/digital display to be added for detection of cable fault-01 No (x) ON, OFF, EARTH mechanical indication on the front mimic of the panel - 01 No
(B) 03 Nos. Outgoing VCB module each consisting of following accessories :- (i) Each function-unit consists of a vacuum-circuit breaker in combination with a three position-switch.The three-position-switch fulfills the operation of the disconnector-function and earthing function. (ii) 11kV, 630A Fixed-Type VCB module with series disconnector cum earthing switch of short circuit breaking current/withstand - 20kA/3-sec, Making Capacity - 50kAp-01 No (iii) Aux. contacts - 1NO+1NC-01 No (iv) Stored-energy motorized high-endurance spring charging mechanism (M1+), with inbuilt spring-charging lever and mechanically latched ON/OFF push-buttons to allow handle-less and un-inhibited operation -01 No (v) Cable terminals (site replacable Cable bushings situated not beyond 300mm from cable-cover to allow ease of access for installation/testing/replacement purposes) with double-door arrangement for enhanced safety (IP54+IP3X) interlocked to prevent access upto 11 KV , 185 Sqmm , 3 Core, XLPE AL cable termination in live-condition. Each Set of 3 (vi) Right angle boots (push on type)-Each set of 3
(vii) 3O/C + 1E/F self powered numerical protection relay with Low and High set for Over current and Earth Fault. Relay should have facility to display the maximum loaded phase current also.Relay shall record minimum 5 fault records with time stamping. Relay shall be communicable with RS 485 Port on MODBUS Protocol-01 No (viii) Associated ring-core cast-resin insulated CTs 100/1 Amp , 2.5 VA, 10P10 for protection - Each Set of 3 (ix) Arc proof cable covers with self Interlocking mechanism with earth switch -01 No (x) Capacitive voltage indication fixed type system as per IEC61243 with LED -01 No (xi) Push button for breaker trip (xii) Shunt trip coil 24V DC - 01 (xiii) ON, OFF, TRIP mechanical indication on the front mimic of the panel - 01. (xiv) Emergency Trip Push Button - 01.
(C) 01 No. Bus-connected, fixed-type Auxiliary transformer with floor-mounted compartment of matching height and depth, positioned along-side RMU to provide required aux. supply and metering consisting of following accessories :- (i) 1-Ph (11kV/rt3):230VAC, 500VA Auxiliary transformer-01 No (ii) 2x12 Volt DC battery-01 Set (iii) Battery charger-01 No (iv) HRC fuse-links for primary side isolation and AC/DC MCBs for secondary isolation-01 Set (v) Voltmeter & RYB LED Indications to confirm AC/DC supply availability-01 Set (vi) Anti-condensation space-heater-01 No (vii) CFL lamp for illumination and 3-pin socket with switch -01 No
(D) Additional equipment deliverd separately or mounted seperately :- (i) Operationg Handle for Manual Isolator/Disconnector/Earthing Operation-02 Nos (ii) Standard Manometer -01 No (iii) Operation and Maintenance Manual -01 No (iv) Installation & Commissioning Manual -01 No (v) Cable clamping provision (standard) -01No
Note:- (i) It is preferable to have all feeder-switches inside single stainless steel compartment with incomer feeders at the extremities to prevent chances of failure due to plug-in coupling arrangement. (ii) Necessay interclocking arrangement shall be provided for safety and operations (iii) Above switchgear shall confirm to relevant IEC (62271-200) for design, manufacturing and internal arc compliance. Any claims towards internal arc compliance, number of mechanical/electrical/short-circuit operations, gas-leakage rates etc. shall not be accepted unless proven via type-test reports of model being offered. (iv) Cost of construction of foundation including construction material, necessary earth work and excavaton as per manufacturer design for RMU complete all as required at site are deemed to be included in the quoted rate.
S&F 4 mm dia MS wire 75x75 mm mesh, made upto into mattress or cages appx 2.0 mtr height and fixed with flate iron/angle by welding in position and directed including complete all as specified and directed including dismantling of old unserviciable existing wire mesh. Note:- MS angle, MS flate, Nuts, Bolts and washer will be measured and paid sepretly.
M & L for two coats of synthetic enamel paint of silver colour on steel surfaces over a coat of red oxide primer including preparation of surfaces complete all as specified.
M&L for MS work of angles for post and struts of fencing around transformer plinth/RMU etc drilling holes, flate iron fillet for securing wire mess by welding to angle iron frame and framed work as in door/ gate of angle and wire mess. Door to be fixed by 03 Nos 100mm long hinges and one sliding door bolt of 300mm long for locking arrangement complete all as specified including dismantling of old unserviciable MS work.
Material and labour for cement concrete type D-2, 1:4:8 (using 40 mm graded crushed stone aggregate) for sub floors, sub-bases, floors, foundation and paving etc complete all as specified and directed .
Supply and laying factory made non-reinforced precast concrete cable cover class HV type-I with size 300mmx180mmx40mm all as specified and directed.
Taking out the old unserviceable HT underground cable 120 Sqmm 3 core, 11000 volts grade, XLPE insulated armoured heavy duty with multistrand aluminium conductors from trenches / wall / floor / road / culverts or pole of following sizes :- (Note:- Excavation and earth work, duck work , GI pipe for laying of cable and sand cushing / cable protection covers etc are beyond the scope of this item and shall be measured & paid for separately under relevant items of sch).
Supply and laying XLPE insulated, screened, PVC bedded steel strip/wire armoured heavy duty electric cable suitable for 11KV earthed system of cross sectional area 3 core 120 Sq mm.
S&F Cable jointing kit for 11 KV (Earthed) grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for XLPE armoured aluminium conductor cable of size 3 core 120 sqmm to 185 sqmm.
S&F Cable jointing kit for 11 KV (Earthed) grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for XLPE armoured aluminium conductor cable of size 3 core 120 Sqmm to185 sqmm.
M&L Cable jointing kit for 11 KV (Earthed) grade cable for outdoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured aluminium conductor cable of size 120 Sqmm to 185 Sqmm.
M & L for cement concrete type B-2, 1:2:4, 75 mm thick (using 40 mm gradded aggregate) for floors and paving etc complete all as specified and directed.
Material and labour for crushed stone aggregate of size 20mm, for loose filling under 2/4/6 pole structure / along the transformer plinth in side the fencing area after cleaning/ surface excavation and including making boundary around the 2/4/6 pole structure/ transformer fencing area using sub class B brick etc, complete all as specified.
Disconnecting electrically (and mechanically, ) outdoor transforemrs upto 315 KVA capacity, lowering down from 4 pole structure carefully and Re-installation of transformer on plinth , connecting electrically and mechanically, testing and commissioning complete all as specified and directed.( Rate is deemed to be inclusive of , T&P and man power ) complete all as specified and directed.
Supply, laying and testing of LT cable XLPE insulated, PVC Sheathed, galvanized iron strip or wire armoured, electric power cable (heavy duty) with aluminium conductor,1100 Volts grade cross sectional area of 25 Sqmm x 4 Core.
Supply errection in position & fixing of complete lighiting system using raising and lowering type of high mast tower of 16 Mtr conforming to IS 875 Part III 1987 and suitable for 180 KM/hour wind speed for mounting lantern ring suitable for fixing of 150 watts LED fiood lights fittings 09 Nos(symmetrically fitted, including wiring from ground level to top of the mast, the mast should be motor operated for up and down, double drum carriage, double drum winch 6 mm 316 grade SS having rope of 7/19 with central core SS, construction trailing cable 3 core x 2.5 sqmm 1 No per mast up to heigh, foundation nut and bolt of suitable size hot dipped galvanised from special steel along with nuts and washers, anchor plates and template & circuit wiring with 10 sqmm copper wire, and power tool control, including RCC foundation as per manufacturers design and drawing complete all as specified & directed. NOTE :- The cost of excavation, earth work and PCC for foundation of high Mast is deemed to included in the quoted rate.
Supply and fix Double wall corrugated high density polyethylene (DWC HDPE) pipe along with street light poles up to height of pole box, internal dia size 50 mm conforming to IS 14930 (part-2) structured-wall plastics piping systems all as specified and directed Make : Alom Poly extrusion ltd./Rex poly extrusion ltd./Gemini Group of companies.
Earthing complete with galvanized steel earth plate electorde of size60x60x6mm thick burried directly in ground (earth pit not less than 2.50 m deep below ground level) with top edge of earth plate not less than 1.5 mtr below normal ground level connected to galvanized iron strip 25x4 mm by means of electric arc welding of galvanized iron or steel all as shown in electrical plate No 3 of SSR Part I connected to earth test point and the equipment to be earthed all including testing and commissioning complete all as directed.
Boring holes 2 m deep in soil for under-reamed piles and getting out and disposal of spoil to a distance of n exc. 50 mm bore complete
Supply and fixing of MCCB 125 Amp, 4 pole , 25 KA, 50 Hz including MCCB sheet metal enclosure mounted on wall with fastner and suitable size of nut and bolts complete all as directed .
All as per item No 90 but 63 Amp, 4 pole 25 KA.
Supply and fix Energy saving, environmental friendly, long life, LED street light made up of pressure dia cast aluminium housing with high efficient lighting source with toughened glass having IP66 protection LED street light of capacity 70 Watt complete all as specified.
M&L for Demolation of road, path, drain and concrete in ground floors, RCC/Brick wall (below or above ground level) complete all as specified and as directed.
M&L for providing cement concrete 1:2:4 type B-2 (using 40 mm grade crushed stone aggregate) 250 mm Thick complete all as specified and as directed by Engr in charge.
Supply and fix Energy saving, environmental friendly, long life, exclusive innovative die-cast aluminium IP66 LED flood light suitable for high lighiting architectural façade and general purpose lighiting of capacity 150 Watt LED complete all as specified.
Supply in fix automatic light timer switch with nature switch Cat No SWADEEP-03EC12KW3P-DUEL, infra ray sensor with pre down switching off timer 4-8 hrs of maximum load capacity of 4 KW per phase. Degree of protection conforms to IP 65.
S & F of twin dome aviation obstruction lights including all fixing accessories completed all as per specified and directed.
Note : contractor should procure and provide 50 % of the material as listed above within 15 days of the placing of work order and shall be verified by the Eng-in-charge
Vijay Electricals
MV Engineers And Contractors
Ridhi engineers and builders
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .