Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹2.6 CrAdmitted-Finance | -18.80% | ₹2.6 Cr | H1 | Admitted-Finance |
| 2 | H2₹2.2 CrAdmitted-Finance | -29.92% | ₹2.2 Cr | H2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical DisQualified |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
25 May 2026, 4:00 pmClosed
Commissioner SMC
Karan Nagar Srinagar
Plantation upgradation of Parks in Srinagar City pertaining to Right River Works Division with 02 years O and M
2026_HAUDD_308744_1
NIT 02 of 2026 SMC JCW
Open Tender
Civil Works
365 days
Srinagar
Refer to NIt
3 documents required · 3 mandatory
₹5,500
02160102000007 FA CAO SMC
₹6.3 L
Office of the Joint Commissioner Works SMC Karan N
17 Jun 2026
28 Apr 2026
26 May 2026
28 Apr 2026
25 May 2026
4 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Items | |||||
| 1.01 | Dismantling steel work in single sections including dismembering and stacking within 50 meters lead in : Channels, angles, tees and flats | 14,265.18 | Kgs | 1.75 | ₹24,964.07 |
| 2.01 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 25 mm and upto 40 mm. | 723.78 | Sqm | 89.95 | ₹65,104.01 |
| 3.01 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm | 76.65 | Sqm | 57 | ₹4,369.05 |
| 4.01 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. | 98.95 | Sqm | 38.9 | ₹3,849.15 |
| 5.01 | Demolishing cement concrete work, including disposal of unserviceable material within 50 meters lead. 1:3:6 or richer mix. | 84.87 | Cum | 1,725.2 | ₹1,46,417.72 |
| 6.01 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 33.75 | Cum | 1,740.45 | ₹58,740.19 |
| 7.01 | Dismantling of Chain Link Fencing with Steel Work including stacking of materila within a lead as directed by Engineer In Charge. | 299.64 | Sqm | 50 | ₹14,982 |
| 8.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 75.72 | Sqm | 1,249.1 | ₹94,581.85 |
| 9.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 1 meter from cutting edge | 230.39 | Cum | 479.3 | ₹1,10,425.93 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.50 MB
BOQ_1000216.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid