| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L Quoted ₹9.9 L | L1 | Accepted-AOC Lowest Tender Rate Quotated |
| 2 | L2₹9.9 LRejected-Finance | ₹9.9 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | S.Mariappan | G.Murugan |
|---|---|---|---|---|---|
| 1.00Construction of Bus Shelter Building | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 19.7 | Cum | 5,196.86 ₹6,132.29 | 5,195.88 ₹6,131.14 |
| 1.02 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 5.9 | Cum | 32,205.15 ₹38,002.08 | 32,203.97 ₹38,000.68 |
| 1.03 | Brickwork in cement mortar 1:5 mix using country bricks of size 8 ¾” x 4 ¼" x 2 ¾” including cost and conveyance of all materials to site etc., complete. | 15.85 | Cum | 99,488.87 ₹1.2 L | 99,487.28 ₹1.2 L |
| 1.04 | Supplying and Erecting centering for sides and soffits including supports and strutting up to 3.30 m height with all cross bracing for plane surfaces as detailed below, using mild steel sheets of 90 X 60 cm 10 gauge stiffened with MS angle of 25 x 25 x 3m | 113.36 | Sqm | 1,24,185.88 ₹1.5 L | 1,24,129.2 ₹1.5 L |
| 1.05 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. | 12.87 | Cum | 1,20,283.02 ₹1.4 L | 1,20,281.73 ₹1.4 L |
| 1.06 | Supplying and fabricating RTS / TMT STEEL rods including cutting, bending hooks, cranking, fabricating,assembling and laying in exact position,typing with softsteel wire 16 gauge ,etc., complete conforming to BIS std. | 14.7 | Qtl | 1,35,056.25 ₹1.6 L | 1,35,053.31 ₹1.6 L |
| 1.07 | Weathering Course with brick jelly lime concrete to 0.075m thick and Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.of cement used & the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, Red oxide etc., complete. | 32.6 | Sqm | 53,917.14 ₹63,622.23 | 53,913.88 ₹63,618.38 |
| 1.08 | Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete. | 199.84 | Sqm | 57,214.19 ₹67,512.74 | 57,204.2 ₹67,500.96 |
| 1.09 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 25.5 | Sqm | 7,892.25 ₹9,312.86 | 7,890.98 ₹9,311.36 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
3 Oct 2025, 3:00 pmClosed
BDO (BP)
BDO Office, Sattur
Construction of s Shelter at N.Mettupatti Village and Panchayat
2025_RDTN_607773_1
A7/1178/2025
Open Tender
Civil Works
Sattur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
28 Feb 2026
23 Sept 2025
3 Oct 2025
23 Sept 2025
3 Oct 2025
23 Sept 2025
Construction of Bus Shelter Building
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Brickwork in cement mortar 1:5 mix using country bricks of size 8 ¾” x 4 ¼" x 2 ¾” including cost and conveyance of all materials to site etc., complete.
Supplying and Erecting centering for sides and soffits including supports and strutting up to 3.30 m height with all cross bracing for plane surfaces as detailed below, using mild steel sheets of 90 X 60 cm 10 gauge stiffened with MS angle of 25 x 25 x 3m
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Supplying and fabricating RTS / TMT STEEL rods including cutting, bending hooks, cranking, fabricating,assembling and laying in exact position,typing with softsteel wire 16 gauge ,etc., complete conforming to BIS std.
Weathering Course with brick jelly lime concrete to 0.075m thick and Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.of cement used & the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, Red oxide etc., complete.
Plastering in cement mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Plastering in cement mortar 1:3 mix, 10mm thick including cost and conveyance of all materials to work site from the approved sources and labour charges etc., complete.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with Printed design glazed tiles of size 30 cm x20cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 with best approved quality with standard specification and as directed by the departmental officer
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Providing, fabricating and fixing M.S. grills Windows, and ventilator,gates, ladders, rail pipes, nosing angles, with M.S.lugs in staircase steps etc., made out of M.S rods, flats, angles, pipes, channels etc. including necessary fixtures complete as per drawings and specifications and as directed by the Engineer.
Labour charges for fixing MS Grill along with frames in position and right to plumb including other incidental charges etc., complete
Providing Rainwater Harvesting Structure arrangement
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cost and supply of 110mm Dia PVC Pipe with standard specification and as directed by the departmental officer
Cost and supply of 110mm Dia PVC Bend with standard specification and as directed by the departmental officer
Collection and supply of 40mm HBG metal and filling in to the leach pits including cost and conveyance to the siteand all labour charges for filling as per standard specifications
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid