Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.5 L+₹37,145 (7.21%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹5,400
Closing Date
27 Jun 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Civil TTPS
Office of the SE Civil TTPS TTN 4
Repair and Maintenance works to the North side of Power House building A row wall from column A 21b to column A 24.
2024_EB_453782_1
CE SE C TTPS Spec. No 122 24 25
Open Tender
Civil Works - Others
Item Rate
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,400
Yes
1 Aug 2024
12 Jun 2024
28 Jun 2024
12 Jun 2024
27 Jun 2024
12 Jun 2024
Providing two legged scaffolding, for works upto various heights as specified using 13 cm to 15 cm dia casuarina props, distance between two rows being 1.25 m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50 m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W planks of 40 mm thick and 1m width etc. complete using coir and nails.
Providing wooden platform with scaffolding arrangement using 10 to 13cm dia. Casurina posts and 40mm thick country wood planks for providing platform over the scaffolding including cost of all materials labour, lead, lift etc., complete.
Dismantling of existing RCC and clearing the debris 1 Km away from the site including cost of all labour, lead, lift, T&P etc. complete.
Providing RTS reinforcement cutting bending and tying in position with binding wire including cost of all materials labour, lead, lift, etc., complete.
Providing shuttering, centering using steel shutter, rate including cost of all materials labour, lead, lift etc., complete.
Providing RCC 1:1.5:3 using OP/PP cement with 6 to 10mm metal including cost of all materials, labours, lead, lift, tools, curing etc. complete.
Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, labours, lead, lift, curing, etc. complete
Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete.
Plastering with C.M.1:5, 12 mm thick with Nitobond AR mixed in cement mortar at 250ml/bag of cement including cost of all materials, labours, lead, lift, curing, etc. complete
Providing two coats with ready mixed plastic emulsion (exterior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete
Dismantling the existing pressed tiles & weathering course including cost of all materials, labours, lead, lift, curing, etc. complete.
Terrace flooring (weathering course) with one course of pressed tiles 200x200x20mm over CM 1:3, 20mm thk. mixed with crude oil 10% by weight of cement and pointing with the same oiled mortar over a bed of 80mm thick concrete broken brick jelly 20mm size in pure slaked lime with required slope over RCC roof slab including cost of all materials, labours, lead, lift, , curing, etc. complete.
SUGANYA ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .