Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-AOC FLAT NO S 2 SHRI CHINTAMANI S NO 1 1148 MAHAJAN PETH MODEL COLONY SHIVAJI NAGAR PUNE 411016 | PUNE | PUNE | MAHARASHTRA | 411016 | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹35.3 L+₹6.0 L (20.4%)Rejected-Finance 607 6TH FLOOR PRATEEK CENTRE SANJAY PLACE AGRA 282002 | AGRA | UTTAR PRADESH | 282002 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹38.9 L+₹9.5 L (32.5%)Rejected-Finance 154 HANUMAN MANDIR DIKSHI TAL NIPHAD DIST NASHIK 422 302 | NASHIK | MAHARASHTRA | 422302 | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹39.0 L+₹9.6 L (32.7%)Rejected-Finance | L4 | Rejected-Finance NOT LOWEST |
Tender Value
₹36 L
EMD Value
₹72,000
Closing Date
17 Jul 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE DEOLALI
HQ CWE DEOLALI, ONSLOW ROAD, DEOLALI (MH)
AS PER TENDER DOCUMENTS
2023_MES_603969_1
83633/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
NASIK
AS PER NIT
7 documents required · 7 mandatory
₹500
Yes
GE NASIK ROAD CAMP
₹72,000
Yes
12 Sept 2023
17 Jun 2023
19 Jul 2023
17 Jun 2023
17 Jul 2023
3 Jul 2023
18 Jun 2023 - 24 Jun 2023
Amount
Supply , installation, testing and comission of Smart prepaid Meter (IS-16444), AC whole current,single phase, 2 wires Smart Energy Meter of rating 6/10-60 Amps, 240 Volts, 50 Hz class-I complete as specified in CEA notification including PVC transparent protective meter box of suitable size as recommended by OEM . The meter shall communicate with Head End System (HES) on any of the communication technologies mentioned in IS-16444 Part-I in a secure manner . The slection of communication technology should be as per the site conditions and as per design consideration of AMI Implementing agency to meet the performance. The smart meter can be based on RF communication technology or Cellular communication technology.
Supply , installation, testing and comission of Smart prepaid Meter (IS-16444), AC whole current, three phase, 4 wires Smart Energy Meter of rating 10-60 Amps , 415 Volts, 50 Hz class-I complete as specified in CEA notification including PVC transparent protective meter box of suitable size as recommended by OEM. The meter shall communicate with Head End System (HES) on any of the communication technologies mentioned in IS-16444 Part-I in a secure manner . The slection of communication technology should be as per the site conditions and as per design consideration of AMI Implementing agency to meet the performance. The smart meter can be based on RF communication technology or Cellular communication technology.
Note (A) For item No. 1&2 : The smart meters should have the following minimum basic features :- (a) Measurement of electrical energy parameters. (b) Bidirectional Communication. (c) Integrated Load limiting/ connect/ disconnect switch. (d) Tamper event detection, recording and reporting. (e) Power event alarms as per IS 16444 Part-I. (f) Remote firmware upgrade. (g) Pre paid features (as per IS 15959 Part-2). (h) TOD features. (j) On demand reading. (k) The meter should support open communication protocol DLMS with software.
Note (B) For item No. 1&2 : Smart Meter on RF Communication Technology:- The Smart Meter (IS-16444), AC whole current, single phase, 2 wires & three phase, 4 wires, Smart Energy Meter of rating 10-60 Amps Single phase / 10-60 Amps three phase complete as specified in CEA notification. The meter shall communicate with Head End System (HES) on any of the communication technologies mentioned in IS-16444 Part-I in a secure manner. The smart meter shall be based on RF communication technology including Gateways and Repeaters.
Note (C) For Item No. 1&2: Smart Meter based on Cellular Communication Technology:- The Smart Meter (IS-16444), AC whole current, single phase, 2 wires Smart Energy Meter of rating 10-60 Amps complete as specified in CEA notification. The meter shall communicate with Head end System (HES) on any of the communication technologies mentioned in IS-16444 Part-I in a secure manner. The Smart meter shall be based on Cellular communication technolgy. (a) Only one type of meter shall be used . Mix- matching of smart meters based on RF or Cellular communication shall not be allowed during execution of work. (b) WARRANTY:-The meter shall carry 18 months (minimum) warranty. During the warranty contractor shall replace defective meter without any extra cost to department.Defect liability period of subject work is 24 months.It will be contractors resposibility to rectify defects noticed during this period without any extra cost to the department.
Supply and Configuration of the Web based Software with following modules: (i) Meter Data Management Module The meter data management module shall be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system shall capture and provide the following data: (a) 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency (b) Monthly billing survey data for cum energy and max demand. (ii) Postpaid /Prepaid Billing Module: The billing module shall collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module shall include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It shall allow postpaid and prepaid functionality as required. (iii) Occupation and Vacation Module The system shall support occupation / vacation and billing reports. the software shall be collecting data from Gateway. The software shall provide access to staff as well as the occupant for the data.
Item No 7 Contd/--- (iv) Customer Portal The system shall include a customer portal for the resident /occupant to log in and view their own energy / billing data. There shall be android and iOS mobile apps for the user to monitor its own data and balance on regular basis. (v) Web based software for communication system for smart meter has to be audited by CERI-INDIA empanelled firm. Cost of audit is to be borne by the contractor. (vi) In case of future expansion is envisaged, software must have compatibility to accommodate smart meters software and hardware.
Item No 7 Contd/--- (v) Energy Accounting Module The system shall include features of energy accounting. The system shall be able to account for total energy block wise, facility wise and shall also allow calculations of unaccounted energy in case total energy meter is also available. (vi) Customer Care Module - the software shall include a customer care module where the user shall be log in any complaints. The service provider shall monitor the complaints and carry out the necessary activities for the complaints resolution. (vii) Meter Installation Module - The software shall include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself. (viii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email. (ix) The cost of Ist SIM and SIM Charges for entire period of contract shall deemed to be included with the above items. Note: The software shall contain two year defect liability including all operating expenses such as GPRS charges, hosting charges etc.
Supply and Installation of IP-67 protection Data Concentrator Units (Gateway) compatible for remote Advanced Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter in the corresponding frequency band and with the data server through GPRS/Ethernet. It shall have internal memory to store data of at least 200 modules. It shall have inbuilt battery back-up. It would have IP-67 protection. It shall support auto discovery of the meters for the breaks in the RF network. Make: L&T, Schneider or as per standard of OEM of smart meter.
Four years Comprehensive AMC include the followings. The AMC will start from the date of completion of work under Phase I and shall continued for four years. The AMC would include supplied, GPRS/Internet (SIM) Charges, Software AMC, 24X7 Customers care support, reconfiguration of the meters if required. (a) Monthly sim charges for the DCU. The contractor shall ensure supply of appropriate SIMs to ensure necessary signal availability. The contractor shall change the sim or sim provider as required. In case of network issues, the contractor shall liaison with the telecom service providers for necessary resolution. (b) Recurring SMS charges. The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts. (c) Software AMC. This shall include necessary upgradations in the software such as support to the chrome browser changes, android version changes , iOS version changes. These changes happen on frequent basis and the software shall support all the changes. (d) Remote server admin support - Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc. (e) Software installation on any alternate / backup server if required. (f) The communication network monitoring and support. (g) Configuration of the repaired / replaced hardware in the system. (h) Trouble shooting and necessary actions to run the system as required. (j) Software bug fixing as and when required.
INVENTIVE SOFTWARE SOLUTIONS PVT LTD
MAHIMA CONSTRUCTION
M/S SVOJAS ELECTROMECH ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .