| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.3 Cr+₹11.3 L (9.27%)Rejected-Finance 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | ₹1.3 Cr+₹11.3 L (9.27%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹1.4 Cr+₹22.1 L (18.2%)Rejected-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹1.4 Cr+₹22.1 L (18.2%) | L3 | Rejected-Finance Being L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Work Experience with 330TR capacity not avaialable, TDS not supported for relevant completion certificate, Authorized dealership with stipulated TR capacity not available |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
28 Oct 2020, 3:00 pmClosed
Asst.Gen.Manager(E-E)
O/o Asst.Gen.Manager (E-E), AAI, Coimbatore
ARMO of E and M Installations at Coimbatore International Airport. SH Job contract for Operation and Comprehensive Maintenance of the 3x330 TR HVAC plant and ancillary equipments For 02 Years
2020_AAI_59328_1
AAI/CBIA/ENGG(E)/HVAC/20-22
Open Tender
Electrical Works
Works
730 days
Coimbatore International Airport
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,180
Airports Authority of India
₹2.8 L
15 Mar 2022
16 Oct 2020
29 Oct 2020
16 Oct 2020
28 Oct 2020
16 Oct 2020
16 Oct 2020 - 23 Oct 2020
Amount
SUB HEAD-A Comprehensive Maintenance contract for the Centralized Air-Conditioning system of Chiller Units (Trane make)-03 Nos, primary pumps (Kirlosakar make)-3 nos, secondary pump (Grundfoss make)- 3 nos with VFD drive panel, condenser pumps (Crompton make) - 3 nos. Cooling Towers (Advance make)-3 nos along with discharge water line and the necessary statutory approvals/clearnces obtain by the agency in co-ordiantion with AAI , make up water tanks for cooling water with 5000 liters capacity - 2 nos. , ceiling suspended and floor mounted air handling units (Zeco make) with starter panels - 27 nos., and associated modulating valves , all types of valves, strainers, all types of dampers, grills, diffusers, nozzles etc in the chilled water circulation system and air circulation system and all other ancillary equipments, Power and Control panels as per the annexure. The work includes carrying out the periodical maintenance/checking of the above equipments as per manufactures recommendations and/or as per the attached technical conditions, attending the breakdown calls for essential within 24 hours & for non -essential within 48 hours. of discussion with concerned engineer. The employer's decision is for the essencial & non-essentail category will be final. The work also includes repair/replacement of all the spares of chillers, pumps, cooling towers, AHUs and fan coil units, make up water tanks repair/replacement of all gauges, all type of valves, strainers, all type of dampers, diffusers, grills, nozzles, thermostats, switchgears in panels, electrical meters, contactors, timers etc., carrying out all the works required for the smooth operation of the air-conditioning system completer as required.
For First Year(2020-21)
For Second year(2021-22)
Comprehensive Maintenance contract for all Inline exhaust fans different size nearly -10 no's. The work also includes repair/replacement of the spares of Inline fans carrying out the periodical maintenance/checking of the above equipments as per manufactures recommendations and/or as per the attached technical conditions, attending the breakdown calls for essential within 24 hours & for non -essential within 48 hours. of discussion with concerned engineer. The employer's decision is for the essencial & non-essentail category will be final.
For First Year(2020-21)
For Second year(2021-22)
Job Contract for daily operation of 3X330 TR HVAC chiller plant and anciallary equipments in 3 shifts including deputing Supervisor, Shift In-charge/skilled, Semi skilled manpower in all days i/c sundays and holidays complete as required as per enclosed deatiled specifications of work.
For First Year(2020-21)
For Second year(2021-22)
Annual Maintenance of water softening plant of capacity 5 KL per hour installed at plant, carrying out the regeneration of water softening system to achieve desired output hardness of maximum 250 ppm from a maximum input hardness of 2000 ppm. , including providing neccessary material ( common salt) and toping top up resin minimum of 5% of the actual installed capacity as per requirement and atleast once in a year and providing trained manpower, testing the hardness, complete as per specification of work and as required.
For First Year(2020-21)
For Second year(2021-22)
Supply and Installation of exposed ducts with 50mm thick EPS wrapped with thermal barrier and GI wire mesh finished with 12mm thick sand cement pasting.
Supply and Installation of external thermal insulation on ducts withself adhesive as per the specs. 9mm thick insulation for sully & return air ducts in air conditioned area.
Supply and Installation of external thermal insulation on ducts withself adhesive as per the specs. 13mm thick insulation for supply & return air ducts in non air conditioned area
Checking Air quantities and do the air balancing at toilet area.
Supply & painting of HVAC System i/c.water pipelines, Pumps, AHU's, Cooling Tower, LT panels & other equpments with removal exisitng salt deposits over all the equipments with saint papper and painting with corrision resistant paint to match the adjoining areas for maintaining the equipmenet in good & non rusting condition during entire year.
For First Year(2020-21)
For Second year(2021-22)
AHU - 26000 CFM, Coil Size:2730 X 1830 mm
AHU - 25000 CFM,Coil Size:2720 X 1830 mm
AHU - 20000 CFM,Coil Size:2100 X 1830 mm
AHU - 15000 CFM,Coil Size:1840X 1530 mm
AHU - 4000 CFM,Coil Size:1270 X 770 mm
Supply of 30W Ultra voilet Germicidial Irridiation (UVGI) System tubelight with suitable for retrofitting in the exssting mirror optic fitting, along with driver, other accessories etc.
VOLTAS LIMITED
Bluestar Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .