| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹71,943.83Accepted-AOC | ₹71,943.83 | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹73,008.47+₹1,064.64 (1.48%)Rejected-Finance | ₹73,008.47+₹1,064.64 (1.48%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹99,473.89+₹27,530.06 (38.3%)Rejected-Finance AT PO BANDHABAHAL DIST JHARSUGUDA ODISHA 768211 | BANDHABAHAL | JHARSUGUDA | ODISHA | 768211 | ₹99,473.89+₹27,530.06 (38.3%) | L-3 | Rejected-Finance L-3 |
Tender Value
₹1.3 L
EMD Value
₹1,600
Closing Date
25 May 2026, 5:00 pmClosed
STAFF OFFICER CIVIL LAKHANPUR AREA
GM OFFICE MCL LAKHANPUR AREA
Repairing of Barbed Wire Fencing from BOCM Chowk to Triveni Gust House and BCGCL Office to Mangala Maa Mandir Under BIT,Lakhanpur Area.
2026_MCL_359637_1
MCL/GM/LKPA/SOC/e-Tender /26-27/18 dt15.05.2026
Open Tender
Civil Works - Others
Percentage
30 days
GM OFFICE MCL LAKHANPUR AREA
As per NIT
3 documents required · 3 mandatory
₹1,600
Yes
4 Jul 2026
15 May 2026
26 May 2026
15 May 2026
25 May 2026
15 May 2026
15 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WITHOUT ITC AVAILABILITY | |||||
| 0.999 | Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post andcorner post shall be strutted on both sides and end post one sideonly, provided with horizontal lines and two diagonals of barbed wireweighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I. staples on wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 2,593.5 | Meter | 12.7 | ₹32,937.45 |
| 0.000 | Painting with aluminium paint of approved brand and manufacture to give an even shade:One or more coats on old work | 92.25 | Sqm | 72.45 | ₹6,683.51 |
| 0.999 | Finishing walls with Acrylic Smooth exterior paint of required shade:Old work (Two or more coat applied @ 1.67 Itr/ 10 sqm) on existing cement paint surface | 288 | Sqm | 94.6 | ₹27,244.8 |
| 0.000 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1.35 | Cum | 217 | ₹292.95 |
| 0.999 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.35 | Cum | 6,048.05 | ₹8,164.87 |
| 0.000 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.4 | Cum | 8,090.3 | ₹11,326.42 |
| 0.999 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 36 | Sqm | 283.1 | ₹10,191.6 |
| 0.000 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 95 | KG | 101.4 | ₹9,633 |
| 2Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 2.35 MB
Tendernotice_3.pdf
PDF • 1.29 MB
BOQ_372497.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .