Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹26.0 L+₹8.3 L (46.5%)Rejected-Finance LAMA VILLA DYMMIEW SHILLONG 793002 | EAST KHASI HILLS | MEGHALAYA | 793002 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹26.5 L+₹8.8 L (49.3%)Rejected-Finance 7TH MILE P O NONGLYER UPPER SHILLONG 793002 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793002 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹27.0 L+₹9.3 L (52.3%)Rejected-Finance 16 GANGADHAR BABU LANE C R AVENUE KOLKATA 700012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹29.1 L+₹11.4 L (64.2%)Rejected-Finance | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S DEEDAR ENTERPRISE L11 | S K ENTERPRISE L7 | M/S RAGHU NATH SAH L8 | HAMZA CONSTRUCTION CO L4 | Bhuiya Construction L6 | M/S BISWA CONSTRUCTION L10 | M/S DIL SINGH BISWA AND CO L2 | M/s Gupta Construction L9 | madan enterprise L3 | M/S R.D. Electricals L5 | MAHINDER ELECTRICALS L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches not exc 1.50 mtr wide and not exc 1.50 mtr in depth for taking out/laying of under ground cable, pole or stay and getting out in soft/loose soil, complete all as specified and as directed. | 291.6 | Cum | 265 ₹77,274 | 750 ₹2,18,700 | 650 ₹1,89,540 | 200 ₹58,320 | 500 ₹1,45,800 | 700 ₹2,04,120 | 600 ₹1,74,960 | 500 ₹1,45,800 | 400 ₹1,16,640 | 500 ₹1,45,800 | 155 ₹45,198 Lowest |
| 2.00 | Returning filling in soft/loose soil, including, spreading, levelling, watering and well ramming in layers not exc. 25 cm complete all as specified and directed.
NOTE : The top of filled trench shall be made proud by using the excavated soil to cater for subsequent settlement of soil. | 163.9 | Cum | 76 ₹12,456.4 | 250 ₹40,975 | 300 ₹49,170 | 50 ₹8,195 Lowest | 300 ₹49,170 | 450 ₹73,755 | 350 ₹57,365 | 300 ₹49,170 | 220 ₹36,058 | 290 ₹47,531 | 62 ₹10,161.8 |
| 3.00 | Removing excavated materials (soils) not exc 50.00mtr and depositing where directed at a level not exc 1.50 mtr above the starting point in soil, complete all as specified and as directed. | 127.7 | Cum | 125 ₹15,962.5 | 640 ₹81,728 | 650 ₹83,005 | 150 ₹19,155 | 210 ₹26,817 | 600 ₹76,620 | 550 ₹70,235 | 400 ₹51,080 | 400 ₹51,080 | 450 ₹57,465 | 62 ₹7,917.4 Lowest |
| 4.00 | Supply and filling for dry sand in cable protection trenches before and after the cables are laid, for sand cushioning to cables complete all as specified and directed.
NOTE : thickness after punning of sand shall be (minimum as specified in SSR) measured and paid in this item. | 87.48 | Cum | 1,850 ₹1,61,838 | 4,000 ₹3,49,920 | 2,000 ₹1,74,960 | 1,600 ₹1,39,968 | 1,920 ₹1,67,961.6 | 4,000 ₹3,49,920 | 1,800 ₹1,57,464 | 2,200 ₹1,92,456 | 2,500 ₹2,18,700 | 1,800 ₹1,57,464 | 999 ₹87,392.52 Lowest |
| 5.00 | Material and labour for brick protection for UG XLPE cable with burnt clay old size sub class 'B' bricks laid dry and flat abutting each other with gaps between adjacent brick not more than 10mm and width equal to length of brick in trenches across the cable complete all as directed by Engineer-In-Charge.
Make: Best quality locally available which is duly approved by GE. | 9.4 | Per 1000 Nos | 16,500 ₹1,55,100 | 11,000 ₹1,03,400 | 10,000 ₹94,000 Lowest | 15,000 ₹1,41,000 | 19,000 ₹1,78,600 | 12,000 ₹1,12,800 | 17,000 ₹1,59,800 | 11,000 ₹1,03,400 | 10,000 ₹94,000 Lowest | 20,000 ₹1,88,000 | 11,111 ₹1,04,443.4 |
| 6.00 | Taking down exixting old unserviceable LT cable of any size | 1,350 | RM | 125 ₹1,68,750 | 70 ₹94,500 | 130 ₹1,75,500 | 25 ₹33,750 | 70 ₹94,500 | 100 ₹1,35,000 | 40 ₹54,000 | 100 ₹1,35,000 | 50 ₹67,500 | 60 ₹81,000 | 9.99 ₹13,486.5 Lowest |
| 7.00Supply and laying, connecting, testing, commissioning LT UG cable XLPE Insulated,armoured, electric power cables (heavy duty) 1100 Volts grade conforming to IS 7098 with aluminium conductor multi-strand laid in trenches / ducts/ inside protection pipe including cable glands, lugs and suitable size of MS saddle clips etc complete all as directed by Engr-In-Charge of following sizes:- Note:-(a) Excavation, sand cushioning, bricks shall be measured and paid separately | ||||||||||||||
| 7.01 | 2 core 10 Sqmm | 50 | RM | 465 ₹23,250 | 250 ₹12,500 | 300 ₹15,000 | 270 ₹13,500 | 300 ₹15,000 | 300 ₹15,000 | 300 ₹15,000 | 300 ₹15,000 | 200 ₹10,000 | 400 ₹20,000 | 130 ₹6,500 Lowest |
| 7.02 | 2 core 16 Sqmm | 100 | RM | 525 ₹52,500 | 300 ₹30,000 | 320 ₹32,000 | 301 ₹30,100 | 400 ₹40,000 | 350 ₹35,000 | 390 ₹39,000 | 400 ₹40,000 | 240 ₹24,000 | 500 ₹50,000 | 148 ₹14,800 Lowest |
| 7.03 | 3.5 core 25 Sqmm | 100 | RM | 625 ₹62,500 | 400 ₹40,000 | 500 ₹50,000 | 489 ₹48,900 | 490 ₹49,000 | 500 ₹50,000 | 450 ₹45,000 | 500 ₹50,000 | 380 ₹38,000 | 600 ₹60,000 | 242 ₹24,200 Lowest |
Tender Value
₹28 L
EMD Value
₹56,000
Closing Date
28 Aug 2025, 6:00 pmClosed
GE I AF SHILLONG
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
REPAIR/REPLACEMENT OF LT UG CABLES, LT PANELS, FEEDER PILLAR BOXES AND ALLIED WORKS AT 509 SU, AF STN LAITKOR PEAK UNDER GE (I) (AF) SHILLONG
2025_MES_724955_1
8043/25/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE I AF SHILLONG
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE I AF SHILLONG
₹56,000
Yes
12 Sept 2025
7 Aug 2025
30 Aug 2025
7 Aug 2025
28 Aug 2025
21 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .