Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC JAMBAD COLLIERY PARSEA CHURULIA KAJORA 713384 WEST BENGAL INDIA | KAJORA | PASCHIM BARDHAMAN | WEST BENGAL | 713384 | ₹4.7 L | 1 | Accepted-AOC AS PER TC RECOMMENDATION |
| 2 | Rejected-Technical KAJORA KAJORA BAZAR KAJORA GRAM BARDHAMAN 713338 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | - | - | Rejected-Technical as per TCM |
| Sl No | Description | Qty | Unit | PARBATI ENTERPRISE L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 2.00 | Lifting of domestic pump from quarry site to the workshop for repairing | 1 | Nos | 19,688 ₹19,688 |
| 3.00 | Dismantling the domestic pump for repairing | 1 | Nos | 19,688 ₹19,688 |
| 4.00 | Lowering the pump and then fitting it for operation | 1 | Nos | 19,688 ₹19,688 |
| 5.00 | Doing the same job for 2nd pump after the fitting of the 1st pump | 1 | Nos | 19,688 ₹19,688 |
| 6.00 | Fitting of submersible pump motor set and pontoon at coalface sump for pump no. 1 | 1 | Nos | 19,688 ₹19,688 |
| 7.00 | Installation of submersible pump motor pipeline, suction and delivery range and fitting of foot valve | 1 | Nos | 19,688 ₹19,688 |
| 8.00 | Doing the same job for 2nd and 3rd pump in succession one after another | 1 | Nos | 19,688 ₹19,688 |
| 9.00 | Maintenance of the delivery pipeline for next couple of weeks | 1 | Nos | 19,688 ₹19,688 |
| 10.00 | Suction and delivery pipeline work of turbine pump as water level reduces | 1 | Nos | 19,688 ₹19,688 |
Updated dates
Tender Value
₹4.7 L
EMD Value
₹5,900
Closing Date
19 Dec 2025, 5:00 pmClosed
Area Engineer (EnM)
Office of the General Manager, Kajora Area
Dismantling, lifting, repairing of domestic quarry pumps, work of submersible pumps at the coalface, works at main turbine pump etc of Jambad OCP
2025_ECL_348620_1
GM/Kaj/AEEnm/eTender/25-26/30
Open Tender
Electrical and Maintenance Works
30 days
Kajora Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
15 Apr 2026
5 Dec 2025
20 Dec 2025
5 Dec 2025
19 Dec 2025
5 Dec 2025
5 Dec 2025 - 11 Dec 2025
Lifting of domestic pump from quarry site to the workshop for repairing
Dismantling the domestic pump for repairing
Lowering the pump and then fitting it for operation
Doing the same job for 2nd pump after the fitting of the 1st pump
Fitting of submersible pump motor set and pontoon at coalface sump for pump no. 1
Installation of submersible pump motor pipeline, suction and delivery range and fitting of foot valve
Doing the same job for 2nd and 3rd pump in succession one after another
Maintenance of the delivery pipeline for next couple of weeks
Suction and delivery pipeline work of turbine pump as water level reduces
Carrying loading transporting of 6" pipes 8 no. for road crossing at the coal face/haul roads for submersible pump operation
Non return and foot valve changing of no. 1 pump after taking repaired valves from fitter store to site
Foot valve maintenance of domestic pump, Pluro I 4 stage after taking repaired valves from fitter store to site
Lifting of motor or/and pump in case there is fault in the motor in the coming months, then necessary on site repairing and lowering of the pump
Suction side extension and pipeline work in the domestic pumps Pluro I 4 stage pump as and when the water level recedes and also maintenance of the suction pipeline
Road crossing by 4" MS pipe for bigger pump and then making delivery pipeline of the same bigger pump
5/8" x 2" nut bolt
Supply of heliflex hose of submersible pump, durable quality cable of handling 600m
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tendernotice_2.pdf
PDF • 1.17 MB
BOQ_361355.xls
BOQ • 0.33 MB
Annexure.pdf
Other Document • 0.26 MB
Download all tender documents and submit your bid