| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹18.8 LAccepted-AOC | L-1 | Accepted-AOC Rates on lesser side | |
| 2 | L-2₹19.9 L+₹35,249.92 (1.80%)Rejected-AOC | L-2 | Rejected-AOC Rates on higher side | |
| 3 | L-3₹20.4 L+₹78,143.92 (3.99%)Rejected-AOC | L-3 | Rejected-AOC Rates on higher side | |
| 4 | L-4₹21.0 L+₹1.4 L (7.40%)Rejected-AOC | L-4 | Rejected-AOC Rates on higher side | |
| 5 | L-5₹23.0 L+₹3.5 L (17.7%)Rejected-AOC | L-5 | Rejected-AOC Rates on higher side |
Tender Value
Refer Docs
EMD Value
₹37,832
Closing Date
20 Nov 2020, 5:00 pmClosed
Executive Engineer Jal Shakti Division Chamba
Executive Engineer Jal Shakti Division Chamba
Construction of head weir and other civil work as per NIT
2020_HPIPH_42459_1
EE-JSD-CBA-12585-635 dt. 12.11.2020
Open Tender
Civil Works
Item Rate
547 days
Executive Engineer Jal Shakti Division Chamba
Please refer Tender documents.
8 documents required · 8 mandatory
₹400
₹37,832
Yes
4 Jun 2021
13 Nov 2020
21 Nov 2020
13 Nov 2020
20 Nov 2020
13 Nov 2020
Amount
Cutting in earth work in all kind of soil such as pick, jumper work blasting hard and soft rock chiseling soft or hard rock where blasting is prohibited and disposal of all ececavated earth work in all leads and lifts and to the entire satisfaction of the Engineer-in-charge.
Excavation in foundation trenches etc. in earth work in all depths and in all classification of earth work such as pick work,jumper work,saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/hard rock, where blasting is prohibited,in all lifts including trimming and dressing or dies, levelling of beds to correct grade including shoning structuring, planking timbering and dewatering whereever required staking the excavatd soil not or than 3 mtr clear form edge of excavation and then returning the stacked soil in 15 cm layer when required into plinths, side of foundation etc. consolidating each deposited layer by ramming and watering and then disposing the surplus excavated earth as directed with in all leads & lifts as per direction as satisfaction of Engineer-in-Charge.
Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal sixe) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts, as per direction and entire satisfaction of the Engineer-in-Charge.
Providing and laying cement conrete 1 : 3 :6 . ( 1 cement : 3 sand and : 6 grade stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth upto all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge.
Providing and laying cement concrete 1:6:12(1: cement :6 sand :12 graded crushed stone agg. of 40mm. Nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per direction of the Engineer-in-charge.
Providing and laying cement concrete 1:1.5:3(1: cement :1.5 sand :3 graded crushed stone agg. of 20mm. Nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :-
Foundation footing bases of column and the like mass concrete with in all leads and lifts as per direction of the Engineer-in-charge.
Wall ( any thickness but not less than 0.10 mtr. Thickness) including attached pilasters buttersses, plinth and string courses etc, from top of foundation upto floor two level with in all leads and lifts as per direction of the Engineer-in-charge.
Providing and laying cement concrete 1:2:4(1: cement :2 sand :4 graded crushed stone agg. of 20mm. Nominal size) and curing complete excluding the cost of form work in
Wall ( any thickness but not less than 0.10 mtr. Thickness) including attached pilasters buttersses, plinth and string courses etc, from top of foundation upto floor two level with in all leads and lifts as per direction of the Engineer-in-charge.
Providing and laying cement conctete 1:5:10 (1cement: 5sand: 10graded stone agg. 40mm nominal size) with 15% plum and curing complete excluding cost of form work in R/Wall/Brest walls the size of plum 150 to 300mm as per PWD specification. With in all leads and lifts as per the direction of the Engineer-in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in :-
Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Providing mild steel/tor steel (reinforcement for RCC work) including bending,binding and placing in positioncomplete in all respect including all leads and lifts as per the direction and entire satisfaction of Engineer-in-Charge.
Laying, jointing in trenches 2.50 Kg. F/ cm² working pressure unplasticized pipes conforming to IS: 4984-2016 as amended up to date complete with fitting (Earth work in trenches to be measured & paid for separately) PN 6 with in all leads and lifts, as per direction and entire satisfaction of the Engineer-in-Charge.PE-80 thickness minimum 7.6 & maximum 8.6 SDR-17, IS : 4984-2016..
110mm dia Nominal bore
75mm dia Nominal bore
Providing and fixing GI Tee with in all leads and lifts as per direction of the Engineer-in-charge.
125x80mm dia Nominal bore
Providing and fixing Cast iron Sluice valve of ISI marked various dia Complete with in all leads and lifts as per direction of the Engineer-in-charge.
125mm dia Nominal bore
80mm dia Nominal bore
Madan Thakur
MAHINDER NARYAL
Tirath Singh
Kailash Chand
SANJAY SAINI
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .