Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
8 Sept 2026, 2:00 pmClosed
XEN PHE Poonch
poonch
Repairing of water tank near H/o mohd aslam ward no. 4 at Pyt Potha Upper Block Surankote
2026_PHE_322409_2
E-NIT No. 20 of 2026-27 Dated 25-08-2026
Open Tender
Civil Works
Percentage
60 days
poonch
Repairing of water tank near H/o mohd aslam ward no. 4 at Pyt Potha Upper Block Surankote
2 documents required · 2 mandatory
₹200
xen phe poonch
₹6,000
22 Sept 2026
25 Aug 2026
9 Sept 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pipes Works | |||||
| 1.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work up to plinth level1:4:8 (1 cement: 4 Coarse sand: 8 graded stone Agg. 40 mm nominal size) Crushed | 7.06 | Cum | 5,202.9 | ₹36,732.47 |
| 1.02 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishinge) and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-in charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level | 3.22 | Cum | 8,021.1 | ₹25,827.94 |
| 1.03 | Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate androofs having slope more than 15° upto floor five level level including curing but excludingthe cost of centering, shuttering finishing and reinforcement with:1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.82 | Cum | 10,377 | ₹18,886.14 |
| 1.04 | Providing and laying in position cement concrete of specified grade including curing but 1:3:6 (1 cement : 3 coarse sand:6 graded stone aggregate 20 mm nominal size) | 7.41 | Cum | 5,733.6 | ₹42,485.98 |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth leveCold twisted bars | 92 | KG | 123.2 | ₹11,334.4 |
| 1.06 | Structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete.
Welded | 10 | KG | 138.2 | ₹1,382 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for: | 6.9 | Sqm | 2,281.2 | ₹15,740.28 |
| 1.08 | 15mm Cement plaster on the rough side of single or half brick wall of
mix:1 : 4 ( 1 cement : 4 fine sand) | 78.33 | Sqm | 327.85 | ₹25,680.49 |
| 1.09 | Extra for Plaster in Circle Work | 78.33 | Sqm | 37.8 | ₹2,960.87 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_1080390.xls
BOQ • 0.76 MB
extpri.pdf
PDF • 0.41 MB
corrpri.pdf
PDF • 1.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .