| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance F 16 GANESH SHANKAR VIDYARTHI NAGAR PANKI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹2.0 L+₹600 (0.30%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹2.0 L+₹2,100 (1.06%)Accepted-Finance | L3 | Accepted-Finance FOUND OK |
| Sl No | Description | Qty | Unit | M/S SWASTIC CONTRUCTION L3 | POOJA ENTERPRISES L1 | LAL BAHADUR CONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Removing of All HV & LV connection. | 1 | Job | 5,900 ₹5,900 | 5,800 ₹5,800 Lowest | 5,800 ₹5,800 Lowest |
| 2.00 | Safe demounting of LV/HV bushings. | 1 | Job | 6,500 ₹6,500 | 6,400 ₹6,400 Lowest | 6,400 ₹6,400 Lowest |
| 3.00 | Remounting of LV/HV side bushings after changing oil seals itc as per norms. | 1 | Job | 5,800 ₹5,800 Lowest | 6,000 ₹6,000 | 6,000 ₹6,000 |
| 4.00 | Safe Dismantling of Radiator Banks. | 6 | No. | 6,800 ₹40,800 Lowest | 7,000 ₹42,000 | 7,000 ₹42,000 |
| 5.00 | Safe Remounting of Radiator Banks as per norms, complete in all respect. | 6 | No. | 6,500 ₹39,000 | 6,300 ₹37,800 Lowest | 6,300 ₹37,800 Lowest |
| 6.00 | Draining Out of Transformer Oil of Power T/F and filling it in Drums using perfectly clean and demoisturized drums. All T&P drums, consumables will be arranged by the contractor. | 1 | Job | 14,500 ₹14,500 Lowest | 14,500 ₹14,500 Lowest | 14,500 ₹14,500 Lowest |
| 7.00 | Replacement of all gaskets of transformer and all Oil seals of HV/LV Bushings and other metal parts, etc. All material will be provided by the contractor. | 1 | Job | 14,800 ₹14,800 Lowest | 14,800 ₹14,800 Lowest | 15,000 ₹15,000 |
| 8.00 | Refilling of T/F Oil using clean and demoisturized oil drums oil will be filtered and demoisturized before refilling by the contractor. | 1 | Job | 18,700 ₹18,700 Lowest | 18,700 ₹18,700 Lowest | 19,000 ₹19,000 |
| 9.00 | Fixing of all HV/LV connections/Buchholz Relay, top cover plate as per standard and mounting of all accessories. | 1 | Job | 7,200 ₹7,200 | 7,100 ₹7,100 Lowest | 7,200 ₹7,200 |
| 10.00 | OCC, SCC testing as per NORMS and complete meggaring of Transformer. 5 MVA Power Transformer, its connections, accessories and all parts, all joints will be tested mechanically and electrically, complete in all respect. Safe Energisation and safe electrical loading of Transformer will be the sole responsibility of the contractor. | 1 | Job | 15,000 ₹15,000 Lowest | 15,000 ₹15,000 Lowest | 15,000 ₹15,000 Lowest |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
4 Feb 2026, 6:00 pmClosed
SE EDC BARABANKI
33/11 KV SUBSTATION BAREL BARABANKI
82/2025-26/
2026_MVVNL_1107554_2
82/2025-26/EDC BARABANKI
Open Tender
Electrical Works
Fixed-rate
30 days
EDD FATEHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BARABANKI
₹2,000
18 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
4 Feb 2026
30 Jan 2026
Removing of All HV & LV connection.
Safe demounting of LV/HV bushings.
Remounting of LV/HV side bushings after changing oil seals itc as per norms.
Safe Dismantling of Radiator Banks.
Safe Remounting of Radiator Banks as per norms, complete in all respect.
Draining Out of Transformer Oil of Power T/F and filling it in Drums using perfectly clean and demoisturized drums. All T&P drums, consumables will be arranged by the contractor.
Replacement of all gaskets of transformer and all Oil seals of HV/LV Bushings and other metal parts, etc. All material will be provided by the contractor.
Refilling of T/F Oil using clean and demoisturized oil drums oil will be filtered and demoisturized before refilling by the contractor.
Fixing of all HV/LV connections/Buchholz Relay, top cover plate as per standard and mounting of all accessories.
OCC, SCC testing as per NORMS and complete meggaring of Transformer. 5 MVA Power Transformer, its connections, accessories and all parts, all joints will be tested mechanically and electrically, complete in all respect. Safe Energisation and safe electrical loading of Transformer will be the sole responsibility of the contractor.
Transformer oil centrifuging.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.86 MB
BOQ_2052102.xls
BOQ • 0.28 MB
Tenderno82document.pdf
Tender Documents • 1.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .