Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC 1550 3 KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | ₹4.0 L | L1 | Accepted-AOC RATE AFTER NEGOTIATION |
| 2 | L2₹4.0 L+₹2,460.33 (0.62%)Rejected-AOC HOUSE NO 747 3 URBAN ESTATE 136131 | KURUKSHETRA | HARYANA | 136131 | ₹4.0 L+₹2,460.33 (0.62%) | L2 | Rejected-AOC 2ND LOWEST |
| 3 | Not Admitted-Fee/PreQual/Technical JAGADHARI | JAGADHARI | YAMUNANAGAR | HARYANA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.0 L
EMD Value
₹8,100
Closing Date
20 May 2026, 2:00 pmClosed
Nidhi bhardwaj
Horticulture Panchkula
A/Mtc of L/s work in Tau devi Lal Park in Sector-2 kurukshetra (Repair of toe wall , providing and fixing of grills etc in in Town Park Sector 2 Kurukshetra and all other works contingent thereto)
2026_HBC_521758_1
2026B4F8625E 6494 4B6F BD3F FA50C1F95C57263HSV
Open Tender
Civil Works
Works
75 days
Kurukshetra (Thanesar)
2 documents required · 2 mandatory
₹250
Yes
₹8,100
Yes
3 Aug 2026
14 May 2026
21 May 2026
14 May 2026
20 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.25.1]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 1. Flush / Ruled/ Struck or weathered pointing | 48 | Sqm | 79 | ₹3,792 |
| 2 | [11.6.2]15 mm cement plaster on the rough side of single or half brick wall of mix : 2. 1:6 (1 cement: 6 fine sand) | 274 | Sqm | 127 | ₹34,798 |
| 3 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,950 | Kg. | 83 | ₹1,61,850 |
| 4 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar | 3 | cum | 585 | ₹1,755 |
| 5 | [6.14.2]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 3 | cum | 3,875 | ₹11,625 |
| 6 | [6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts | 36 | Sqm | 261 | ₹9,396 |
| 7 | [6.8.2]Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 2. 40mm thick | 45 | Sqm | 133 | ₹5,985 |
| 8 | [7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) | 42 | cum | 4,146 | ₹1,74,132 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_600669.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .