| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical all documents complete |
| 2 | Accepted-Technical | Accepted-Technical all documents complete |
| 3 | Accepted-Technical STAKMO | Accepted-Technical all documents complete |
| 4 | Accepted-Technical STAKMO | Accepted-Technical all documents complete |
| 5 | Accepted-Technical PHYANG | Accepted-Technical all documents complete |
Tender Value
₹5.8 L
EMD Value
₹11,540
Closing Date
10 Sept 2026, 2:00 pmClosed
Executive Engineer REW Leh
Office of the Executive Engineer REW Leh
Construction of culvert at various places for thiksey.(Balance work)
2026_RDD_19490_1
39- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Payable To Executive engineer REW Leh
₹11,540
14 Sept 2026
4 Sept 2026
11 Sept 2026
4 Sept 2026
10 Sept 2026
4 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 75.7 | cum | 445.85 | ₹33,750.85 |
| 2 | Providing laying of dry stone soling (any thickness) on horizontal level including cost of stone. | 20.52 | cum | 953.02 | ₹19,555.97 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 51.93 | cum | 6,606.08 | ₹3,43,053.73 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having
slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window
sills, staircases and spiral stair cases above plinth level up to floor five level,
excluding the cost of centering, shuttering, finishing and reinforcement, with
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size). | 2.72 | cum | 11,551.66 | ₹31,420.52 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level. | 271.68 | cum | 109.33 | ₹29,702.77 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 5.95 | sqm | 738.64 | ₹4,394.91 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 296.54 | sqm | 314.62 | ₹93,297.41 |
| 8 | Carriage of Sand by an avg lead of 5Km by MT | 25.58 | cum | 201.14 | ₹5,145.16 |
| 9 | Carriage of agg by an average lead of 10km by MT | 48.53 | cum | 295.16 | ₹14,324.11 |
| 10 | Carriage of Cement by an average lead of 10km by MT | 11.42 | MT | 241.38 | ₹2,756.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_46165.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .