| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.3 LAccepted-AOC | L1 | Accepted-AOC AOC AFTER DEDUCTION OF SOC | |
| 2 | L2₹44.7 L+₹1.2 L (2.69%)Rejected-Finance FLAT NO 201 GREEN VALLEY CHS PLOT NO 26 SECTOR 19 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L2 | Rejected-Finance NOT ADMITTED BEING L2 | |
| 3 | L3₹46.0 L+₹2.5 L (5.76%)Rejected-Finance | L3 | Rejected-Finance NOT ADMITTED BEING L3 | |
| 4 | L4₹49.3 L+₹5.8 L (13.3%)Rejected-Finance 0001D ATM HOUSE AIR FORCE NEENA THAPA GORAKHPUR UTTAR PRADESH 273008 UDYAM UP 32 0054752 | GORAKHPUR | UTTAR PRADESH | 273008 | L4 | Rejected-Finance NOT ADMITTED BEING L4 | |
| 5 | L5₹49.5 L+₹6.0 L (13.8%)Rejected-Finance 702 A1 SHREE PRASAD TAWADEWADI SHREE DATTAGURU PARK KUMBHARWADA URAN DIST RAIGAD MAHARASHTRA 400 702 | URAN | RAIGAD | MAHARASHTRA | 400702 | L5 | Rejected-Finance NOT ADMITTED BEING L5 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
9 Jul 2024, 6:00 pmClosed
GE NW KARANJA
NAVAL STATION KARANJA, URAN, RAIGAD, MAHARASHTRA
REPAIR MAINT AND REPLACEMENT OF SEWAGE CLEAR WATER SUPPLY PIPE LINE, SEWAGE RAW WATER CLEAR WATER MOTOR PUMP SET AND ALLIED WORKS AND SUPPLY OF WATER IN EMERGENCY THROUGH BOWSER IN NAVAL STATION KARANJA UNDER AGE EM II UNDER GE NW KARANJA
2024_MES_660599_1
8922/E8
Open Tender
Pipes and Pipe related activities
Item Rate
270 days
GE NW KARANJA
D and above a ii
8 documents required · 8 mandatory
₹500
Yes
GE NW KARANJA
₹96,000
Yes
31 Aug 2024
19 Jun 2024
11 Jul 2024
19 Jun 2024
9 Jul 2024
3 Jul 2024
Amount
Notes : (i) The work consists of 01 job as under:- JOB (A) : TPP 23-24 Ser No. 92 (ii) Please refer schedule 'A' notes before quoting the tender. (iii) Amount of Schedule of Credit shall be deducted off line by the department. ITEMS FOR JOB 'A'
Note:- The Unit Rate quoted in r/o Ser item No 3.00 to 17.00 are deemed to include for the following and nothing extra will be paid for these works: 1. Supplying, erecting and use of scaffolding upto required height (max 25 to 30m) or upto 8th floor height with necessary H-frames, pipes, couplers, buckles, bracing, top platform with support railing at top etc. at all levels of building including carriage of the materials to the location, erecting, fixing the scaffolding and dismembering the same after working and taking away the scaffolding materials etc. complete as per direction of Engineer-in-charge. 2. Supplying, erecting & use of temporary bamboo scaffolding around the building as required. The scaffolding is to be secured properly in position by bracings, ties clamps, etc. complete including providing and erecting working platform at all heights as required, including removal after completion of work all as per direction of Engineer-in-Charge.
Repair/replacement of existing unservicable sluice valve (ISI marked)150 mm dia flanged and drill both ends cast iron body, heavy duty spindle type PN 1.6 with and including jointing rubber gasket,nut,bolts etc complete all as specified and directed.
M&L in MS iron frame work using MS channel. MS angle for structural support to pipe lines/base plate for pumps/approach ladder to over head water tanks including taking down/dismantling old one complete all as specified and directed.
Exacavation in trenches n etc. 1.5m wide n exc 1.5m depth and getting out in any type of soil including trimming bottom surface to require level and shape complete all as specified and directed. NOTE:- Taking up pipe with fitting,special valves etc from trench shall be measured and paid separately.
Returning , filling in including spreading, levelling , watering & well ramming in layers n.exc 25cm including making good disturbed surface to original levels complete all as specified and directed.
Removal of exacavated material to a distance n exc 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed.
Labour and tools for removing grass, shrubs, trimming branches of trees in water supply installation and water reservoir and along the pipe line both side and shifting of debris to a distance of 50 mtr away from site complete all as specified and directed.
Supply, laying, testing and commissioning of HDPE (High density polyetylene) pipe, having undermentioned outer diameter with pressure holding capacity 16 Kg/ sqm and PE 100 grade laid in trenches, under floor, passing through pipe, Nala, road etc in long/ short lengths as per site requirement including supply and fixing of required number and type of fittings and accessories and carrout jointing of pipe/ fittings with proper HDPE fusion welding machine including minor accessories to complete the work on site and as specified and directed of the follwoing sizes:- Note :- (i) HDPE pipe fittings shall be measurerd and paid seperately. The HDPE pipe and fittings shall be of same pressure rating and from any one company/ make as mentioned in the approved list. (ii) Any fittings and fixture not mentioned into the Schedule and required at site shall be privieded by contractor for completing the work and testing and commissioning of pipe line and cost of these items deemed to be included in quoted rates. (iii) All the arrangement for fusion welding shall be done by contractor. without any extra cost.
250 mm OD HDPE Pipe
200 mm OD HDPE Pipe
160 mm OD HDPE Pipe
110 mm OD HDPE Pipe
90 mm OD HDPE Pipe
75 mm OD HDPE Pipe
63 mm OD HDPE Pipe
50 mm OD HDPE Pipe
40 mm OD HDPE Pipe
Supply and fixing High density polypropylene full bore ball valve, flanged end, having three piece body made of HDPE material, one spindle of stainless steel, two number PTFE set ring, connector seal, stainless steel (SS 316) nuts, bolt, mild steel PP coated operating handl, stainless steel hex pin, ISI marked, suitable to withstand upto 16 Kg/ sqcm pressure including S & F of HDPE flanged on the all fixing / fitting materials, testing the valve at full pressure against the leakage and full bore flow and suitable for the following sizes of HDPE pipe and complete all as specified and directed:-
200 mm OD HDPE Pipe
110 mm OD HDPE Pipe
90 mm OD HDPE Pipe
75 mm OD HDPE Pipe
63 mm OD HDPE Pipe
50 mm OD HDPE Pipe
40 mm OD HDPE Pipe
25 mm OD HDPE Pipe
M & L for HDPE fittings ISI Marked including all jointing/ fixing/ welding materials for HDPE pipe of undermentioned sizes,butt welded/ flanged joints with washer etc, PE 100 grade having pressure rating not less than 16 Kg/ Cm2 complete all as specified and directed for the foolwing sizes:-
250 mm OD HDPE ELBOW
160 mm OD HDPE ELBOW
110 mm OD HDPE ELBOW
90 mm OD HDPE ELBOW
75 mm OD HDPE ELBOW
63 mm OD HDPE ELBOW
Equal tee of size 250 x 250 x 250 mm ( OD)
Equal tee of size 160 x 160 x 160 mm ( OD)
Equal tee of size 110 x 110 x 110 mm ( OD)
Equal tee of size 90 x 90 x 90 mm ( OD)
Reducer 250 mm x 160 mm ( OD)
Reducer 250 mm x 110 mm ( OD)
Reducer 160 mm x 110 mm ( OD)
Reducer 110 mm x 90 mm ( OD)
Reducer 110 mm x 75 mm ( OD)
Reducer 110 mm x 50 mm ( OD)
Reducer 90 mm x 75 mm ( OD)
Reducer 90 mm x 63 mm ( OD)
Reducer 90 mm x 50 mm ( OD)
250 mm OD HDPE socket
200 mm OD HDPE socket
160 mm OD HDPE socket
110 mm OD HDPE socket
90 mm OD HDPE socket
75 mm OD HDPE socket
63 mm OD HDPE socket
Taking up defective non clogging submersible pump sets complete with motor installed in sewage raw water sump , for replacing of defective pump parts such as pump coupling, bush and impellors with new one including overhauling/rewinding at authorized workshop of manufacturer and fixing back the same in the sewage raw water sump, testing, commissioning for satisfactory performance as per manufacturers instructions all as required costs of required for machining including load testing for stipulated period to entire satisfaction complete all as specified and directed.
Opening the complete motor and removing the complete burnt out winding wire of the stator of the motor removed in respective tems, cleaning the stator with cleaning element, preparing the surface and rewinding with super enameled copper winding wire of pre existing gauge of approved quality , filling the slot with insulating material like fiber sleeves, tapes according to classification of motor, varnishing, heating, etc; and reassemble after repairs including testing and commissioning for rated RPM for the following motors complete all as specified and directed and as per manufacturers instructions:-
Electric motor 5 to 7.5 HP capacity of submersible pump sets.
Electric motor10 to 12.5 HP capacity of submersible pump sets.
Electric motor 25 HP capacity of submersible pump sets.
S&F in repair spares for submersible pump sets of capacity 5 to 10 HP complete all as specified and directed.
Pump coupling
Pump bush
Pump impellor
Pump Bearing
Pump Shaft
S&F in repair spares for submersible pump sets of capacity 12.5 to 25 HP complete all as specified and directed.
Pump coupling
Pump bush
Pump impellor
Pump Bearing
Pump Shaft
S&F in replacement submersible three core flate 4.0 sqm copper cable for submersible pump complete and testing complete all as specified and directed.
S&F in replacement submersible three core flate 10.0 sqm copper cable for submersible pump complete and testing all as specified and directed.
M & L for flexible PVC Suction Hose pipe (Green Colour) 100 mm dia Heavy duty, Superior quality complete all as specified and directed.
Supply only portable water for drinking purpose from the authorised water point through 10000 Ltrs capacity water bowser to MES water supply installations located at NAVAL STATION KARANJA under AGE E/M -II, GE (NW) KARANJA OR ANY WHERE IN NAVAL STATION KARANJA AS PER REQUIREMENT AS DIRECTED complete all as specifeid and directed. Notes:- (a) Water must be portable water. (b) Testing of water for Bacteriological and chemical analysis of bowser will be carried out from the Govt lab. The water sample to be carried in proper sterlized bottle. Munimum one sample as directed by Engr -in-charge per month shall be tested and cost of testing deemed to be included in quoted rates. (c) Calibration chart of water bowser will be submitted by contractor before start of execution of work. The cost of calibration deemed to be within quoted rates. (d) Contractor should be capable to supply minimum 10 Bowser per day or more as per rquirement when necessiated by the department without any extra cost in case shortage of MIDC water supply & unforeseen circumstances. (e) A recovery for non supply of water will be charged from contractor @ Rs 5000.00 per bowser as penality for non compliance of contract provision. (f) Bowser should have the facility to pump the water directly to overhead tank for ( Ground to 10 floors) ie. 1 stories to 11 stories. Pumping set and hose pipe cost is deemed to be included in the rate quoted. (g) Water shall be supplied by the contractor from the authorised source of water point as approved and authorised by Engr -in- charge and contractor will sumit the permission letter from competant authority for supply of the water to department under the contract.
M.K Enterprises
R A Electric Co.
Om Sai Enterprises
Sagar Electricals
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .