Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 CrAccepted-AOC KACHA PAHA PREET NAGAR ST NO 2 WARD NO 8 SUNAM DISTRICT SANGRUR PB | L1 | Accepted-AOC Due to lowest bid price | |
| 2 | L2₹6.9 Cr+₹4.1 L (0.60%)Rejected-Finance 205L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | L2 | Rejected-Finance Due to high bid price |
Tender Value
Refer Docs
EMD Value
₹13.9 L
Closing Date
16 Jun 2020, 1:15 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Provincial Division PWD BandR DAC Complex Sangrur
Upgradation and Improvement of road Majhi to Channo Bharo road via Phumanwal_Kheri Gillan_ Shahpur_Majhi to Phumanwal road_ Shahpur to Channo_Bharo road_ Phumanwal to Sangrur Patiala road along canal under NABARD_XXV Scheme
2020_CEPW_47182_1
Bid No 02 Dt. 27.04.2020
Open Tender
Civil Works - Roads
Percentage
240 days
Sangrur
Please refer Tender documents.
7 documents required · 7 mandatory
₹30,000
Joint Secretary PRBDB
₹13.9 L
25 Aug 2020
4 May 2020
16 Jun 2020
4 May 2020
16 Jun 2020
4 May 2020
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting trimming bottom with side slopes, in accordance with requirements of lines, grades and cross sections including all lifts and combined lead up to 60 mtr. | 3,806.4 | Per Cum | 29.72 | ₹1,13,126.21 |
| 2 | Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications | - | Per Mtr | 60.84 | - |
| 3 | Construction of embankment with earth obtained from roadway cutting or excavation including spreading, grading to required slope and compacting to meet requirement of table 300-2 as per technical clause 305 of MORT&H specifications | 3,806.4 | Per Cum | 89.79 | ₹3,41,776.66 |
| 4 | Construction of embankment with good quality earth obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per technical clause 305 of MORT&H specifications. | - | Per Cum | 188.66 | - |
| 5 | Compacting of earth work & preparation of sub grade including loosening and leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering rolling with a road roller and compacting the bed to achieve minimum dry density as given in table 300-2 as per technical clause 305 of MORT&H specification. | 12,688 | Per Sqm | 5.91 | ₹74,986.08 |
| 6 | Making 50 mm x 50 mm furrows 45 degree to the center line of the road and at one metre interval in the existing bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead complete as per technical clause 404 of MORT&H specifications (Full surface area will be measured for payment) | 15,860 | Per Sqm | 4.23 | ₹67,087.8 |
| 7 | Construction of granular sub-base by providing graded material grading-III Table-400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications | - | Per Cum | 1,316.04 | - |
| 8 | Dismantling of existing brick on end edging complete in all respect as per PWD specifications. | 162.38 | Per Cum | 85.12 | ₹13,821.79 |
| 9 | Providing, laying, spreading and compacting stone aggregates of Grading I to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications | - | Per Cum | 2,041.74 | - |
| 10 | Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications | - | Per Cum | 2,164.05 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
Tender Document • 0.41 MB
Tendernotice_2.pdf
Tender Document • 0.30 MB
SBD_Majhi_Channo.pdf
Tender Document • 15.41 MB
Corri_5.pdf
Tender Document • 0.08 MB
Corri_9.pdf
Tender Document • 0.06 MB
BOQ_89922.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .