| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Admitted |
| 2 | Accepted-Technical | Accepted-Technical Admitted |
| 3 | Accepted-Technical 24 JEEVAN PLAZA VIRAM KHAND 5 GOMTI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | LUCKNOW | UTTAR PRADESH | Accepted-Technical Admitted |
| 4 | Accepted-Technical SHOP NO 25 JEEVAN PLAZA VIRAM KHAD 5 GOMTI NAGAR LUCKNOW U P 226010 | NA | NA | 226010 | Accepted-Technical Admitted |
Tender Value
Refer Docs
Closing Date
15 Sept 2026, 3:00 pmClosed
Executive Engineer
ICD1st LUCKNOW
QUOTATION FOR PROPOSED UPGRADATION RESTORATION RENOVATION WORKS OF THE OUTER BOUNDARY WALL AND BEAUTIFICATION WORK OF STATUE AND INTERPRETATION WALL AT PT DEEN DAYAL UPADHYAY IRRIGATON AND CULTURAL MUSEUM AND GARDEN RAIBAREILY ROAD LUCKNOW
2026_UPIDC_1183045_1
04/EEICD1LKO/2026-27
Open Tender
Civil Works
Item Rate
LUCKNOW
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
16 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reaserch designing ,providing and installation of multiple forms of artworks on interpretative wall using CNC Machine on 100 mm thick sand stone in front and 30/40 mm thick sand stone with one side shot blasted fixed with dry cladding on other side with SS Cramp on SS Frame work of 304 grade anchored to RCC Wall surface with base plate and anchor fastner as per requirment profile all complete. The design should illustrate in writen words ,pictorial image and pattern design will be depicted with the helps of carving embossing engraving and inserting the depth or the thickness of the letters /image/pattern on the stone wall should range from 20mm thickness to 70mm from the base stone .At least 50%of the surface area of stone cladding wall have decorative artwork 50% area will have plain stone cladding of same materials .The area includes the stone fresh over pedestal & base and 100mm thick coping at top All complete as per the approval of the Architect Engineer -in-charge. | 1 | SQM | - | - |
| 2 | Providing and fixing of CNC cutting in sand stone design text and statue design in interpretative wall front as per engineer etc complete .(Labour charges). | 1 | SQM | - | - |
| 3 | Providing and fixing of 3 MM CORTEN STEEL etc complete. | 1 | SQM | - | - |
| 4 | Providing and laying Non pressure UPVC PIPE with stiff mixture of cement mortar in the proportion of 1:2 (1cement : 2 fine sand ) including testing of joints etc. complete. | 1 | RM | - | - |
| 5 | Supply and laying of 125 micron polythene sheet under the foundation (for antisalt peter treatment ) or over subbase to act as separation between sub-base and coc.slab (for cc.road slab ) including supply of all materials labour etc .complete. | 1 | SQM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 0.28 MB
BOQ_2224800.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .