Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹2.3 L+₹9,965.92 (4.44%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Registration Not Renewal, IT Last year Not Submitted | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| Sl No | Description | Qty | Unit | gajapathi govindasamy L1 | V.MUNIYANDI L2 |
|---|---|---|---|---|---|
| 1.00Construction of RCC slab culvert in Thirunilai village at thirunilai panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .3/2026-27 scheme of SFC DP -2026-27 | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc | 39.31 | Cum | 236.9 ₹9,312.54 Lowest | 247.22 ₹9,718.22 |
| 3.00 | CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc. | 9.07 | Cum | 4,820.4 ₹43,721.03 Lowest | 5,034 ₹45,658.38 |
| 4.00 | Supplying and centering of sides and sofits includign supports and strutting upto base | 34.56 | Sqm | 492.3 ₹17,013.89 Lowest | 514.18 ₹17,770.06 |
| 5.00 | CC 1:3:6 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete. | 9.11 | Cum | 5,067 ₹46,160.37 Lowest | 5,292 ₹48,210.12 |
| 6.00 | Supplying and centering of sides and sofits includign supports and strutting Above base | 15.41 | Sqm | 985.5 ₹15,186.56 Lowest | 1,030 ₹15,872.3 |
| 7.00 | Supplying and fabrication of steel including cost and conveyance of all labour charges | 0.45 | MT | 82,738 ₹37,232.1 Lowest | 86,417 ₹38,887.65 |
| 8.00 | RCC 1:1.5:3 mix using (One cement two sand and four hard bronken granite stone) using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to site and all labour charges at site including curing etc comp | 3.78 | Cum | 8,189 ₹30,954.42 Lowest | 8,558 ₹32,349.24 |
| 9.00 | Filling with US gravel including all labour charges etc complete | 10.35 | Cum | 347 ₹3,591.45 Lowest | 362 ₹3,746.7 |
| 10.00 | CC 1:2:4 mix using 20mm ISS HBG Metal including all cost and conveyance etc.complete. | 3.56 | Cum | 6,000 ₹21,360 Lowest | 6,260 ₹22,285.6 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Developement Officer BP
Block Developement Office Thiruporur
Construction of RCC slab culvert in Thirunilai village at thirunilai panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .3/2026-27 scheme of SFC DP -2026-27
2026_RDTN_718113_1
RCNO 181/2025/A2/dt 12.10.2026
Open Tender
Civil Works - Others
Item Rate
Thirunilai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹3,000
Yes
Block Developement Office Thiruporur
19 Nov 2026
26 Oct 2026
10 Nov 2026
26 Oct 2026
10 Nov 2026
26 Oct 2026
29 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of RCC slab culvert in Thirunilai village at thirunilai panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2026-27 having Package No .3/2026-27 scheme of SFC DP -2026-27 | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc | 39.31 | Cum | - | - |
| 3 | CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc. | 9.07 | Cum | - | - |
| 4 | Supplying and centering of sides and sofits includign supports and strutting upto base | 34.56 | Sqm | - | - |
| 5 | CC 1:3:6 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete. | 9.11 | Cum | - | - |
| 6 | Supplying and centering of sides and sofits includign supports and strutting Above base | 15.41 | Sqm | - | - |
| 7 | Supplying and fabrication of steel including cost and conveyance of all labour charges | 0.45 | MT | - | - |
| 8 | RCC 1:1.5:3 mix using (One cement two sand and four hard bronken granite stone) using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to site and all labour charges at site including curing etc comp | 3.78 | Cum | - | - |
| 9 | Filling with US gravel including all labour charges etc complete | 10.35 | Cum | - | - |
| 10 | CC 1:2:4 mix using 20mm ISS HBG Metal including all cost and conveyance etc.complete. | 3.56 | Cum | - | - |
stage.html
html • 0.03 MB
finance_862490.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_862490.xls
BOQ • 0.24 MB
Technical.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .