| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.5 LAdmitted-Finance GSTIN: 20AIUPK2674A1ZINULL | -3.67% | ₹53.5 L | L1 | Admitted-Finance |
| 2 | L2₹54.3 LAdmitted-Finance BHELWADIH SIMDEGA | SIMDEGA | JHARKHAND | 835201 | -2.11% | ₹54.3 L | L2 | Admitted-Finance |
| 3 | L3₹54.9 LAdmitted-Finance GSTIN: 20AHRPJ2720N1ZB | -1.11% | ₹54.9 L | L3 | Admitted-Finance |
Tender Value
₹55.5 L
EMD Value
₹1.1 L
Closing Date
28 Apr 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer, R.D.Spl.Div., Simdega.
Construction of Health Sub Center at village Takba under, Simdega block, Simdega district.
2026_RDSPL_113147_7
RDD/SD/SIMDEGA/05/2025-26
Open Tender
Civil Works
183 days
Simdega block, Simdega district.
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
2 Jun 2026
21 Apr 2026
29 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - A0 and disposal of excavated earth as obtained to a distance upto 50M including all lifts levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I. | 0.8 | Cum | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50M and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | 0.2 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Providing coarse clean Sand in Filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | - | Cum | 1 | - | BI01010001010000000000000515BI0100001114 |
| 4 | Providing designation 75B one brick flat soling joints fitted with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | - | Sqm | 1 | - | BI01010001010000000000000515BI0100001115 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 20 mm nominal size) | 1 | Cum | 1 | ₹1 | BI01010001010000000000000515BI0100001116 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) Foundation | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : Column | 1 | Cum | 1 | ₹1 | BI01010001010000000000000515BI0100001118 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plainwindow sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). Lintel | 0.6 | Cum | 1 | ₹0.6 | BI01010001010000000000000515BI0100001119 |
| 9 | Providing Toe steel reinforcement of 8mm dia rods as approved | 1 | Mt | - | - | BI01010001010000000000000515BI0100001120 |
| 10 | Providing Toe steel reinforcement of 10 mm dia rods as approved | - | Mt | 1 | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_152845.xls
BOQ • 0.38 MB
TenderDocument_05_07.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid