| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance 12 1 1 PUDHUSAMPALLI RAMAN NAGAR POST METTUR DAM 636 403 | METTUR DAM | SALEM | TAMIL NADU | 636403 | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.0 LAccepted-Finance 2 206 C PONNAGAR METTUR DAM 636 401 SALEM DISTRICT | SALEM | TAMIL NADU | 636401 | ₹3.0 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | V PALANIVELU CONTRACTOR L1 | SARVESWARASAMY AND CO L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for releasing the top covers, side covers, racking out of all LT modules / Breakers, releasing of hylam sheets in the vertical bus bars and cleaning of all the covers with soap water. (CWPH SWGR–I to IV & CT SWGR–I to IV and common) | 9 | Nos | 4,400 ₹39,600 | 4,500 ₹40,500 |
| 2.00 | Charges for complete cleaning of Horizontal, vertical bus bars, LT Breakers/ modules and supporting insulators with the help of air blower and Suitable Solvent, tightness checking of Horizontal, vertical bus bars, Incomer breaker terminals and outgoing power cable terminals. (CWPH SWGR–I to IV & CT SWGR–I to IV and common) | 9 | Nos | 3,440 ₹30,960 | 3,500 ₹31,500 |
| 3.00 | Charges for cleaning of all power contactor tips in LT modules / Breakers, tightness checking of power cables, checking and cleaning of arc chutes etc. (CWPH SWGR–I to IV & CT SWGR–I to IV and common) | 9 | Nos | 3,440 ₹30,960 | 3,500 ₹31,500 |
| 4.00 | Charges for refixing of SWGR top, side covers and racking in the Breakers / modules, and commissioning the SWGR. (CWPH SWGR–I to IV & CT SWGR–I to IV and common) | 9 | Nos | 4,200 ₹37,800 | 4,300 ₹38,700 |
| 5.00 | Charges for releasing the top covers, side covers, racking out of all LT modules / Breakers, releasing of hylem sheets in the vertical busbars and cleaning of all the covers with soap water. (ACW SWGR–I to IV and Misc PH SWGR-I & II) | 6 | Nos | 4,400 ₹26,400 | 4,500 ₹27,000 |
| 6.00 | Charges for complete cleaning of Horizontal, vertical busbars, LT Breakers/ modules and supporting insulators with the help of air blower and Suitable Selvant, tightness checking of Horizontal, vertical busbars, Incomer breaker terminals and outgoing power cable terminals. (ACW SWGR–I to IV and Misc PH SWGR-I & II) | 6 | Nos | 2,680 ₹16,080 | 2,800 ₹16,800 |
| 7.00 | Charges for cleaning of all power contactor tips in LT modules / Breakers, tightness checking of power cables, checking and cleaning of arc chutes etc. (ACW SWGR–I to IV and Misc PH SWGR-I & II) | 6 | Nos | 2,680 ₹16,080 | 2,800 ₹16,800 |
| 8.00 | Charges for refixing of SWGR top, side covers and racking in the Breakers / modules, and commissioning the SWGR. (ACW SWGR–I to IV and Misc PH SWGR-I & II) | 6 | Nos | 3,440 ₹20,640 | 3,500 ₹21,000 |
| 9.00 | Charges for Opening and closing of power cable terminal box cover and star point cover, disconnection and connection of power cable and star point, for measuring IR value and DC resistance , 6.6KV, 1175KW | 12 | Nos | 1,930 ₹23,160 | 2,000 ₹24,000 |
| 10.00 | Charges for Removal and cleaning of fan cover, fan, grill with soap water, cleaning of motor and coolers with forced air, removal of NDE & DE bearing housing cover, releasing old grease & applying new grease and assembling of all dismantled parts and external cleaning. | 12 | Nos | 3,650 ₹43,800 | 3,800 ₹45,600 |
Tender Value
Refer Docs
EMD Value
₹2,800
Closing Date
12 Mar 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-II SD-II CWPH complete cleaning tightness checking of horizontal ,vertical bus bars,incomer terminals and improving IR value of CWPH SWGR-I to IV,ACWP SWGR-I toIV CT SWGR-I to IV and common Switchgear,misc PH SWGR-III,Disconnect
2026_EB_667479_1
CE-MTPSI-SE-ES-EM2-OT158-25-26
Open Tender
Electrical Works
15 days
MTPS-I/METTURDAM
As per tender specification
4 documents required · 4 mandatory
₹0
₹2,800
Yes
4 Jun 2026
26 Feb 2026
13 Mar 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
Charges for releasing the top covers, side covers, racking out of all LT modules / Breakers, releasing of hylam sheets in the vertical bus bars and cleaning of all the covers with soap water. (CWPH SWGR–I to IV & CT SWGR–I to IV and common)
Charges for complete cleaning of Horizontal, vertical bus bars, LT Breakers/ modules and supporting insulators with the help of air blower and Suitable Solvent, tightness checking of Horizontal, vertical bus bars, Incomer breaker terminals and outgoing power cable terminals. (CWPH SWGR–I to IV & CT SWGR–I to IV and common)
Charges for cleaning of all power contactor tips in LT modules / Breakers, tightness checking of power cables, checking and cleaning of arc chutes etc. (CWPH SWGR–I to IV & CT SWGR–I to IV and common)
Charges for refixing of SWGR top, side covers and racking in the Breakers / modules, and commissioning the SWGR. (CWPH SWGR–I to IV & CT SWGR–I to IV and common)
Charges for releasing the top covers, side covers, racking out of all LT modules / Breakers, releasing of hylem sheets in the vertical busbars and cleaning of all the covers with soap water. (ACW SWGR–I to IV and Misc PH SWGR-I & II)
Charges for complete cleaning of Horizontal, vertical busbars, LT Breakers/ modules and supporting insulators with the help of air blower and Suitable Selvant, tightness checking of Horizontal, vertical busbars, Incomer breaker terminals and outgoing power cable terminals. (ACW SWGR–I to IV and Misc PH SWGR-I & II)
Charges for cleaning of all power contactor tips in LT modules / Breakers, tightness checking of power cables, checking and cleaning of arc chutes etc. (ACW SWGR–I to IV and Misc PH SWGR-I & II)
Charges for refixing of SWGR top, side covers and racking in the Breakers / modules, and commissioning the SWGR. (ACW SWGR–I to IV and Misc PH SWGR-I & II)
Charges for Opening and closing of power cable terminal box cover and star point cover, disconnection and connection of power cable and star point, for measuring IR value and DC resistance , 6.6KV, 1175KW
Charges for Removal and cleaning of fan cover, fan, grill with soap water, cleaning of motor and coolers with forced air, removal of NDE & DE bearing housing cover, releasing old grease & applying new grease and assembling of all dismantled parts and external cleaning.
Material cost:-1. Diesel
2. Soap powder
3. Soap Powder
3.CRC(250ML)
Consumables for Switchgears
Consumables for HT motors
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_801861.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid