| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | -31.55% | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 LAdmitted-Finance | -27.07% | ₹3.3 L | L2 | Admitted-Finance |
| 3 | L3₹3.5 LAdmitted-Finance A 207 AVAS VIKAS COLONY BUDAUN | BUDAUN | BUDAUN | UTTAR PRADESH | -22.93% | ₹3.5 L | L3 | Admitted-Finance |
| 4 | L4₹3.7 LAdmitted-Finance | -18.09% | ₹3.7 L | L4 | Admitted-Finance |
| 5 | L5₹4.2 LAdmitted-Finance 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | -6.91% | ₹4.2 L | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
14 Jul 2026, 11:00 amClosed
EXECUTIVE ENGINEER BDA BIKANER
BDA CAMPUS BIKANER
E-BID-06-2026-27 WORK NO 01
2026_UITBK_573091_1
E-BID-06-2026-27
Open Tender
Civil Works
Percentage
90 days
BIKANER
E-BID-06-2026-27 WORK NO 01
2 documents required · 2 mandatory
₹1,000
SECRETARY BDA BIKANER
₹10,000
Yes
20 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding: Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect. | 3,000 | sqm | 80 | ₹2,40,000 |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 15 | CUM | 3,302 | ₹49,530 |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : | 300 | SQM | 69 | ₹20,700 |
| 4 | Providing and applying white cement based putty over
plastered surface to prepare the surface even and smooth complete New Plastered Surface (three or more coats) | 550 | SQM | 84 | ₹46,200 |
| 5 | Kota stone slab flooring 25 mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1: 4 (1 cement : 4 coarse sand) For area of each slab from 2001 to 5000 Sq.Cm | 140 | SQM | 1,023 | ₹1,43,220 |
| 6 | Total | - | Nos | - | - |
| 7 | 2 Percent | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.51 MB
SP01.pdf
Tender Documents • 2.06 MB
BOQ_1019487.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].