Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹8.3 LRejected-Finance | ₹8.3 L | L2 | Rejected-Finance Highest Amount Quoted |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Due to EMD related issues |
| Sl No | Description | Qty | Unit | V.SELVARAJ & SONS L2 | Mr. G. Rajaiah, Contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148 | 14.04 | Cum | 197.84 ₹2,777.67 | 197.83 ₹2,777.53 |
| 2.00 | C.C. 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and all labour charges etc., complete | 9.36 | Cum | 5,353.82 ₹50,111.76 | 5,353.81 ₹50,111.66 |
| 3.00 | Supply and erection of Centering including cost and conveyance of all materials to site and all labour charges etc., complete - Core Wall | 131.04 | Sqm | 365 ₹47,829.60 | 364.95 ₹47,823.05 |
| 4.00 | C.C. 1:3:6 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete | 15.07 | Cum | 6,104.87 ₹92,000.39 | 6,104.86 ₹92,000.24 |
| 5.00 | Collection and supply of GSB including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 73.67 | Cum | 1,742.35 ₹1.3 L | 1,742.34 ₹1.3 L |
| 6.00 | Providing and Laying Paver Block of 60mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete. | 736.74 | Sqm | 696.16 ₹5.1 L | 696.15 ₹5.1 L |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
27 Jan 2026, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
Paver Block road
2026_RDTN_644307_2
A2/5647/2025
Open Tender
Civil Works - Roads
180 days
Manur
Refer tender doc
2 documents required · 2 mandatory
₹0
₹10,000
5 Feb 2026
17 Jan 2026
28 Jan 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
C.C. 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and all labour charges etc., complete
Supply and erection of Centering including cost and conveyance of all materials to site and all labour charges etc., complete - Core Wall
C.C. 1:3:6 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete
Collection and supply of GSB including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Providing and Laying Paver Block of 60mm thick approved design made out of 12mm and 6mm HBGS chips in M30 mix properly cured to attain the required strength, Laying and interlocking block and well compacted using 1-3 ton capacity compressor, the cost inclusive of all materials for manufacturing, interlocking block loading transportation to work site unloading and labour charges for fixing over Sand bed of 30mm thick & Joints filling using compressor of 1-3 ton capacity including hire and fuel charges for compressor and all other incidental charges etc complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_772043.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid