Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹4.9 CrAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹4.9 Cr | l1 | Accepted-AOC L-1, Bidder |
| Sl No | Description | Qty | Unit | GE POWER INDIA LIMITED L1 |
|---|---|---|---|---|
| 1.00SGTPS Birsinghpur | ||||
| 1.01 | Dismantling and Erection of Backstay Beams along with associated attachments (Furnace Left Side & Right Side, Furnace Front & Rear Side, Furnace Hopper Left Side & Right Side)
Dismantling and Erection of MAIN BUCKSTAY BEAM FOR THE FOLLOWING LEVELS:
a) FRONT WALL BUCKSTAY BEAM
(Between Elevation Level 21.008 mtrs. to Elevation Level 42.080 mtrs.)
b) REAR WALL BUCKSTAY BEAM
(Between Elevation Level 21.008 mtrs. to Elevation Level 27.458 mtrs.)
c) LHS WALL BUCKSTAY BEAM
(Between Elevation Level 14.062 mtrs. to Elevation Level 42.080 mtrs.)
d) RHS WALL BUCKSTAY BEAM
(Between Elevation Level 14.062 mtrs. to Elevation Level 42.080 mtrs.)
e) HOPPER LHS WALL BUCKSTAY BEAM
(At Elevation Level 9.800 mtrs.)
f) HOPPER RHS WALL BUCKSTAY BEAM
(At Elevation Level 9.800 mtrs.) | 1 | Job | 4,17,71,000 ₹4.9 Cr |
Tender Value
₹4.9 Cr
Closing Date
31 Jan 2025, 3:00 pmClosed
SE(PNW) SGTPS
SE(PNW) SGTPS
Work Contract for dismantling of existing Buck stay of Water Wall Panel and its Erection, Commissioning in ABL make 210 MW Boiler Unit No.1 of PH-I, SGTPS, MPPGCL, Birsinghpur
2025_MPPGC_397874_1
397874
Single
Electrical and Maintenance Works
80 days
SGTPS MPPGCL BIRSINGHPUR
AS PER NIT CLAUSE 5
8 documents required · 8 mandatory
₹0
Exempted
18 Feb 2026
23 Jan 2025
4 Feb 2025
23 Jan 2025
31 Jan 2025
23 Jan 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid