Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LQualified Make: NA
Model: Ex 70
Title: Pin Chair TATA Hitachi | Make: NA
Model: Ex 70
Title: Pin Chair TATA Hitachi | L1 | Qualified | |
| 2 | L2₹2.0 L+₹16,321 (8.69%)Qualified Make: NA
Model: Ex 70
Title: Pin Chair TATA Hitachi BAGRI TELECOM N B ROAD TEZPUR SONITPUR ASSAM 784001 | SONITPUR | ASSAM | 784001 | Make: NA
Model: Ex 70
Title: Pin Chair TATA Hitachi | L2 | Qualified | |
| 3 | L3₹2.1 L+₹18,797 (10.0%)Qualified Make: NA
Model: Ex 70
Title: Pin Chair TATA Hitachi | Make: NA
Model: Ex 70
Title: Pin Chair TATA Hitachi | L3 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
7 Jun 2021, 10:00 amClosed
Pin Chair Tata Hitachi Ex 70
Tooth Tata Hitachi
Pin Tooth TATA Hitachi Ex 70
Washer TATA Hitachi Ex 70
Linkage Assembly TATA Hitachi Ex 70
Fuel filter Size II Dozer BD 80
Oil Filter Size II Dozer BD 80
Acclerator Cable JCB JS 205
Hose Bucket Cylinder JCB JS 205
Side Cutter
Tooth Point
PIN
Central Cable
Track Link 24
Track Link 14
Track Bolt
Track Nut
Incrson Slake Assy
Water Temp Guage
Throttle Cable
Element Oil Filter
Cartridge Fuel Filter
Bolt Shoe
Nut Shoe
Universal Joint
Air Filter Inner
Air Filter Outer
Fan Belt vee Ribbed
Wipper Blade
Relay Battery
Work Lamp
Glass Rear Window
Seat Glass window
Track Link R/H
Track Link L/H
Side Cutter L/H
Tooth
Side Cutter R/H
Hose Hydrolic
2370528
GEM/2021/B/1239430
Pin Chair Tata Hitachi Ex 70,Tooth Tata Hitachi,Pin Tooth TATA Hitachi Ex 70,Washer TATA Hitachi Ex
15 days
Assam; Kamrup
Total value wise evaluation
PRODUCT_CUSTOM
| Item | Delivery Location | Qty | Delivery | Spec |
|---|---|---|---|---|
| Pin Chair Tata Hitachi Ex 70 | KAMRUP | 2 | 15 days | |
| Tooth Tata Hitachi | KAMRUP | 20 | 15 days | |
| Pin Tooth TATA Hitachi Ex 70 | KAMRUP | 20 | 15 days | |
| Washer TATA Hitachi Ex 70 | KAMRUP | 20 | 15 days | |
| Linkage Assembly TATA Hitachi Ex 70 | KAMRUP | 2 | 15 days | |
| Fuel filter Size II Dozer BD 80 | KAMRUP | 2 | 15 days | |
| Oil Filter Size II Dozer BD 80 | KAMRUP | 2 | 15 days | |
| Acclerator Cable JCB JS 205 | KAMRUP | 1 | 15 days | |
| Hose Bucket Cylinder JCB JS 205 | KAMRUP | 2 | 15 days | |
| Side Cutter | KAMRUP | 4 | 15 days | - |
| Tooth Point | KAMRUP | 10 | 15 days | |
| PIN | KAMRUP | 10 | 15 days | |
| Central Cable | KAMRUP | 1 | 15 days | - |
| Track Link 24 | KAMRUP | 2 | 15 days | |
| Track Link 14 | KAMRUP | 2 | 15 days | |
| Track Bolt | KAMRUP | 20 | 15 days | |
| Track Nut | KAMRUP | 20 | 15 days | |
| Incrson Slake Assy | KAMRUP | 1 | 15 days | |
| Water Temp Guage | KAMRUP | 2 | 15 days | |
| Throttle Cable | KAMRUP | 2 | 15 days | |
| Element Oil Filter | KAMRUP | 3 | 15 days | |
| Cartridge Fuel Filter | KAMRUP | 3 | 15 days | |
| Bolt Shoe | KAMRUP | 25 | 15 days | |
| Nut Shoe | KAMRUP | 25 | 15 days | - |
| Universal Joint | KAMRUP | 1 | 15 days | |
| Air Filter Inner | KAMRUP | 2 | 15 days | |
| Air Filter Outer | KAMRUP | 2 | 15 days | - |
| Fan Belt vee Ribbed | KAMRUP | 2 | 15 days | |
| Wipper Blade | KAMRUP | 3 | 15 days | |
| Relay Battery | KAMRUP | 2 | 15 days | |
| Work Lamp | KAMRUP | 4 | 15 days | |
| Glass Rear Window | KAMRUP | 1 | 15 days | |
| Seat Glass window | KAMRUP | 1 | 15 days | |
| Track Link R/H | KAMRUP | 2 | 15 days | |
| Track Link L/H | KAMRUP | 2 | 15 days | |
| Side Cutter L/H | KAMRUP | 2 | 15 days | |
| Tooth | KAMRUP | 5 | 15 days | |
| Side Cutter R/H | KAMRUP | 2 | 15 days | - |
| Hose Hydrolic | KAMRUP | 2 | 15 days |
Exempted
14 Jun 2021
28 May 2021
7 Jun 2021
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_2370528.pdf
GEM_BID
specification_2021-05-22-18-41-40_6d2e9f45b46e7a722c4187fc7365c624.pdf
SPECIFICATION
specification_2021-05-22-18-20-22_3a30d04b65170a9cb4a14ec5083e0bb2.pdf
SPECIFICATION
specification_2021-05-22-18-43-30_dd2e17094620c658d67f46434bfe79f7.pdf
SPECIFICATION
specification_2021-05-22-18-44-23_b39043c06bc93d3dbb220eef7d65ff04.pdf
SPECIFICATION
specification_2021-05-22-18-45-48_20efbbe418f2f68f765a499795b18829.pdf
SPECIFICATION
specification_2021-05-22-18-54-40_42f5abf0b90cbe3e427d103640baf6bb.pdf
SPECIFICATION
specification_2021-05-22-18-55-50_70dce64f397115cc4891ab7624fa064e.pdf
SPECIFICATION
specification_2021-05-22-18-57-03_e80000f600ba8456f1b67c025dd4a20f.pdf
SPECIFICATION
specification_2021-05-22-18-58-07_521646342639f5d00a2a923f793652fa.pdf
SPECIFICATION
specification2_2021-05-25-09-18-16_b6ea22ec5db4972fb44083bbe85b7a32.pdf
SPECIFICATION
specification2_2021-05-25-09-26-39_da1a6414e2a6c2ba692627ab64cccea8.pdf
SPECIFICATION
specification2_2021-05-25-09-27-29_f760c9f38cfa2c91047425bcf94cd9f0.pdf
SPECIFICATION
specification2_2021-05-25-09-29-04_dd84058b444e9fabd7eff7203d3d046e.pdf
SPECIFICATION
specification2_2021-05-25-09-30-09_0da128e7a47de7e7a71a624d71cb46ea.pdf
SPECIFICATION
specification2_2021-05-25-09-31-14_dbcffb8edd120fc26b38267fac0aaf15.pdf
SPECIFICATION
specification2_2021-05-25-09-32-07_c8fe1a283bd8f4d0297833f098d7fec6.pdf
SPECIFICATION
specification2_2021-05-25-09-33-04_19e2e2c9066b10ba1ce3365b163f38f4.pdf
SPECIFICATION
specification2_2021-05-25-09-34-16_0dea9992fcd6fa9ab059e3fe66878266.pdf
SPECIFICATION
specification2_2021-05-25-09-35-17_74c3f5dd25751c1c3439d03eba0328e5.pdf
SPECIFICATION
specification2_2021-05-25-09-36-07_9c98d7d2e63979dd7df451311f56d031.pdf
SPECIFICATION
specification2_2021-05-25-09-36-56_e4894e71b98b0edf10d311ef3b906541.pdf
SPECIFICATION
specification2_2021-05-25-09-38-29_e54d6eb27e641b3f392c0b71eb8120fc.pdf
SPECIFICATION
specification2_2021-05-25-09-39-25_da6be2d97efce9188a75d16c0eed88a9.pdf
SPECIFICATION
specification2_2021-05-25-09-41-30_78df09434f376832ffdea15b4bad767c.pdf
SPECIFICATION
specification2_2021-05-25-09-42-50_87cc52014be1d30d31478bb31b111349.pdf
SPECIFICATION
specification2_2021-05-25-09-46-19_1e5168cd436a23e6b8249c70dd2eccc5.pdf
SPECIFICATION
specification2_2021-05-25-09-47-10_0e7276eb0412bf2861b3ee94deff993c.pdf
SPECIFICATION
specification2_2021-05-25-09-48-27_90e27ea672222866f6aa7fcc56484ee1.pdf
SPECIFICATION
specification2_2021-05-25-09-49-20_74d6b7031345b4f5de2a8cae213fbb71.pdf
SPECIFICATION
specification2_2021-05-25-09-50-07_9e60580450b8e8d208c930e0ab0ac8ac.pdf
SPECIFICATION
specification2_2021-05-25-09-55-50_94fa2fea628abd51806f3244297024ae.pdf
SPECIFICATION
specification2_2021-05-25-09-56-55_99bf30b06edc3657e7ea17e52ab8375c.pdf
SPECIFICATION
specification2_2021-05-25-09-57-56_ea124db37087d6a62f22a4d7ff6ffb6c.pdf
SPECIFICATION
specification2_2021-05-25-09-58-46_ff06616a1d087a1c61f528424564c8cc.pdf
SPECIFICATION
specification2_2021-05-25-10-00-08_b5232a464fbaba8ae97e4ac4349894b0.pdf
SPECIFICATION
specification2_2021-05-25-10-02-47_43365f1fc0550a828fb1cd739542b9ac.pdf
SPECIFICATION
specification2_2021-05-25-09-45-11_55307b01c179d05a2f9b0571deb931ec.pdf
SPECIFICATION
specification2_2021-05-25-10-56-54_5936aa942b4fd289e92248a49c909317.pdf
SPECIFICATION
specification2_2021-05-25-10-58-26_38a0d9782c63a7e8596bf031d9d15f5e.pdf
SPECIFICATION
termsCondition.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .