Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹12,740
Closing Date
13 Aug 2026, 12:00 pm
SE/TEDC/TJR
No 1 VALLAM ROAD THANJAVUR
AS PER TENDER SPECIFICATION
2026_EB_690122_1
07/26-27, dt 31.07.2026
Open Tender
Civil Works
Works
138 days
Thanjavur Circle
REGISTERED CONTRACTORS
2 documents required · 2 mandatory
₹0
₹12,740
Yes
31 Jul 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
13 Aug 2026
31 Jul 2026
31 Jul 2026 - 13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Housekeeping | |||||
| 1.01 | Sweeping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails including clearing and disposal of waste papers daily,mopping of the office floors ,steps, staircases, handrails with scented cleaning agents twice a week, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. (To be carried out daily) | 1,32,882.16 | m2 | - | - |
| 1.02 | Sweeping of the office floors (Flooring with Cement Mortar) steps, staircases, handrails including clearing and disposal of waste papers daily,mopping of the office floors ,steps, staircases, handrails with scented cleaning agents twice a week, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. (To be carried out daily) | 1,90,495.46 | m2 | - | - |
| 1.03 | Sweeping and mopping of the office lobby such as Cash collection center (Flooring with mosaic) steps,staircases, handrails with scented cleaning agents including clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets,Swabs, Mops, Dungry cloths, Buckets, cost of all consumables etc. complete. | 51,183.37 | m2 | - | - |
| 1.04 | Sweeping of the office lobby such as Cash collection center (Flooring with Cement mortar) steps,staircases, handrails including clearing and disposal of waste papers and debris daily, and mopping with scented cleaning agents twice a week , cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets,Swabs, Mops, Dungry cloths, Buckets, cost of all consumables etc. complete. | 62,907.85 | m2 | - | - |
| 1.05 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc.. ( To be carried out all working days). | 3,99,136.22 | m2 | - | - |
| 1.06 | Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell.( 3 times in a day). Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb) | 1,23,655.59 | m2 | - | - |
| 1.07 | Water closets (IWC / EWC) | 5,520 | Nos | - | - |
| 1.08 | Wash basins | 10,488 | Nos | - | - |
| 1.09 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls) | 3,312 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_829567.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].