| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 LAccepted-AOC AT SAIMALA DIVANMAL TAL PEN DIST RAIGAD | PEN | RAIGAD | MAHARASHTRA | ₹34.4 L | L1 | Accepted-AOC accepted |
| 2 | L2₹34.9 LRejected-AOC PLOT NO 06 SAI PALACE APARTMENT PAWARNAGAR JUNI SANGVI PUNE 27 | PUNE | MAHARASHTRA | ₹34.9 L | L2 | Rejected-AOC rejected |
| 3 | L3₹35.2 LRejected-AOC | ₹35.2 L | L3 | Rejected-AOC rejected |
Tender Value
₹34.4 L
EMD Value
₹34,405
Closing Date
11 May 2026, 10:00 amClosed
Executive Engineer (RWS), kunthebag, alibag tal- a
Executive Engineer (RWS), kunthebag, alibag tal- alibag dist- raigad
Construction Of RCC Protection Wall Near River At.Ghote G.P.Ghote, Tal.Pen Dist.Raigad
2026_RAIGA_1298175_1
RAIGAD/RWSS/12/2026-27
Open Tender
Civil Works - Water Works
180 days
At.Ghote G.P.Ghote, Tal.Pen Dist.Raigad
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹34,405
18 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item no:1 - Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for etc. complete Lift 0.00 M to 1.50 m | 81 | Cum | 205.7 | ₹16,661.7 |
| 2 | Itemno:2 - Excavation for foundation / pipe trenches in soft rock including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for | 81 | Cum | 691.9 | ₹56,043.9 |
| 3 | ItemNo.3- Dewatering the excavatyed trenches and pools of water by using pumps and other devices including disposing of the water to safe distance as directed by Engineer-in-Charge (including cost of machinery labour fuel )etc complete. | 1,080 | BHP Hr. | 97.9 | ₹1,05,732 |
| 4 | Item No.4-Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15
cm to 20 cm thick including hand packing and compacting etc.
complete. | 16.1 | Cum. | 1,447.6 | ₹23,306.36 |
| 5 | Item No.5:- Providing and laying in situ Cement concrete in proporation .... of trap metal for foundation and bedding, including balling out water manually, formwork, compacting and curing etc. complete.P.C.C 1:2:4 | 12.08 | Cum. | 6,469.1 | ₹78,146.73 |
| 6 | Item No. 6 :- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. ( By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-250grade 1) R.C.C. M-200 for vertical wall | 209.3 | Cum. | 10,244.3 | ₹21,44,131.99 |
| 7 | Itemno: 7 - Providing & laying weep holes of 80mm AC/PVC pipe as per drawing for abutment returns, return walls etc. complete. | 42 | Rmt | 254.1 | ₹10,672.2 |
| 8 | Item No.8:-Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes,caps,footing, foundation,slab, beams, columns,canopies, staircase, newels, chajjas, lintels,pardies,coping,fine arches etc. as per detailed designs, drawing & schedule s including cutting,bending,hooking the bars, binding with wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel | 4.93 | MT | 80,681 | ₹3,97,757.33 |
| 9 | Item no:9-Providing, constructing coffer dam in river basin / dam storages as per type design including excavation, filling, the middle portion with B. C. soil (in gunny bags if requried). Providing impervious / semipervious materials on both side of B.C. soil (in gunny bags if required) including ramming, compacting to the satisfaction of Engineer-in-charge, till the complction of work including
dismantling coffer dam after completion of works and disposing off the material as directed by the Engineer-in-charge. | 72 | Nos | 899.8 | ₹64,785.6 |
| 10 | Item no:10-Providing and fixing 90 cm x 60 cm Marble plate engraving 10 cm. height letter , figures including paint ing the lefters/ figures with approved colour and shade complete | 1 | Nos | 8,408.4 | ₹8,408.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.15 MB
BOQ_2229725.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid