Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC ELECTRICAL DIVISION HPSEBL MANDI | ₹2.5 L | L1 | Accepted-AOC Lowest rates |
| 2 | L2₹2.6 LRejected-Finance | ₹2.6 L | L2 | Rejected-Finance Higher rates |
| 3 | L3₹2.7 LRejected-Finance VILLAGE AMARU PO SAI TEH BADDI DISTT SOLAN H P | BADDI | SOLAN | HIMACHAL PRADESH | ₹2.7 L | L3 | Rejected-Finance Higher rates |
| 4 | Rejected-Technical VPO JHAJRA TEHSIL NALAGARH DISTT SOLAN | SOLAN | HIMACHAL PRADESH | 171102 | - | - | Rejected-Technical In complete documents |
Tender Value
₹2.5 L
EMD Value
₹2,545
Closing Date
5 Mar 2026, 11:00 amClosed
Sr. executive Engineer
Sr. executive Engineer, Electrical Division, HPSEBL, Arki.
Tender for Providing SOP to LIS Chunar under HP SHIVA project by providing 100KVA S-Stn. aw CT-PT Unit in Electrical section Bhumti, under Electrical Sub-Division, HPSEBL, Bhumti.
2026_HPSEB_129676_1
HPSENL/AED/NIT-48/2025-26
Open Tender
Electrical Works
60 days
Under ED Arki
Please refer Tender documents.
11 documents required · 11 mandatory
₹590
₹2,545
9 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
Material Part of 100KVA S/Stn., (Section Bhumti) (TS No.170/2025-26) (WBS D-25-1880)
Prov. 100 KVA, 11/0.4Kv Transformer. (Provided by HPSEBL)
Panel (Distribution Box LT, 100 kVA DTR MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp
Nuts and Bolts of various sizes (Galvanised / coated) [Preferably 16 mmØ or more (with flat and spring washers)]
Capacitor Bank 415V for 100 kVA DTR 36 kVAr
Material Part of CT/PT unit (Section Bhumti (TS No.170/2025-26) (WBS D-25-1880)
CT-PT Combined Unit [PT:11 kV/110 V) ; CT:10-400/5A]
Energy Meters LT 3-ɸ, 4 wire CT operated Static Tri-Vector meter with Box (CT-1000/5 A) Accuracy Class: 0.5S, Category-C, DLMS Compliant (Provided by HPSEBL)
PVC Multistrand 2.5 mm² copper wire
1 inch dia GI pipe for concealing
bend joints/ elbow
Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro' and 3 No. Double Pole Dead End Structures) (Provided by HPSEBL)
Muffs with concerete filling
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 4 Nos]
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of CT-PT Unit]
MS Angle Iron (50X50x6 mm), Length: 2800 mm x1 Nos for LA's)
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 4 Nos
MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
MS Angle Iron (50x50x6 mm), Length : 950 mm x 2 Nos for Bed Knee bracing
GO AB Switch Unit (11kV, 400A, 25 KA )
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
Pipe Earthing Set
6SWG GI wire for earthing
Half Clamp (MS Flat 50x6mm)
Full Clamps (MS Flat 50x6mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Thimble,300 sq.mm
Copper Thimble 95 sq.mm
Danger Plate
Barbed Wire
Aluminium Paint.
Erection Part of 100KVA S/Stn., (Section Bhumti) (TS No.170/2025-26) (WBS D-25-1880)
Erection of Sub Station (100KVA DTR):- Erection of Transformer, connection to GO Switch, LA, LT Box, Meter Box etc. (Complete in all respect according to REC construction standards.)
Manual carriage of DTR a/w with its accessories
Erection Part of CT/PT unit (Section Bhumti) (TS No.170/2025-26) (WBS D-25-1880)
Erection of CT/PT:- Digging of Pit for Pole &Earthing (2 Nos for pole & 3 Nos for earth),Drilling of holes in X-Arms,Preparation of Plateform Structure Members,CI,AI X-Arm & Knee bracing Set,Erection of Double Pole str,Concreting of RCC Muff,Erection of Plate form,Erection of X-Arms,Drop-out,Lightning Arrester,MCCB,Switch LT Box,Energy Meter ,Erection of CT/PT, Providing earthing connection to G.O Switch,transformer,Ligthning Arrester etc, (Complete in all respect according to REC construction standards.)
Manual carriage of Material for avg. distance
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
SBD48.pdf
Tender Documents • 2.68 MB
BOQ_191712.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid