Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | ₹19.8 L | L1 | Accepted-AOC AOC issue |
| 2 | L2₹19.9 L+₹11,994 (0.61%)Rejected-Finance | ₹19.9 L+₹11,994 (0.61%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹20.0 L+₹17,991 (0.91%)Rejected-Finance | ₹20.0 L+₹17,991 (0.91%) | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹20.0 L
EMD Value
₹2.0 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer office, KNN, Motijheel
Construction of selfie point near yateemkhana and construction of lane by C.C. from 97/299 to 97/130 under ward-108 talak mahal zone-4.
2026_NNKAN_1155297_1
901/AA-4/25-26
Open Tender
Civil Works
Percentage
60 days
ward-108, Talak mahal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹2.0 L
27 Aug 2026
30 May 2026
5 Jun 2026
30 May 2026
5 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m as directed by engineer-in-charge; 2.1.1 all kinds of soil. | 23 | M3 | 170 | ₹3,910 |
| 2 | 1:6:12 (1 cement :6 coarse sand (zone-III): 12 graded Brick aggregate 40 mm (nominal size) | 4 | M3 | 4,380 | ₹17,520 |
| 3 | Brick work with common burnt clay (non modular) bricks of class 150 in foundation and plinth in: Cement mortar 1:4 (1Cement: 4 C-Sand) | 10.5 | M3 | 6,600 | ₹69,300 |
| 4 | Providing and laying damp proof course 25mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand (zonelll): 4 graded stone aggregate 12.5mm nominal size) | 17.3 | M3 | 280 | ₹4,844 |
| 5 | Brick work with common burnt clay (non modular) bricks of class 150 in superstructure above plinth level up to floor V level in all shapes and sizes. Cement mortar 1:4 (1Cement: 4 C-Sand) | 12.5 | M3 | 7,500 | ₹93,750 |
| 6 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 1km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc | 47 | M3 | 125 | ₹5,875 |
| 7 | Add Extra on item No. 2.25(a) above for 5 km. Carted Earth | 47 | M3 | 100 | ₹4,700 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:4:8 (1 Cement :4 Coarse sand(zone-III): 8 graded stone aggregate 40mm | 12 | M3 | 5,740 | ₹68,880 |
| 9 | Cement Concrete flooring 1:2:4 (1 cement: 2 coarse : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry etc. all 40mm thick with 20mm nominal size stone aggregate | 118 | M2 | 425 | ₹50,150 |
| 10 | Providing and laying virtified tile s in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved make, in all colours and shade, laid on 20mm thick cement mortar 1:4 (1cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigment etc. complete Size of tile 600x600mm | 172 | M2 | 1,013 | ₹1,74,236 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2164195.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.41 MB
BOQ_2164195.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .