| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-Finance 303 B DIAMOND HARBOUR ROAD BEHALA KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | 1 | Accepted-Finance 1 | |
| 2 | 2₹5.2 L+₹30,932.43 (6.30%)Rejected-Finance 1 JOYRAMPUR JALA ROAD MAIL 42C SARADAMA UPANIBESH BEHALA KOLKATA 700060 | KOLKATA | WEST BENGAL | 700060 | 2 | Rejected-Finance 2 | |
| 3 | 3₹5.3 L+₹43,452.70 (8.85%)Rejected-Finance VILL P O KAMALPUR P S SAGAR DIST SOUTH 24 PARGANAS | SOUTH 24 PARGANAS | WEST BENGAL | 3 | Rejected-Finance 3 |
Tender Value
₹4.9 L
EMD Value
₹10,000
Closing Date
9 Mar 2026, 11:00 amClosed
Executive engineer (Uttaran Services)
1, Hogg. Street, Hogg Building, 3rd Floor, Kolkata - 700087
RESTORATION OF EXISTING DRAINAGE SYSTEM AND BANK PROTECTION OF BANGLAR BARI SITE WITH ANCILLARY WORK AT 34 HARISH CHATTERJEE STREET IN WD NO 73, BR IX.
2026_KMC_1015727_1
KMC/US/HQ/73/25-26/254
Open Tender
CIVIL WORKS
Percentage
45 days
WARD-73
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
27 Mar 2026
27 Feb 2026
11 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 6. Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 6. Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge). (b) For additional depth beyond 1.5 m. and upto 3.00 m
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 6. Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge) (c) For additional depth beyond 3.00 m.
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.
ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (b) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
PWD ROAD & BRIDGE WORKS 2018
BUILDING WORKS(S) WELL FOR WATER SUPPLY (1) Digging earth in any soil including mixed soil but excludingmoorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc.,when and if required and back filling with fine sand (including cost of sand) on completion of steining works. A) R.C.C. Ring Well i) 1.2 metre diameter of digging for 0.9 metre internal diameter of well ring. a) Upto 3 metre below G.L. N.B. a) Extra 10% per meter for work beyond the initial depth of 18 metre will be paid. b) For well done by sinking process 30% extra over the corresponding rate for digging the respective internal dia of the well will be allowed on the different stages of depth. (c) Extra rock cutting over the corresponding rate for digging for the respective internal diameter of the well will be allowed on the different stage of depth. i) 5% extra for cutting moorum. ii) 100 % extra in Laterite rock or sand stone cutting with chisel and jumpers, but not requiring blasting. iii) 200 % extra in hard rock requiring blasting including cost of explosive etc. and done with permission from the Engineer-in-Charge. iv) 300 % extra in hard rock in built up areas using chisel, jumper and manual labour.
BUILDING WORKS(S) WELL FOR WATER SUPPLY (1) Digging earth in any soil including mixed soil but excludingmoorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc.,when and if required and back filling with fine sand (including cost of sand) on completion of steining works. A) R.C.C. Ring Well i) 1.2 metre diameter of digging for 0.9 metre internal diameter of well ring. b) Beyond 3 metre upto 6 metre below G.L.. N.B. a) Extra 10% per meter for work beyond the initial depth of 18 metre will be paid. b) For well done by sinking process 30% extra over the corresponding rate for digging the respective internal dia of the well will be allowed on the different stages of depth. (c) Extra rock cutting over the corresponding rate for digging for the respective internal diameter of the well will be allowed on the different stage of depth. i) 5% extra for cutting moorum. ii) 100 % extra in Laterite rock or sand stone cutting with chisel and jumpers, but not requiring blasting. iii) 200 % extra in hard rock requiring blasting including cost of explosive etc. and done with permission from the Engineer-in-Charge. iv) 300 % extra in hard rock in built up areas using chisel, jumper and manual labour.
BUILDING WORKS (S) WELL FOR WATER SUPPLY: 2. R.C.C. well ring made with cement concrete 1:1.5:3 with stone chips and 0.80% reinforcement (including the cost of shuttering and reinforcement) cast at site fitted and fixed in position after proper curing true to plumb in the well including jointing with cement mortar 1:2 complete as per direction. b) 65 mm thick and 1.2 metre internal dia. Cement for joint filling-6 Kg/m.
BUILDING WORKS (S) WELL FOR WATER SUPPLY: 2. R.C.C. well ring made with cement concrete 1:1.5:3 with stone chips and 0.80% reinforcement (including the cost of shuttering and reinforcement) cast at site fitted and fixed in position after proper curing true to plumb in the well including jointing with cement mortar 1:2 complete as per direction. a) 65 mm thick and 0.9 metre internal dia. cement for joint filling-4 kg/meter.
SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (iv) 15 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover: 460 mm X 75 mm Frame: 620 mm X 150 mm opening: 360mm Weight: 100 kg (approx)
Sub Total
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
BOQ_2494966.xls
BOQ • 0.35 MB
TF.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .