Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC | ₹5.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.8 Cr+₹64.0 L (12.3%)Rejected-Finance AT GIRISH TAKIES KALYANPUR DIST JAMUI PIN 811307 | JAMUI | BIHAR | 811307 | ₹5.8 Cr+₹64.0 L (12.3%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical KACHAHRI ROAD BHAISASUR BIHARSHARIF NALANDA | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical GOPIKANDAR DUMKA JHARKHAND | DUMKA | JHARKHAND | 814101 | - | - | Rejected-Technical Non Responsive |
Tender Value
₹6.2 Cr
EMD Value
₹6.2 L
Closing Date
26 Mar 2024, 12:00 pmClosed
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
Reconstruction Work of Phutani Chowk (SH-15) to Chikaniya Chowk Road (Total Length-2.772 Km) under Road Division Dumka for the year 2023-24
2024_CECOM_85608_1
RCD/DUMKA/424
Open Tender
Civil Works
Item Rate
182 days
DUMKA
AS PER SBD
3 documents required · 3 mandatory
₹10,000
₹6.2 L
19 Jul 2024
14 Mar 2024
28 Mar 2024
14 Mar 2024
26 Mar 2024
14 Mar 2024
Amount
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)RCD SOR - 2.3 (I) (A)
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit., Girth from 300 mm to 600 mmRCD SOR - 2.01 (A (i)+B (i))
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit. Girth from 600 mm to 900 mmRCD SOR - 2.01 (A (ii)+B (ii))
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit. Girth from 900 mm to 1800 mmRCD SOR - 2.01 (A (iii)+B (iii))
Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. Upto 600mm diaRCD SOR - 2.04(ix)A
Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all the lifts and leads upto 1000 metres.By Mechanaical Means using Hydraulic excavatorRCD SOR - 3.15 i
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separatelyRCD SOR - 2.06
Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 mRCD SOR - 3.06
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Rate per cum after adding royalty@Rs 27.48/cumRCD SOR - 3.17
Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.RCD SOR - 3.16
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.RCD SOR - 3.18
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. grading VRCD SOR - 4.01 B V
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.RCD SOR - 4.14B
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.RCD SOR - 5.01A (i)
Tack Coat on Granular surfaces treated with primer. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.RCD SOR - 5.02 (ii)
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.RCD SOR - 5.02 (i)
Dense graded Bituminous Macadam Grading-II With VG-30 Bulk Bitumen Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 Bulk Bitumen.RCD SOR - 5.04A
Bituminous concrete Grading- II With VG-30 Bulk Bitumen Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects with VG-30 Bulk Bitumen.RCD SOR - 5.05(A)(B)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.RCD SOR - 6.1
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing RCD SOR - 6.2
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of class-B Type IV retro reflective sheeting fixed cover 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick aluminium composite material sheet depending on the size of the sign fixed over back support frame of min 25 x 25 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67. (I)75cm equilateral TriangleRCD SOR - 8.04 B iii
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of class-B Type IV retro reflective sheeting fixed cover 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick aluminium composite material sheet depending on the size of the sign fixed over back support frame of min 25 x 25 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67. 60 cm circularRCD SOR - 8.04 B viii
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of class-B Type IV retro reflective sheeting fixed cover 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick aluminium composite material sheet depending on the size of the sign fixed over back support frame of min 25 x 25 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67. 80 mm x 60 mm rectangularRCD SOR - 8.04 B x
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of class-B Type IV retro reflective sheeting fixed cover 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick aluminium composite material sheet depending on the size of the sign fixed over back support frame of min 25 x 25 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67. 60cm X 60cm SquareRCD SOR - 8.04 B xiii
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of class-B Type IV retro reflective sheeting fixed cover 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick aluminium composite material sheet depending on the size of the sign fixed over back support frame of min 25 x 25 x 3 mm Angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67. 90 cm high octagon RCD SOR - 8.04 B xv
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)RCD SOR - 8.06
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometer stone (precast)RCD SOR - 8.14(ii)
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting)RCD SOR - 8.16
Road Delineators (Supplying and installation of delineators (Road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 and the drawings.)RCD SOR - 8.15
Solar Powered Road Marker (Solar Stud) Supplying of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered, LED self illumination in active mode 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode.The marker shall support a load of 20000 kg tested in accordance to ASTM D 4280.The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand temperatures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow (amber) as per requirement and typical frequency of blinkikng in 1 Hz.There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhace the life of the marker and a full charge should provide for a minimum autonomy of 50 hours.The height, width and length of the marker shall not be less than 10mmx100mmx100 mm. Also, the surface diameter of the marker shall not be less than 100 mm respectively.The weight of the marker shall not exceed 0.5 Kilograms.Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the engineer.) RCD SOR - 8.35
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)RCD SOR - 8.08
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.)RCD SOR - 8.13
Providing and erecting overhead signs with a corrosion resistant 2mm thick aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and 802.3 and installed as per clause 802.7 over a designed support system of aluminium alloy or galvanised steel trestles and trusses of sections and type as per structural design requirements and approved plans. Truss and Vertical Support RCD SOR - 8.7 A
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 Using Concrete Mixer RCD SOR - 12.8 C II
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. RCD SOR - 12.42
Fixing of reflective sheeting including all cost of materials and fitting charge complete works as per specifications and direction of E/I.RCD SOR - NS
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil , Mechanical Means, Depth upto 3 mRCD SOR - 12.01 (I)B i
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC M-15 GradeRCD SOR - 12.08.A
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Random Rubble MasonryRCD SOR - 12.07 (B)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Random Rubble MasonryRCD SOR - 13.04 (A)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. PCC Grade M20, Height upto 5mRCD SOR - 13.05 B
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.RCD SOR - 16.04 A
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification RCD SOR - 16.05
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications RCD SOR - 13.03
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 1200mmdiaRCD SOR - 9.04 B
Numbering and writing of culvertRCD SOR - NS
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.RCD SOR - 12.04
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. RCC Grade M20, Height upto 5m,RCC Grade M20 using batching plant, transit mixer & concrete pumpRCD SOR - 13.05 E (p)
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification.RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump.For solid slab super-structure,Height upto 5mRCD SOR - 14.1 C I (p)
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsRCD SOR - 13.06
Add 18 % GST (in Basic Rate must fill 18)
Add 1% Labour Cess (in Basic Rate must fill 1)
SATISH KUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .