| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAccepted-Finance | ₹7.9 Cr | L1 | Accepted-Finance OK |
| 2 | L2₹8.4 Cr+₹47 L (5.95%)Accepted-Finance FLAT NO 5 IIND FLOOR IIIRD B 2 NEHRU NAGAR GHAZIABAD UP 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹8.4 Cr+₹47 L (5.95%) | L2 | Accepted-Finance OK |
| 3 | L3₹8.4 Cr+₹49.5 L (6.26%)Accepted-Finance 14 G F BLK B 5 MODEL TOWN DELHI DELHI 110009 | NORTH WEST DELHI | DELHI | 110009 | ₹8.4 Cr+₹49.5 L (6.26%) | L3 | Accepted-Finance OK |
| 4 | L4₹8.5 Cr+₹63.4 L (8.03%)Accepted-Finance | ₹8.5 Cr+₹63.4 L (8.03%) | L4 | Accepted-Finance OK |
| 5 | Rejected-Technical | - | - | Rejected-Technical NON FULFILMENT OF PQR |
Tender Value
₹7.3 Cr
EMD Value
₹7.5 L
Closing Date
11 Oct 2023, 5:00 pmClosed
SE ETC NOIDA
220 KV SUBSTATION SECTOR-20 NOIDA
Engineering, Supply, Erection and Commissioning of left over work of 132KV GIS Substation Sector-115, Noida
2023_UPTCL_838680_1
E-ST-38/ETCN/2023-24
Open Tender
Electrical Works
Item Rate
180 days
NOIDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
EE ETD NOIDA
₹7.5 L
25 Oct 2023
15 Sept 2023
12 Oct 2023
15 Sept 2023
11 Oct 2023
15 Sept 2023
Amount
SUPPLY
120kV, 10kA Surge Arrester
30kV Surge Arrester
250kV, 33/0.4 KV Substation Transformer
36kV dropout fuse set with post insulator
145kV Termination kit at both ends for 1C x 630 sq. mm. XLPE copper cable(Both ends means outdoor & GIS end).
36kV Termination kit at both ends for 1C x 630 sq. mm. XLPE copper cable(Both ends means outdoor & GIS end).
36kV Termination kit at both ends For 3C x 95 sq. mm. XLPE copper cable(Both ends means outdoor & GIS end).
1.1 KV, Armoured FRLS Copper Control Cable
1.1 KV, Armoured Aluminium Power Cable
145KV XLPE CABLE
145kV, 1Cx630mm2, XLPE Power Cable (Gantry to GIS)
36 KV XLPE CABLE
33kV, 1Cx630mm2, XLPE Power Cable ( Power Transformer to GIS)
33kV, 3Cx95mm2, XLPE Power Cable ( GIS room to station transformer)
Earthing
40mm MS Rod electrode 3000mm long
75x10 mm MS/GS Flat
50x6mm MS Flat
25x6mm MS Flat
75x12 mm Copper Flat
Spike for top of GIS
Main and aux. structure
EOT crane for 132KV GIS Hall
HV Connector for 132/33kV 63MVA T/F
LV Connector for 132/33kV 63MVA T/F
AHU system for 132KV GIS Hall
AHU system for 33kV GIS Hall
36KV LINE ISOLATOR WITH POST INSULATORS ( vertically MANUAL operated) on Double pole.
Energy metering system(0.2class ABT)
0.2s class ABT meter
Metering cubicle for energy meters
Battery bank & Battery charger
110Volt, 300AH Battery Bank
110Volt, 300AH Battery Charger
110Volt, DCDB
415V ACDB (with 2 Nos. I/C & 01 No. DG set I/C)
Fire prevention & extinguishing system
Fire Protection and microprocessor based fire detection alarm system comprising of smoke & heat type detectors for GIS cum control room building,controls & relays panels rooms,DG set room etc. as per technical specifications.
Portable type fire extinguishers
Portable AFFF mechanical foam type fire extinguishers complete with initial charge hose pipe and all other accessories and fittings as per IS 1024 trolley mounted 45/50 litre capacity.
Supply of following fire extinguishers carbon dioxide as per IS specification No. 2878/1986 and as per technical specification.
Supply of dry chemical powder type fire extinguishers of 4.5kg capacity conforming with IS2171/1985 and as per technical specification.
Supply of sand buckets as per technical specification.
Supply of Stand for sand buckets
Illumination system for complete substations (indoor+outdoor)
Control room building
GIS Halls
Relay & protection Panel rooms
Switchyard/street lighting(high mast lighting system)
Testing & Maintenance Equipments for GIS/SPARES
SF6 Gas Pressure Relief Devices, 3 Nos. of each type
SF6 Pressure gauge with coupling device cum switch or density monitors and pressure switch as applicable (1 no. of each type)
Coupling device for pressure gauge cum switch for connecting Gas handling plant
Rubber Gaskets, “O” Rings and Seals for SF6 gas of each type
Molecular filter for SF6 gas with filter bags (20% of total weight)
All types of Control Valves for SF6 gas of each type
SF6 gas (20 % of total gas)
Bottle for SF6 gas filled with SF6 Gas (40 kG each)
All types of coupling for SF6 gas (1 no. of each type)
Density Monitors for SF6 gas
SF6 Dew Point meter
Earth Resistance Tester
10kV Digital Insulation tester (Megger or equivalent make )
Digital Clamp Meter
Fiber Optic Terminal Equipment (FOTE) SDH STM-16
Base equipment suitable for 04 directions in subrack fully equipped with all necessary common cards, power supply cards, other hardware & accessories including 10 Nos. optical patch cords of lengths as per site requirements, DDF etc. with redundant CPU.
Optical Base Card for 04 directions (STM-16) , should also support STM-1 & STM-4 interfaces.
Short Haul, STM-16, 1310nm SFP Transceiver - S16.1
Long Haul, STM-16, 1310nm SFP Transceiver- L-16.1
Long Haul, STM-16, 1550nm SFP Transceiver- L-16.2
Very Long Haul, STM-16 SFP V16.2 to support upto 100 Km.
Ultra Long Haul, STM-16 SFP U16.2 to support upto 120 Km.
Optical Line Interface Card (to support minimum 150 Km. ) STM-16
Short Haul, STM-4, 1310nm SFP Transceiver - S4.1
Long Haul, STM-4, 1310nm SFP Transceiver- L-4.1
Long Haul, STM-4, 1550nm SFP Transceiver- L-4.2
Very Long Haul, STM-4 SFP V4.2 to support upto 100 Km.*
Ultra Long Haul, STM-4 SFP U4.2 to support upto 120 Km. *
Short Haul, STM-1, 1310nm SFP Transceiver - S1.1
Long Haul, STM-1, 1310nm SFP Transceiver- L-1.1
Long Haul, STM-1, 1550nm SFP Transceiver- L-1.2
Very Long Haul, STM-1 SFP V1.2 to support upto 100 Km.*
Ultra Long Haul, STM-1 SFP U1.2 to support upto 120 Km.*
E1 Interfaces (120 Ohm) ( 32 Interfaces with 2 Cards)
L2Etherner Interfaces 10/100 Base T (16 Interfaces with minimum 2 cards)
MDF (200 Pairs), mounted in cabinet
Equipment cabinet for SDH and DTPC 2200mm (h) including 100mm base, w x d should be suitable for 19" or 23" Rack
Erection, testing & commissioning work of following Equipments
63 MVA Power Transormers.
120kV,10kA Surge Arrester
30kV Surge Arrester
250kV, 33/0.4 KV Substation Transformer
36kV dropout fuse set with post insulator
145kV Termination kit at both ends for 1C x 630 sq. mm. XLPE copper cable including all support activities and providing scaffolding etc to make the termination as per specifications of cable manufacturer.
36kV Termination kit at both ends for 1C x 630 sq. mm. XLPE copper cable
36kV Termination kit at both ends For 3C x 95 sq. mm. XLPE copper cable
Laying of 1.1 KV, Armoured FRLS Copper Control Cable including cutting and proper dressing in trenches with appropriate marking etc.
Laying of 1.1 KV, Armoured Aluminium Power Cable including cutting and proper dressing in trenches with appropriate marking etc.
Laying of 145KV XLPE CABLE including cutting and proper dressing in trenches with appropriate marking etc.
145kV, 1Cx630mm2, XLPE Power Cable (Gantry to GIS).
Laying of 36KV XLPE CABLE including cutting and proper dressing in trenches & under ground with appropriate marking etc
33kV, 1Cx630mm2, XLPE Power Cable ( Power Transformer to GIS)
33kV, 3Cx95mm2, XLPE Power Cable ( GIS room to station transformer)
EARTHING works related to
40mm MS Rod electrode 3000mm long
75x10 mm MS/GS Flat
50x6mm MS Flat
25x6mm MS Flat
75x12 mm Copper Flat
Spike for top of GIS
Erection of Main and aux. structure
EOT crane for 132KV GIS Hall including proper operation
AHU system for 132KV GIS Hall
AHU system for 33kV GIS Hall
36KV LINE ISOLATOR WITH POST INSULATORS ( vertically MANUAL operated) on Double pole.
Energy metering system(0.2class ABT)
0.2s class ABT meter
Metering cubicle for energy meters
Battery bank & Battery charger including earthing and all other associated works to completre the job.
110Volt, 300AH Battery Bank
110Volt, 300AH Battery Charger
110Volt, DCDB
415V ACDB (with 2nos. I/C & 01 no. DG set I/C)
Illumination system for complete substations (indoor+outdoor) Illumination system with LED Lampas per technical specification
Control room building
GIS Halls
Relay & protection Panel rooms
Switchyard/street lighting(high mast lighting system)
Providing all supports to OEM for erection and commissioning activities of 132 kV GIS modules and LCC supplied by M/s Hyosung T&D Ltd. alongwith all accessories including termination of cables as per direction of OEM with following details- 1. All special tools and concerned equipments required for erection i.e. crane Hydra, scaffolding, technicians/ labour etc. Will be arranged by contractor. 2. Skilled manpower for erection to be arranged by contractor. 3. Any balance erection works, laying and termination of control cables etc. 4. Regular spanner ratchet and other tools support will also be in this scope of contractor. 5. Any work not covered as mentioned above, however deemed to be necessary for completion of the job of erection and commissioning of GIS modules will also be in this scope of contractor.
Providing all supports to OEM for erection and commissioning activities of 33 kV GIS modules and LCP supplied by M/s ABB(India) Ltd. alongwith all accessories including termination of cables as per direction of OEM with following details-. 1. All necessary helping technical manpower including crane, tools/ tackles, testing and Spears if applicable are to be provided by the contractor. 2. Shifting of panel from store to Switchgear room, Installation of C/I channel for foundation frame of panel. 3. Connection of control cable for transformer and feeders, 4. Earthing pit preparation for internal earthing & external earthing connection. 5. Installation as per new design chucker plate. 6. Any work not covered as mentioned above, however deemed to be necessary for completion of the job of erection and commissioning of GIS modules will also be in this scope of contractor.
Providing all supports to OEM for erection and commissioning activities of Control & relay panels supplied by M/s Sifang Automation Pvt alongwith all accessories including termination of cables as per direction of OEM. 1. Laying and termination of control cable for CT,PT and other equipments with all relays associated with Scada will be in the scope of contractor. 2. Availability of numerical relay test kit with IEC 61850 feature and battery bank will be in this scope of contractor. 3. Cable laying, erection and shifting of 33 KV GIS modules and CRPs to the designated place inside GIS hall and CRP hall will be in this scope of contractor. 4. Any work not covered as mentioned above, however deemed to be necessary for completion of the job of erection and commissioning of GIS modules will also be in this scope of contractor.
Erection, Testing, Commissioning of Fiber Optic Terminal Equipment (FOTE) and Integration with existing fiber optic network of UPPTCL
JSP Projects Private Limited
Sumaja Electroinfra Pvt Ltd
Kanti Prasad Mittal Infra Private Limited
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .